Loading…
Loading…
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
29 Jun 2026, 2:00 pm
VIKAS ADHIKARI PANCHAYAT SAMITI BIKANER
VIKAS ADHIKARI PANCHAYAT SAMITI BIKANER
GRAMIN TURIST HETU GRAM RAISAR ME BUS STAND NIRMAN KARY
2026_PRD_568266_5
PSB_2026-27_632-35
Open Tender
Civil Works
90 days
RAISAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
VIKAS ADHIKARI PANCHAYAT SAMITI BIKANER, MDRISL
₹10,000
Yes
15 Jun 2026
15 Jun 2026
30 Jun 2026
15 Jun 2026
29 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation excavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus soil with in a lead of 50m.In hard soil | 7.79 | Cum | 178.46 | ₹1,390.2 |
| 2 | Cement concrete in foundation and plinth with stone ballast size 40mm including curing and compaction etc in 1:4:8 mix | 2.24 | cum | 3,518.04 | ₹7,880.41 |
| 3 | Brick work in foundation and plinth using bricks of class designation- in CM 1:6 | 3.58 | cum | 4,691.58 | ₹16,795.86 |
| 4 | Reinforced cement concrete work including curing compaction, finishing with rendering in cement sand mortar 1:3 and making good and joints excluding cost of centering, shuttering and reinforcement in 1:1.5:3 (1cement: 1.5course sand: 3-graded stone aggregate 20mm nominal size) In foundation | 2.14 | Cum | 5,354.51 | ₹11,458.65 |
| 5 | Reinforced cement concrete work including curing compaction, finishing with rendering in cement sand mortar 1:3 and making good and joints excluding cost of centering, shuttering and reinforcement in 1:1.5:3 (1cement: 1.5course sand: 3-graded stone aggregate 20mm nominal size) | 5.23 | Cum | 5,570.29 | ₹29,132.62 |
| 6 | Providing and fabricating reinforcement for RCC work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) in foundation and super structure up to 4.5m height above plinth level hot rolled deformed (IS: 1139) cold twisted (IS: 1786) bars | 921.25 | Kg | 97.94 | ₹90,227.22 |
| 7 | Centring and shuttering | 109.41 | Sqm | 319.04 | ₹34,906.17 |
| 8 | Installation and supply of iron mesh 14 mesh, 24 gauges in the iron window and tightening of the screw by installing it with 20 X 3 mm beading. Analysis 1.2 X 0.60 m for a window size 0.72 m2 | 109.41 | Sqm | 844.59 | ₹92,406.59 |
| 9 | 12mm thick plaster on new work including curing and racking of joints in CM 1:4 | 109.41 | Sqm | 158.73 | ₹17,366.65 |
| 10 | 20mm thick plaster on new work including curing and racking of joints in CM 1:6 | 10.79 | Sqm | 172.97 | ₹1,866.35 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
psbraisar05.pdf
Tender Documents • 10.97 MB
BOQ_1010925.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid