Tender Value
₹38.0 L
EMD Value
₹76,000
Closing Date
26 Jun 2026, 12:00 pm
SE RED CIRCLE BAREILLY
SE RED CIRCLE BAREILLY OFFICE
Interlocking and drainage construction work in Village Punau, from Mewaram Temple up to Ajay Pal Baithak meeting area Jagat
2026_REDUP_1160356_2
323/RED/Nivida-file Badaun/E-Nivida/2026-27 dated 31-05-2026
Open Tender
Civil Works - Roads
90 days
JAGAT BADAUN
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹76,000
SE RED CIRCLE BAREILLY OFFICE
13 Jun 2026
13 Jun 2026
26 Jun 2026
13 Jun 2026
26 Jun 2026
13 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required sloe and compecting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 but extra for carted earth quanitity lead upto 3.00 km. including first km. cartage and loading and unloading of earth. | 60 | CUM | 185.25 | ₹11,115 |
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing bymix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specificatin Clause 401. | 70 | CUM | 3,630.73 | ₹2,54,151.1 | |
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 4.7-405(3) | 135 | SQM | 4,665.86 | ₹6,29,891.1 | |
Earthwork in excavation in ordinary soil , loam, clay or sand including lift upto 1.5m & upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches into the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation trenches. required for proper completion of the work (rate as per PWD bly circle. Sor dt. 15-04-2025) S.I.No. 251 | 146.16 | CUM | 198.55 | ₹29,020.07 | |
Cement concrete wit 4cm gauge approved brick,ballast ,approved Fine sand and cement in the proporation of 1:6:12 including supply of all materials, labour and T&P etc.required for proper completion of the work (rate as per PWD bly circle. Sor dt. 15-04-2025) S.I.No.273 | 46.83 | Km. | 3,519.75 | ₹1,64,829.89 | |
First Class Brick work in 1:4 cement and coarse sand mortar in foundation complete including supply of all materials, labour and T&P etc.required for proper completion of the work.(rate as per PWD bly circle. Sor dt. 15-04-2025) SI.No.305 | 179.83 | SQM | 5,301 | ₹9,53,278.83 | |
12 mm thick plaster with cement & coarse sand of 2.25 F.M. in 1:5 mortar over brick work including supply of all materials, labour and T & P including all. S.I.No-584(i) | 422 | SQM | 206.15 | ₹86,995.3 | |
Cement concrete wit 2cm gauge approved stone,ballast ,approved coarse sand and cement in the proporation of 1:2:4 including supply of all materials, labour and T&P etc.required for proper completion of the work (rate as per PWD bly circle. Sor dt. 15-04-2025) S.I.No.279(i) | 17.37 | SQM | 7,887.85 | ₹1,37,011.95 | |
Supply and laying of factory made 80 mm thick tiles of precost compressed C.C. passing minimum 30 mpa compassive strength I.S.I. marked including levelling and dressing of surface to required level and slope filling joints with local sand including cost of all materials labour and T&P etc. but excluding cost of local and required for porper completion of the work as per directed by E/L As per SI no. ch. 20 road work new Item I. | 1,800 | SQM | 831.25 | ₹14,96,250 | |
R.C.C Work with cement approved coarse sand and 2cm gauge approved stone ballast in proportion of 1:1.5: 3 in substructure excluding supply of reinfocement and its binding but including its fixing and binding the same with binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc.required for proper completion of the work (rate as per PWD bly circle. Sor dt. 15-04-2025) item no. 283 but for slab. S.I.No.284 | 1.68 | CUM | 8,474 | ₹14,236.32 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.04 MB
BOQ_2174625.xls
BOQ • 0.26 MB
2t2.pdf
Tender Documents • 2.95 MB
Download all tender documents and submit your bid