Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.4 LAccepted-AOC | L1 | Accepted-AOC aoc | |
| 2 | L2₹17.8 L+₹1.2 L (7.38%)Rejected-Finance | L2 | Rejected-Finance Second lowest bidder | |
| 3 | L3₹19.5 L+₹2.9 L (17.2%)Rejected-Finance | L3 | Rejected-Finance Third lowest bidder | |
| 4 | L4₹19.5 L+₹2.9 L (17.4%)Rejected-Finance | L4 | Rejected-Finance Fourth lowest bidder | |
| 5 | L5₹20.7 L+₹4.1 L (24.8%)Rejected-Finance NEAR GURUDWARA JHANSI BHOPAL ROAD SAUGOR M P 470002 | SAUGOR | SAGAR | MADHYA PRADESH | 470002 | L5 | Rejected-Finance Fifth lowest bidder |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
1 Sept 2021, 6:00 pmClosed
GE Saugor
GE Saugor
COMPREHENSIVE MAINT AND REPAIR OF LIFT AND MECHANICAL LAUNDRY PLANT ALONGWITH COMPRESSOR AND CONNECTED ITEMS UNDER GE SAUGOR
2021_MES_458651_1
GE/SGR/TOK-23 OF 2021-22
Open Tender
Miscellaneous Works
Item Rate
330 days
Saugor
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE Saugor
₹40,000
Yes
23 Sept 2021
26 Jul 2021
3 Sept 2021
26 Jul 2021
1 Sept 2021
20 Aug 2021
Amount
Comprehensive maintenace with material, servicing, oiling, overhauling the fixtures, accessories and replacement of first moving parts as per manufacturer recommendation of Oil fired double chamber incineator of capacity 20Kg/hr with diesel oil pump mounted installed at MH Saugor complete all as specified and directed. Make :- Halt incineator
Note:-(i) To check the allignment of all machinaries and accordingly correct the same.(ii) Oiling and greasing of each machine by mechanical method like a pressure pump (iii) The rate for the minor parts required for repair is deemed to be included in the quoted rate no extra cost shall be paid to the contractor in this effect
Comprehensive , preventive and periodical maintenance of lifts (02 Nos) Make: OTIS (GEN 2 NOVA) for 13 Passenger / 884 Kg capacity each with travelling speed of 1.5 mtr /sec installed at Adm Block MRC under GE Saugor as mentioned here-in-after , in reliable, safe and efficient manner using latest techniques & expertise consultancy ( by manufacturer (OTIS) or Agency Authorized by them) by regularly using latest techniques & expertise consultancy by regularly examining , lubricating and adjusting the mechanical and electrical driving equipment , governor sleeve , shaft assembly , bearing / contact , governor jaws car & hall mechanical buttons , car & hall position indicators car direction indicators and all other car and landin signal / fixtures , deflectors, car and counter weight guide rails and buffers etc including replacement of defective / spares parts other than mentioned in Ser No w below , such as wire , lugs , nut, bolts , screws , hand rails, ventilating fan , holder, lubricant , gear oil, aircord , landing wheel , aircord wheel , rubber bush , rail guide shoe , all types of control panel & all type of their cards i.e. Air commutation card , TTU card , computer card, hardware card etc including welding, cutting, drilling etc as and when required, complete all as directed to entire satisfaction of Engineer – in- Charge
Note:- Comprehensive maintenance and repairs of all electrically operated lifts including replacement of spare parts shall be got executed by the contractor through only by OEM i.e. M/s OTIS or their authorised repesentative/personnel. Spare parts and other items to be incorporated shall be of make of OEM i.e. M/s OTIS or as approved by them.
The cost of all replaced defective parts / spares , other than mentioned in Srl item No.3 of BOQ here-in-after are deemed to be included in quoted rates and no extra cost shall be paid to the contractor in this effect .
The comprehensive / preventive / periodical maintenance includes weekly , fortnightly, monthly , quarterly , half yearly inspection / testing as per service manual .
The complete records of replaced spare parts , other than mentioned in Srl item No.3 of BOQ here-in-after will be maintained and will be produced to Engineer –in-charge on monthly basis or as and when asked to produce the same.
The AMC shall become in force immediately after issue of work order No-01 . The lifts willbe handed over to contractor in as and when condition and cost of all kind of repair / replacement of item to make it fully functional , other than mentioned in Srl item No.3 of BOQ here-in-after are deemed to be included in quoted rates and no extra cost shall be paid to the contractor in this effect.
