Mandatory Documents
RequiredInsurance Surety Bond, Demand Draft/ Account Payee Bankers Cheque / FDR/ Bank Guarantee of any commercial Bank against EMD.
RequiredValid Enlistment order of the appropriate class for CPWD registered contractors
RequiredCopy of receipt of deposition of original EMD in prescribed format provided in NIT to Division Office of any Executive Engineer, CPWD (including NIT issuing EE).
RequiredCertificate of Registration for GST, if already obtained by the bidder. If the bidder has not obtained GST registration as applicable, then he shall scan and upload following undertaking along with bid documents
Requiredif work is awarded to me, I/we shall obtain GST registration certificate, as applicable, within one month from the date of receipt of award letter or before release of any payment by CPWD, whichever is earlier, failing which I/we shall be responsible for any delay in payments which will be due towards me/us on account of the work executed and/or for any action taken by CPWD or GST department in this regard
RequiredUndertaking on Structural Stability and Soundness as per prescribed format Annexure-IV Page 38 of NIT (Undertaking Form Enclosed as Annexure-IV, Page 38)
RequiredERP training Certificate regarding successful completion of ERP Training
RequiredIf the Buildings and Roads (Erstwhile Composite/Building/Infrastructure) Category contractor doesnt have work experience for Specialised Works as per NIT then the said Buildings and Roads (Erstwhile Composite/Building/Infrastructure) Category contractor shall upload an undertaking as per Annexure-III, Page 37 of NIT (Undertaking Form Enclosed as Annexure-III, Page 37)
RequiredSelf attested copies of completion certificates/ Work experience i.e. SITC of Audio System, Video System, VRV/VRF System and Fire Alarm System
Requiredi) Completion certificate should be issued by the not below the rank of Executive Engineer or authorized signatory of the department, will have to be scanned and uploaded. Incomplete certificate shall be summarily rejected. The completion certificate must clearly indicate the following. (Originals shall also be produced for verification if required)
Requireda) The date of completion of work. b) Nature and value of the work. c) That the work has been completed satisfactorily. d) Actual work done amount of completion certificate of each specialized component separately i.e for SITC of SITC of Audio System, Video System, VRV/VRF System and Fire Alarm System
RequiredNote- If there are more than one specialized E and M Services in the completion certificate the amount of SITC of Audio System, Video System, VRV/VRF System and Fire Alarm System should be clearly mentioned in the completion certificate or any supporting document regarding to find out SITC of Audio System, Video System, VRV/VRF System and Fire Alarm System amount should be mentioned.
RequiredWillingness Certificate (For Electrical Work) as per NIT Page No. 45
RequiredMemorandum of Understanding (M.O.U) between (For Electrical Work) as per NIT Page No. 46.
RequiredConsent Letter between Main Agency and Associated Specialized E and M Work Agency (for each Specialized Work Separately) as per NIT Page No. 47.
RequiredMemorandum of Understanding (M.O.U) between Main Agency and Associated Specialized E and M Work Agency / OEM (for each Specialized Work Separately) as per NIT Page No. 48.
RequiredComplete Address, E-mail and Mobile no. of the firm/agency on the letter head of firm / agency (for making correspondence).