Loading…
Loading…
Tender Value
₹7.7 L
EMD Value
₹22,989
Closing Date
10 Aug 2026, 1:30 pm
DFO Kishtwar
Forest Complex Sarkoot Kishtwar
BOQ
2026_FD_317564_1
27 of 2026
Open Tender
Agricultural or Forestry
Percentage
60 days
Nagseni Range
SBD
2 documents required · 2 mandatory
₹600
DFO Kishtwar
₹22,989
23 Jul 2026
23 Jul 2026
12 Aug 2026
23 Jul 2026
10 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (1). Comptt. 10b/N. Construction of Fire Line: Construction of Fire line, site clearance, cutting of bushes, removing of old rotten and fallen material, leaf litter and making of ditches along the fire line and dry stone structures down the hill side to prevent rolling of burning logs and disposal of inflammable material to outside of forest. Complete 2 Kmsx10 mtr of Fire line in all respect. | 2 | Km | 29,250 | ₹58,500 |
| 2 | (2). Comptt. 12a/N. Construction of Fire Line: Construction of Fire line, site clearance, cutting of bushes, removing of old rotten and fallen material, leaf litter and making of ditches along the fire line and dry stone structures down the hill side to prevent rolling of burning logs and disposal of inflammable material to outside of forest. Complete 2 Kmsx10 mtr of Fire line in all respect. | 2 | Km | 29,250 | ₹58,500 |
| 3 | (3). Comptt. 12b/N. Construction of Fire Line: Construction of Fire line, site clearance, cutting of bushes, removing of old rotten and fallen material, leaf litter and making of ditches along the fire line and dry stone structures down the hill side to prevent rolling of burning logs and disposal of inflammable material to outside of forest. Complete 2 Kmsx10 mtr of Fire line in all respect. | 2 | Km | 29,250 | ₹58,500 |
| 4 | (4). Comptt. 13/N. Construction of Fire Line: Construction of Fire line, site clearance, cutting of bushes, removing of old rotten and fallen material, leaf litter and making of ditches along the fire line and dry stone structures down the hill side to prevent rolling of burning logs and disposal of inflammable material to outside of forest. Complete 2 Kmsx10 mtr of Fire line in all respect. | 2 | Km | 29,250 | ₹58,500 |
| 5 | (5). Comptt. 14a/N. Construction of Fire Line: Construction of Fire line, site clearance, cutting of bushes, removing of old rotten and fallen material, leaf litter and making of ditches along the fire line and dry stone structures down the hill side to prevent rolling of burning logs and disposal of inflammable material to outside of forest. Complete 2 Kmsx10 mtr of Fire line in all respect. | 2 | Km | 29,250 | ₹58,500 |
| 6 | (6). Comptt. 14b/N. Construction of Fire Line: Construction of Fire line, site clearance, cutting of bushes, removing of old rotten and fallen material, leaf litter and making of ditches along the fire line and dry stone structures down the hill side to prevent rolling of burning logs and disposal of inflammable material to outside of forest. Complete 2 Kmsx10 mtr of Fire line in all respect. | 2 | Km | 29,250 | ₹58,500 |
| 7 | (7). Comptt. 14c/N. Construction of Fire Line: Construction of Fire line, site clearance, cutting of bushes, removing of old rotten and fallen material, leaf litter and making of ditches along the fire line and dry stone structures down the hill side to prevent rolling of burning logs and disposal of inflammable material to outside of forest. Complete 2 Kmsx10 mtr of Fire line in all respect. | 2 | Km | 29,250 | ₹58,500 |
| 8 | (8). Comptt. 16/N. Construction of Fire Line: Construction of Fire line, site clearance, cutting of bushes, removing of old rotten and fallen material, leaf litter and making of ditches along the fire line and dry stone structures down the hill side to prevent rolling of burning logs and disposal of inflammable material to outside of forest. Complete 2 Kmsx10 mtr of Fire line in all respect. | 2 | Km | 29,250 | ₹58,500 |
| 9 | (9). Comptt. 4a/N. Construction of Fire Line: Construction of Fire line, site clearance, cutting of bushes, removing of old rotten and fallen material, leaf litter and making of ditches along the fire line and dry stone structures down the hill side to prevent rolling of burning logs and disposal of inflammable material to outside of forest. Complete 2 Kmsx10 mtr of Fire line in all respect. | 2 | Km | 29,250 | ₹58,500 |
| 10 | (10). Comptt. 4b/N. Construction of Fire Line: Construction of Fire line, site clearance, cutting of bushes, removing of old rotten and fallen material, leaf litter and making of ditches along the fire line and dry stone structures down the hill side to prevent rolling of burning logs and disposal of inflammable material to outside of forest. Complete 2 Kmsx10 mtr of Fire line in all respect. | 2 | Km | 29,250 | ₹58,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_1041146.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].