All the complained will be addressed within 02 hrs from the time of receipt of complaint if,contractor or his tradesmen fails to attend the complained within 02 hrs from the time of receipt of complaint, the compensation / penalty of Rs 500.00 ( Rupees five hundred only) per complaint per hr for first 04 hrs and after that Rs 1000.00 ( Rupees One Thousand only ) Per complaint per hr shall be recovered from the contractors dues.
The cost of transportation ( to and from ) and other necessary equipment shall be arranged / brought by contractor to complete the job and no extra cost shall be paid to the contractor in this effect.
The contractor shall display his or his tradesmen’s / employee’s mobile / contact number in each lift car & at lift lobby and update from time to time.
Supply only the following items for lifts:-
LED bulbs 3 watt with reflector
Oscillator switch
Synchronization switch
Rail oil
Alarm bell
ELCB with MCB 16 Amps
Automatic Rescue Device
Door Sensor
Bty 12V 7 AH
Logic Board
Lift flooring Rubber Mat
Re-Gen drive
Comprehensive maintenance of (quarterly basis) mechanical laundry to wash, dry and ironing for an average load of various types of solid linen and including following equipments/machinery for MRC Saugor:- MAKE: FABCARE Note:- (a) The minor part required during comprehensive maintenance should be inculeded in the unit rate quoted by the tenderer. (b) The major part should be replaced and measured & paid seperately under relevant items of this schedule. (c) To check the allignment of all machinaries and accordingly correct the same. (d) To check and correct the weight arrangement of each machine and corrected it by the microprocesser card. (e ) Oiling and greasing of each machine by mechanical method like a pressure pump (f) Release the water collecting in compressor by atmosphere and WSB valve. (g) To check and re-fixing of single rolling chest for steam with air suspended iron chest. .
DETAILS OF PLANTS:- (a) Fully computerized Washing Machine, Washer Extractor, 60 Kg Capacity per charge, with High spin Extraction feature (with inbuilt Hydro Extractor) steam Heated, -2 No.
(b) Drying Tumbler, 60 Kg cap per charge, microbased digital controller, Steam Heated through stainless steel steam coils and aluminium fins . - 2 No.
(c) Flat work Ironer, single Roller, Chest Heated through steam with air suspended ironing chest, pneumatic lowering rising and lowering adjustable pressure 180 Degree contact angle, size of roller 300 mm length and 500 mm dia. - 1 No.
(d) Vacuum Ironing Table, Size of the table 1200 mm X 750 mm with imported steam iron and fittings. -2 Nos.
(e) Air compressor Model : LG 02100, Max input-10 Kg/cm2, Testing pressure 19.8 Kg/cm2, Displ WI-200 lpm compressed air at delivery point with tank capacity 100 Itr and Air supply pipe line complete - 1 No
(f) Single sink (1 person operated) microprocessor based manual shrub station size 40" (L) x 24" (W) x 48" (H) made of stainless steel-304 grade operated on 230 V AC 50 Hz complete -1No.
(g) Electric connections to each equipments/machines
(h) Wash linen trolley (for wet/dry linens) made out of Stainless Steel tubes & Stainless Steel cladding. . Size: 1000 x 800 x 800mm.
(j) Shelf trolley made of stainless steel size 1400(w)x700(d)x1900(h)mm with castor wheel 4 Nos.
(k) Mobile table with stainless steel top and shelfs of size 1330(w) x900 (d) x1000mm (h) with castor wheel 4 Nos.
(l) IBR compliant Steam boiler Model: RXA06/17.5/12, Evoparation-600Kg/hr WPR-17.18 bar, Out put-0.378 MW, 415V, 3Ph,50Hz having reverse of fuel technology steam output at safety valve set pressure of 10.5 Kg per square centimetre, LDO/HSD operated fixed complete with service tank - 01 No.
Comprehensive maintenance (Quartly basis) of Softner Plants as per the Thermax Norms suitable for IBR complaint steam boiler capable of generating steam 600 Kg per hour at 100DC having reverse of fuel technology steam output at safety valve set pressure of 15 Kg per square centimetre, LDO/HSD operated fixed complete at MRC Saugor.
Note:- (i) Ensure smooth operation of system / Ensure up time (ii) Corrections in Operation & Maintenance Practices to explore the chances of Operating Cost Reduction. (iii) Check the possibility of operation cost reduction by modifications. Efficiency optimization /improvement (iv) To get the Maximum out of Comprehensive Maintenance of the System. (v) Better planning for Spares/consumable Stocking to avoid the delay at the time of break down,though as authorized franchisee of Thermax, we are maintaining sufficient quantity of spares (vi) 100% availability of the unit for the service run.
Supply only the following items for Softner Plants:- Note: (i) contractor is required the quote the unit rate for the following items. These items will be operated as and when required on order in writing by Engr- in-charge. (ii) Department reserve right to operate these items at the extended it is required at site or not operated any item. (iii) The contractor shall take this aspect into account while quoting the rate the make following item shall be of item replaced in existing make as directed
Door gaskit as per existing sample
Air solonoid valve as per existing sample
Reverse forward timer as per existing sample
Butterfly valve 110 mm dia
Grease
Oil for machine as per recommended grade
Contactor
S/S pipe set as per sample
bearing including oil seal,cerclip, 'O' ring as per sample
Bush as per sample
Butterfly valve 100 mm dia including motor 2 HP Capacity, 415V, 3Ph as per sample
Rewinding of Motor 415V, 3Ph, 7.5 HP Capacity
Multiport valve 20NB as per sample
Tulsion Resion T-40 NB as per sample
Salt for softener
Chemical for discalling Maxclean 0.5 Make ;- Thermax
Dozing powder 32BS Make ;- Thermax
Fan belt
Rubber flexible hose 4'' dia
Comprehensive maintenance of Material and servicing, Overhauling with fixtures accessories replacement of moving parts changing as per manufaturer recommendation of Hydro sodium dozing system Model M-14, flow LPH Max out put 100, Max pressure 3.0 with three phase induction motor 0.37KW/0.5 HP capacity, 415V, 1.02 Amps, 0.71 PF and V-13, 1390 RPM installed Sewage Treatment plant at MRC Saugor complete all as specified and directed by Engineer-in-Charge Note:(i) To check the pressure of dozing plant as per company recommendation and accordinkly correct the same. (ii) The rate for the parts required for repair is to be included
Taking up/down the Non clogging submersible pump set 7.5 HP Capacity, 25.5 M head. 2.27 LPS, Pump model ; B4VJPE 0258, 2900 RPM existing location for servicing & overhauling including replacing the spares such as bearing and shaft etc complete for smooth functioning of the machineries and refixing in its original location complete all as specified and directed by Engineer -in-Charge
Taking up/down the Non clogging submersible pump set 7.5 HP Capacity, 25.5 M head. 2.27 LPS, Pump model ; B4VJPE 0258, 2900 RPM existing location for servicing & overhauling and taking out the burned PVC coated copper winding wire , cleaning the slots and rewinding the stator coil with same gauge of super enamelled PVC coated copper wire complete for smooth functioning and refixing in its original location complete all as specified and directed by Engineer -in-Charge Note: The spare parts to be replaced shall be measured and paid separetely
Supply only following items for pump sets:-
NDE/DE Bearing suitable for 7.5 Motor Non clogging pump set
Water Seal
Terminal Plate with cover
Taking out the defective compressor Motor 40 HP Capacity, 6.5 MWC Pressure,1390 RPM, Transport toe private works, dismantling the motor , taking out the burnt out winding coil, Cleaning the the slots with CTC and rewinding the same with new super enamelled copper winding wire of exising gauge and truns , oiling and greasing and fixing back into position for making motor fully functional and testing for satisfatory running complete all as specified and directed by Engineer-in-Charge. Note: The spare parts to be replaced shall be measured and paid separetely
Supply only following items for compressor:-
V Belt as per existing size
Compressor Oil
Terminal Box
Terminal Plate
Oil level indicator panel
Taking out the defective Filter feed pump KDS-1030+, 25M Head 10HP Capacity,,2900 RPM, Transport toe private works, dismantling the motor , taking out the burnt out winding coil, Cleaning the the slots with CTC and rewinding the same with new super enamelled copper winding wire of exising gauge and truns , oiling and greasing and fixing back into position for making motor fully functional and testing for satisfatory running complete all as specified and directed by Engineer-in-Charge. Note: The spare parts to be replaced shall be measured and paid separetely
Supply only following items for filter feed pump:-
NDE/DE Bearing suitable for 7.5 Motor Non clogging pump set
Terminal Plate with cover
M&L for dismantling centrifugal pump suitable for 7.5 HP Motor for carrying out repairs, replacement of worn out parts such as impellers, bearings, gland metal bushes etc., and reconditioning of spare parts such as shaft, impellers, housing body, bearing gland plate etc., by metalling and machining to their original shape and size and assembling back into position by using new suitable gland dory, gland plate, gland/rubber packing including studs/gland bolts and nuts, coupling bushes etc., oiling and greasing for making pumpset fully functional and testing for satisfactory running complete all as specified and directed by Engineer -in-Charge NOTE : The spare parts to be replaced shall be measured and paid Separately.
Supply only following items for centrifugal pump:-
NDE/DE Bearings
Gland flange with studs
Gun metal Bush (Male and female)
Taking out the Centrifuge (Decanter) Type -ALDER10, Max solid delivery 3.0 Kg/dm2 induction motor 5.3 HP Capacity,2931 RPM, Squre Case, Transport toe private works, dismantling the motor , taking out the burnt out winding coil, Cleaning the the slots with CTC and rewinding the same with new super enamelled copper winding wire of exising gauge and truns , oiling and greasing and fixing back into position for making motor fully functional and testing for satisfatory running complete all as specified and directed by Engineer-in-Charge. Note: The spare parts to be replaced shall be measured and paid separetely
Supply only following items for induction motor:-
NDE/DE Bearing suitable for 7.5 Motor Non clogging pump set
Terminal Plate with cover
M&L for dismantling centrifugal pump suitable for 5.3 HP Motor for carrying out repairs, replacement of worn out parts such as impellers, bearings, gland metal bushes etc., and reconditioning of spare parts such as shaft, impellers, housing body, bearing gland plate etc., by metalling and machining to their original shape and size and assembling back into position by using new suitable gland dory, gland plate, gland/rubber packing including studs/gland bolts and nuts, coupling bushes etc., oiling and greasing for making pumpset fully functional and testing for satisfactory running complete all as specified and directed by Engineer -in-Charge NOTE : The spare parts to be replaced shall be measured and paid Separately.
Supply only the following items for centrifugal pump 5.3 HP
NDE/DE Bearings
Gland flange with studs
Gun metal Bush (Male and female)
Taking out the Sludge pump set /1.5 KW/2.0 HP Capacity from Sewage collection sump ,Transporting to Authorised private work shop , Dismantling the Sludge outer casing body, impeller,oil seal and rotor, removing burnt winding coil complete, Cleaning the slot and rewinding the suitable PVC coated winding wire with ISI marked cleaning the meachnaical parts, replacing the worn out bearings, metalling the worn out shaft and replacing the Oil seal (ISI Marked), gland dory, gland plate, gland/rubber packing including studs/gland bolts and nuts, coupling bushes etc., oiling and greasing assembling the sumbersible pump set, painting with two coats of enamel paint over a coat of red oxider primer for making pumpset fully functional and testing for satisfactory running complete
Servicing the Sewage treament plant motor control panel, taking out the unserviceable starter, Contractors, LVC, Water level sensor, single phase preventor, temp sensor, water low level sensor, Volt meter , Multi functional meter, HRC Fuse carrier, relays etc and water proof PVC insulated flat multi core cable as per existing capacity, re-wiring the control panel for making serviceable condition including the cleaning of the panel inside using Air flower and testing for statisfactory serviceable condition completet all as specified directed by Engineer-in-Charge Note : The spares shall be measurerd and relevent items and paid separately
Supply only the following items for ewage treament plant motor control panel
Relay as per exisitng sample
LED indication lamop with holder
Star delta Starter suitable for 40 HP Motor as per exisitng sample
Star delta Starter suitable for 10 HP Motor as per exisitng sample
Star delta Starter suitable for 7.5 HP Motor as per exisitng sample
DOL Starter suitable for 5.3 HP Capacity motor as per existing sample
DOL Starter suitable for 2.0 HP Capacity motor as per existing sample
Push Button
Contactors as per model and sample
Single Phase preventor as per sample
PVC insulated flat submersible cable 3 core 4 Sqmm,1100V water proof Make:-Havells/Finolex/Polycab/Texmo
PVC insulated flat submersible cable 3 core 6 Sqmm,1100V water proof Make:-Havells/Finolex/Polycab/Texmo
M&L for excavation of soil up to 5cm root of the vegetation including cutting and removing e and surface dressing all around the installations under GE Saugor area to keep the installation area (external only) clean and tidy complete all as per specified and directed by Engineer -in-Charge. NOTE: All the installation shall be kept clean through out the contract period by repeatedly removing the grasses/trees/weads as many times as required depending on the growth of the grass
S&F in replacement lift car cross flow fan plastic body AC Single Phase, 230V of size 400 mm sweep with blade and frame and louvers complete all as per specified and directed. Make: CG/Bajaj/Havells/Khaithan
S&F in replacement exhaust fan for Lift control room made of sturdy Engineering plastic complete with louvers shutter, voltage 230V, 50Hz, RPM 1200, Copper windig of sweep 300 mm complete all as per specified and directed. Make: CG/Bajaj/Havells/Khaithan
MODI CORPORATION
EX SERVICE MEN SECURITY AND MAN POWER SERVICES
m/s mahendra kumar khare contractor
SAGAR MOTOR AND TRACTOR CO
M/S GURVEER SINGH
M/s arjeet singh ahluwalia
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .