| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | -16.53% | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹65,099.99 (0.40%)Admitted-Finance CAMP JAYU MAJRI COLLIERY PO SHIVAJINAGAR TEHSIL BHADRAWATI DISTRICT CHANDRAPUR MS | CHANDRAPUR | CHANDRAPUR | MAHARASHTRA | -16.20% | ₹1.7 Cr+₹65,099.99 (0.40%) | L2 | Admitted-Finance |
| 3 | L3₹1.8 Cr+₹20.2 L (12.3%)Admitted-Finance CHANDRALOK BICHAYAT KENDRA SAMADHI WARD NEAR JAMA MASJID KOTWAL WARD DIST CHANDRAPUR CHANDRAPUR 442402 | CHANDRAPUR | CHANDRAPUR | MAHARASHTRA | 442402 | -6.30% | ₹1.8 Cr+₹20.2 L (12.3%) | L3 | Admitted-Finance |
| 4 | L4₹1.9 Cr+₹21.7 L (13.2%)Admitted-Finance | -5.52% | ₹1.9 Cr+₹21.7 L (13.2%) | L4 | Admitted-Finance |
Tender Value
₹2.3 Cr
EMD Value
₹2.9 L
Closing Date
23 Jun 2026, 5:00 pmClosed
Staff Officer (Civil), Chandrapur Area
Office of AGM, CHA
Shifting of one nos. Dumper shed from POC to BOC along with provision of rooms at two locations under BSA of Chandrapur Area (Retender).
2026_WCL_360588_1
WCL_CHA_civil_2026-27_eT-027
Open Tender
Civil Works - Others
Percentage
300 days
BSA, Chandrapur Area
As per NIT
5 documents required · 5 mandatory
₹2.9 L
7 Aug 2026
3 Jun 2026
24 Jun 2026
3 Jun 2026
23 Jun 2026
4 Jun 2026
3 Jun 2026 - 12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.999 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 898.57 | cum | 200.85 | ₹1,80,477.78 |
| 0.999 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 251.95 | cum | 2,191.15 | ₹5,52,060.24 |
| 0.999 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 146.05 | cum | 6,287.2 | ₹9,18,245.56 |
| 0.000 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 229.44 | cum | 7,974.6 | ₹18,29,692.22 |
| 0.999 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement:
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.54 | cum | 9,394.95 | ₹61,442.97 |
| 0.000 | Reinforced cement concrete work in beams, suspended foors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 17.14 | cum | 9,906 | ₹1,69,788.84 |
| 0.999 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 24,294.57 | kg | 95.25 | ₹23,14,057.79 |
| 0.000 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 170.18 | sqm | 742.35 | ₹1,26,333.12 |
| 0.999 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 211.82 | sqm | 577.2 | ₹1,22,262.5 |
| 0.000 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/sqm including pointing the joints with white cement and matching pigment etc., complete. | 202.8 | sqm | 949.9 | ₹1,92,639.72 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.39 MB
BOQ_373458.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .