| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.5 LAccepted-AOC C 8 9 SECTOR 4 ELDICO ESTATE HUDA SECTOR 40 PANIPAT 132103 | PANIPAT | PANIPAT | HARYANA | 132103 | ₹16.5 L Quoted ₹17.7 L | L1 | Accepted-AOC ok |
| 2 | L2₹20.4 LRejected-Finance HOUSE NO 685 SECTOR 7 URBAN ESTATE KARNAL 132001 | KARNAL | KARNAL | HARYANA | 132001 | ₹20.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹20.8 LRejected-Finance HOUSE NO 685 SECTOR 7 URBAN ESTATE KARNAL 132001 | KARNAL | KARNAL | HARYANA | 132001 | ₹20.8 L | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | parveen L2 | THE SHRI BALAJI COOP L AND C SOCIETY KARNAL L3 | THE DESHWAL CO-OP L AND C SOCIETY LTD. L1 |
|---|---|---|---|---|---|---|
| 1.00 | Recovery of usable hydraulic interlocking paver blocks as recovered from site. complete in all respects. | 9,228.73 | Each | 4.5 -₹41,529.29 | 4.6 -₹42,452.16 | 4.5 -₹41,529.29 |
| 2.00 | Repair of sewer connection at the site, including required material and labour charges, complete in all respects | 26 | Each | 1,500 ₹39,000 | 1,575 ₹40,950 | 1,800 ₹46,800 |
| 3.00 | Repair of water connection at the site, including required material and labour charges, complete in all respects | 32 | Each | 999 ₹31,968 | 1,500 ₹48,000 | 1,200 ₹38,400 |
| 4.00 | Repair to pot holes/patch repair on all types of bituminous pavement by using all weather instant patch repair cold readymix compound (INSSTAPATTCH/ SHELMMAC-PR/SHALIPATCH or equivalent products accredited by IRC) within specified shelf life including cleaning the existing portion of the road to be repaired by appropriate method, disposal of all failed material, compacting of the Engineer-in-charge.(irrespective of recorded premeasured area/ volume of pot holes repaired, to be measured for payment in multiple packs of 25/ 50 kg net HDPE bags with inside LDPE liner actually supplied | 950 | Kg. | 20 ₹19,000 | 25 ₹23,750 | 111 ₹1.1 L |
| 5.00 | Raising of manholes using brickwork in chambers | 25 | cum | 1,500 ₹37,500 | 1,675 ₹41,875 | 1,000 ₹25,000 |
Tender Value
₹18.3 L
EMD Value
₹36,660
Closing Date
4 Feb 2026, 5:00 pmClosed
Om Prakash Kardam
Municipal Corporation Karnal
Construction of cement concrete and laying of mastic asphalt in gali no.10 of Braham Nagar in Ward No. 14, M.C. Karnal. (Recall)
2026_HRY_499220_1
2026EDE3AF8F 7690 4898 B821 94EED2201274747ULB
Open Tender
Civil Works
120 days
Karnal
2 documents required · 2 mandatory
₹1,000
₹36,660
Yes
19 Mar 2026
28 Jan 2026
5 Feb 2026
28 Jan 2026
4 Feb 2026
28 Jan 2026
Recovery of usable hydraulic interlocking paver blocks as recovered from site. complete in all respects.
Repair of sewer connection at the site, including required material and labour charges, complete in all respects
Repair of water connection at the site, including required material and labour charges, complete in all respects
Repair to pot holes/patch repair on all types of bituminous pavement by using all weather instant patch repair cold readymix compound (INSSTAPATTCH/ SHELMMAC-PR/SHALIPATCH or equivalent products accredited by IRC) within specified shelf life including cleaning the existing portion of the road to be repaired by appropriate method, disposal of all failed material, compacting of the Engineer-in-charge.(irrespective of recorded premeasured area/ volume of pot holes repaired, to be measured for payment in multiple packs of 25/ 50 kg net HDPE bags with inside LDPE liner actually supplied
Raising of manholes using brickwork in chambers
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
[11.17]Providing and fixing of chicken wire mesh for avoiding cracks in plaster with necessary nail/screws etc. complete in all respect to the entire satisfaction of engineer-in-charge [Through Rate]
[11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate]
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]
[17.26.3]Tack Coat 3. Providing and applying tack coat with penetration grade bitumen VG-10 pressure distributor at the rate of 1.0 kg per sqm on the prepared granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications [Through Rate]
[17.37]Mastic Asphalt Providing and laying 25 mm/ 50 mm thick mastic asphalt wearing course with paving grade bitumen 85/25 or VG - 30/40 @ 10.2%, fine aggregates, course aggregates, lime filler @ 17.92% of total, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine-grained hard stone chipping at an approximate spacing of 10 cm centre to centre in both directions, pressed into surface when the temperature of surfaces is not less than 100C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 516 of MORT&H specifications (5th Revision, 2013) [Through Rate]
[17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate]
[2.B0017] B0017. Stone Aggregate (Single size) : 40 mm nominal size [Rate]
[2.B0242] B0242. 150 mm dia PVC pipe [Rate]
[21.53]Constructing standard drain type I drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be of 1.3.6 parts by volume of cement sand stone bajri and rendering to be 1:1 cement sand mortar [Through Rate]
[22.201.1.1]Providing and fixing in position pre-cast R.C.C. manhole cover and frame of required shape and approved quality 1.1. L D- 2.5 Rectangular shape 600x450 mm internal dimensions [Through Rate]
[3.1.1]By Mechanical Transport including loading, unloading and stacking 1. Lime, moorum, building rubbish [5km]
[5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate]
[5.3.1.2]Dismantling Stone Pitching 1.2. Dry Conditions Stone pitching laid dry, but grouted with natural silt and clay [Through Rate]
[6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.1.8]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 8. 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) [Through Rate]
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
[6.39.1]Providing and fixing at or near ground level precast cement concrete in kerbs, edgings etc. as per approved pattern and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), including the cost of required centering, shuttering complete. 1. 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate]
[6.56]Providing and filling in position, blown bitumen in expansion joints. [Through Rate]
[6.58]Providing and fixing in position 12mm thick bitumen impregnated fibre board conforming to IS: 1838, including cost of primer, sealing compound Grade-A in expansion joints. [Through Rate]
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_577796.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid