Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
30 Nov 2026, 11:00 am4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE MI NCTPS I CH 120
O/o SE MI NCTPS I CH 120
NCTPS1 SE MI Circle AOH 26 27 BM Dn Unit II ESP inlet C D Pass Patch up welding work for damaged flue gas duct portion from above Mech Hopper top expansion joint to ESP inlet Expansion joint I e before splitter assembly during annual overhaul for
2026_EB_730805_1
CE SE MI NCTPS I 214 26 27
Open Tender
Power/Energy Projects/Products
Works
25 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,000
Yes
25 Nov 2026
25 Nov 2026
30 Nov 2026
25 Nov 2026
30 Nov 2026
25 Nov 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MS. Plate 3.15mm thick, Including loading, transportation & Unloading. Manufacture test certificate shall be furnished. | 0.43 | Ton | 27,200 | ₹11,696 |
| 2 | Metallic expansion joints Size- 2696 X 2467 X 272 mm, Style#02, Full size, Location-ESP inlet | 4 | Nos | 26,323 | ₹1,05,292 |
| 3 | 100 NB MS ERW Pipe, confirming to IS 1239, Gr-Fe 330, Wall Thickness-5.4 mm, Make-Jindal / TATA / SAIL for Duct Supports | 24 | Mtrs | 21,624 | ₹5,18,976 |
| 4 | Providing scaffolding arrangement for renewal/ rectification works in flue gas duct portions from above Mech. Hopper top expansion joint to ESP inlet Expansion joint i.e before splitter assembly | 80 | M2 | 14,172 | ₹11,33,760 |
| 5 | Renewal of metallic expansion joints. Work involves arresting the upstream and down stream of duct, cutting and removal of existing eroded cover plate and metallic expansion joints; Leading, lifting, positioning of new expansion joints, aligning with the duct channel and complete welding; Fabrication of protection plate, fixing inside the Expansion joints and full welding at gas flow side. Including cost of consumables and T&P's.
Size- 2696 X 2467 X 272 mm, Style#02, Full size, Location-ESP inlet – 8Nos; (5.163 x 2 side x 2 No) = 20.65M required qty = 4 Nos x 20.65M =82.61M
Removal of existing eroded cover plates and refixing / renewal of new cover plates. Work involves expansion joint inspection and fabrication of protection plate,, cleaning welding. Total labour portion 25%) | 41.3 | Mtr | 9,448 | ₹3,90,202.4 |
| 6 | Renewal of metallic expansion joints. Work involves arresting the upstream and down stream of duct, cutting and removal of existing eroded cover plate and metallic expansion joints; Leading, lifting, positioning of new expansion joints, aligning with the duct channel and complete welding; Fabrication of protection plate, fixing inside the Expansion joints and full welding at gas flow side. Including cost of consumables and T&P's.
Size- 2696 X 2467 X 272 mm, Style#02, Full size, Location-ESP inlet – 8Nos; (5.163 x 2 side x 2 No) = 20.65M required qty = 4 Nos x 20.65M =82.61M
Renewal / Reconditioning of metallic expansion joints. Work involves arresting the upstream and down stream of duct, cutting and removal of existing eroded cover plate and metallic expansion joints; Leading, lifting, positioning of new expansion joints, aligning with the duct channel and complete welding; fixing inside the Expansion joints and full welding at gas flow side. Including cost of consumables and T&P's. Total labour portion 75%) | 82.61 | Mtr | 6,182 | ₹5,10,695.02 |
| 7 | Labour charges for welding eroded initial welding joints in the flue gas duct portion from above Mech. Hopper top expansion joint to ESP inlet Expansion joint i.e before splitter assembly. | 15 | M2 | 1,802 | ₹27,030 |
| 8 | Transporting of 6mm MS / Checkered plates, cutting into required size, leading, lifting, positioning on the eroded top portions of the duct wall after removal of wornout patch plates above 1.5 meter level and welding the same from flue gas duct portion from above Mech. Hopper top expansion joint to ESP inlet Expansion joint i.e before splitter assembly Including cost of consumables and T&Ps. | 10.7 | M2 | 901 | ₹9,640.7 |
| 9 | Charges for removing the existing eroded duct supports, supports for ESP entrance area and transporting of new pipes/Angles from Central Stores / NCTPS, cutting into required size leading lifting, positioning and welding. required size leading lifting, positioning and welding | 24 | M2 | 9,273 | ₹2,22,552 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
BOQ_876994.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .