Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.0 LAccepted-AOC 000 ATARDHAR RAMNA KAJIMOHD MUZAFFARPUR BIHAR 842002 UDYAM BR 23 0052765 | MUZAFFARPUR | BIHAR | 842002 | ₹33.0 L | L1 | Accepted-AOC as per financial evaluation |
| 2 | L2₹41.7 LRejected-Finance 00 SANDILA SADAR BAZAR SANDILA HARDOI UTTAR PRADESH 241204 | HARDOI | UTTAR PRADESH | 241204 | ₹41.7 L | L2 | Rejected-Finance as per financial evaluation |
| 3 | Not Admitted-Fee/PreQual/Technical ASHOK NAGAR IN FRONT OF WATER TANK DISTT KASGANJ | KASGANJ | UTTAR PRADESH | 207123 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹42.0 L
EMD Value
₹4.1 L
Closing Date
24 Mar 2026, 12:00 pmClosed
Superintending Engineer
Office of the SE, AC, PWD, Aligarh
as per BoQ attached
2026_CEALG_1125853_6
1235/Cashier(PDK)-AC/2025-26 Dt 27-02-2026
Open Tender
Civil Works - Roads
Fixed-rate
180 days
Distt bKasganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹4.1 L
Office of the SE, AC, PWD, Aligarh
17 Jun 2026
16 Mar 2026
24 Mar 2026
16 Mar 2026
24 Mar 2026
16 Mar 2026
16 Mar 2026 - 24 Mar 2026
17 Mar 2026
Construction of Subgrade and earthen shoulders with approved Material Obtained from Borrow Pits with all lift and leads transporting to site, Spreasing to grading to required Slop and Compacted to meet requirement of Tables 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.1
Excavation in foundation in ordinary soil (Loam, clay or sand) upto 30 M and including lift upto 1.50 M and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M from the foundation trenches as per S.I. No. 251(a). Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
(Cement Treated Base) providing, laying and spreading in uniform layers with motor grader on a preparedSub base, Cement @ 4% by weight to the spread Material manually,mixing in place with Rotavator and compacting with Road roller at OMC to achieve the desired unconfined compressive strength and form a layer of base. Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Tack Coat (i) Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared surface cleaned with Hydraulic broom as per Technical Specification Clause 503. (Including Cost of Bitumen (V G-10 )
20mm thick Open-Graded Premix Carpet using Bituminous Binder (VG-10) Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. Case - III Type-C By Manual Means (I)Bitumen (VG-10) (Including Cost of Bitumen (V G-10)
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 A.By Manual Means Case - III : Type C (I) Bitumen (VG-10) (Including Cost of Bitumen (V G-10 )
Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 ii)Ordinary Kilometer Stone (Precast)
Hecto mter Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 iii)200 m stone (precast)
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (M 10)
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications Clause no.600,1202&1203
Supply, laying and fixing of 350 mm dia NP-4 class hume pipes in proper position in culvert.
Supply, laying and fixing of 600 mm dia NP-4 class hume pipes in proper position in culvert.
Plastering with cement mortar (1:4), 12 mm thick on brickwork in substructure as per technical specification clauses 613 & 1204
White washing with lime on undecorated wall surfaces (Three coats) to give an even shade including thoroughly brooming the surface to remove all dirt, dust mortar drops and loose scales of lime wash and other foreign matters.. as per DSR 13.37.1
Construction of Subgrade and earthen shoulders with approved Material Obtained from Borrow Pits with all lift and leads transporting to site, Spreasing to grading to required Slop and Compacted to meet requirement of Tables 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.1
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
CEMENT CONCRETE PAVEMENT(C.C ROAD) construction of un-reinforced plain cement concrete pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade) coarse and fine aggregates conforming to IS 383 maximun size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side from work (steel channel laying and fixing of 125 micron thick plastic sheet, wedges steel plates including levelling the form work as per drawing) spreading the concrete with shovels, rakes compacted using needle, screed and plate vibrators and finished in continuous opration including provision of contraction and expansion construction joints applying debonding strips primer, sealant admixtures as approved curing concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501.
05 Year Maintenance Charge Routine Maitenance of road for 05 Years after the competion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.) 1-1st Year
Maintenance for 2nd Year at Cost of Total Execute Work
Maintenance for 3rd Year at Cost of Total Execute Work
Maintenance for 4th Year at Cost of Total Execute Work
Maintenance for 5th Year at Cost of Total Execute Work
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.93 MB
BOQ_2099146.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].