| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC | ₹6.3 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹6.4 LRejected-AOC | ₹6.4 L | L2 | Rejected-AOC Rejected |
| 3 | L3₹6.8 LRejected-AOC | ₹6.8 L | L3 | Rejected-AOC Rejected |
| 4 | L4₹7.2 LRejected-AOC | ₹7.2 L | L4 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Alexander L3 | Antonyselvan L4 | Linga Kumar L L1 | PRABU ENGINEERING L2 |
|---|---|---|---|---|---|---|---|
| 1.00Name of Work:1)Construction of Compound Wall around Segregation Shed at Samuvelnagar in Pitchivi lai Village Panchayat. | |||||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 27.57 | m3 | 263.52 ₹7,265.25 | 276.97 ₹7,636.06 | 36.3 ₹1,000.79 | 255.87 ₹7,054.34 |
| 3.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 3.45 | m3 | 5,726.19 ₹19,755.36 | 6,018.52 ₹20,763.89 | 5,700 ₹19,665 | 5,606.02 ₹19,340.77 |
| 4.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.8 | Mt | 91,803.4 ₹73,442.72 | 96,490.07 ₹77,192.06 | 90,000 ₹72,000 | 89,159.86 ₹71,327.89 |
| 5.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 9.36 | m3 | 9,454.05 ₹88,489.91 | 9,936.69 ₹93,007.42 | 9,000 ₹84,240 | 9,231.42 ₹86,406.07 |
| 6.00Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | |||||||
| 7.00 | Ground Level | 22.91 | m2 | 546.95 ₹12,530.62 | 574.88 ₹13,170.50 | 547 ₹12,531.77 | 531.07 ₹12,166.81 |
| 8.00 | Above Ground Level | 64.73 | m2 | 1,093.9 ₹70,808.15 | 1,149.75 ₹74,423.32 | 1,095 ₹70,879.35 | 1,062.15 ₹68,752.97 |
| 9.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 6.56 | m3 | 6,223.94 ₹40,829.05 | 6,541.68 ₹42,913.42 | 6,000 ₹39,360 | 6,101.45 ₹40,025.54 |
| 10.00 | Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 171.51 | m2 | 286.24 ₹49,093.02 | 300.86 ₹51,600.50 | 270 ₹46,307.70 | 278.46 ₹47,759.21 |
Tender Value
₹7.3 L
EMD Value
₹7,330
Closing Date
24 Nov 2025, 3:00 pmClosed
Block Developmenet officer (BP)
Block Developmenet officer (BP) Panchayat Union office, Tiruchendur
1Construction of Compound Wall around Segregation Shed at Samuvelnagar in Pitchivilai Village Panchayat 2 Providing Extension of Pipeline from Borewell to 30000 litre OHT to Samuvelnagar in Pitchivilai Village Panchayat.
2025_RDTN_624425_1
A2/2726/2025-1
Open Tender
Civil Works - Buildings
60 days
Tiruchendur Union
As Per Tender Schedule
4 documents required · 4 mandatory
₹0
₹7,330
Panchayat Union office, Tiruchendur
20 Feb 2026
18 Nov 2025
24 Nov 2025
18 Nov 2025
24 Nov 2025
18 Nov 2025
22 Nov 2025
Amount
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Ground Level
Above Ground Level
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Supplying and painting two coats new iron work such as steel doors ventilators, window bars etc., (WITHOUT PRIMER)
Supply And Fixing New Door charges etc
Supply and fixing of 6Ksc PVC pipe including all cost and conveyance charges
90mm PVC Pipe
75mm PVC Pipe
Earth work execavation abd depositing on bank with in intial lead of 10 mts and lift of 2 mts in narrow trenches for laying the pipes in all kinds of soils as directed by the departmental officers
Laying and jointing pipeline including all cost and conveyance charges
Refilling the execavated soils in the trenches including all cost and conveyance charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
PRABU ENGINEERING (BID ID -1519552)
Alexander (BID ID -1518814)
Antonyselvan (BID ID -1518823)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_746725.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
TechnicalBidsinglecoverCompoundwallandEPLatsamuvelnagarinpitchivilaipanchayat.pdf
Tender Documents • 0.58 MB
BOQ_746725.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid