| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.0 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹5.8 L+₹34,715 (6.41%)Rejected-AOC | L-2 | Rejected-AOC L-2 | |
| 3 | L-3₹6.0 L+₹63,204 (11.7%)Rejected-AOC | L-3 | Rejected-AOC L-3 |
Tender Value
₹4.9 L
EMD Value
₹10,000
Closing Date
26 Aug 2020, 4:00 pmClosed
Superintending Engineer (EMCC III)
Office of Superintending Engineer (EMCC III), PTPS, Panki, Kanpur
Rate Contract for rewinding of submersible pump motors and repairing, Repairing of 4UP3 Kirloskar make booster pumps (35 HP), DSM 4 RM pump (40 HP) and UP80/38 Kirloskar make booster pumps (25 HP), Panki Thermal Power Station, Panki
2020_RVUNL_496734_1
ET02/PTPS/EMCC3/EMCD8/2021
Open Tender
Electrical Works
Fixed-rate
365 days
PTPS, PANKI, KANPUR
Please refer tender documents
3 documents required · 3 mandatory
₹590
Dy. CAO, CFA and BO, PTPS, Panki, Kanpur
₹10,000
Yes
23 Oct 2020
27 Jul 2020
28 Aug 2020
27 Jul 2020
26 Aug 2020
27 Jul 2020
27 Jul 2020 - 26 Aug 2020
Amount
Primary inspection of submersible motor of the following rating : i) 25 HP
Primary inspection of submersible motor of the following rating : ii) 10 HP
Primary inspection of submersible motor of the following rating : iii) 7.5 HP
Primary inspection of submersible motor of the following rating : iv) 5 HP
Dismantling& Assembling of submersible motor of following rating :-i) 25 HP
Dismantling& Assembling of submersible motor of following rating :-ii) 10 HP
Dismantling& Assembling of submersible motor of following rating :-iii) 7.5 HP
Dismantling& Assembling of submersible motor of following rating :-iv) 5 HP
Rewinding of submersible motor of following rating :i) 25 HP
Rewinding of submersible motor of following rating :ii) 10 HP
Rewinding of submersible motor of following rating :iii) 7.5 HP
Rewinding of submersible motor of following rating :iv) 5 HP
Replacement of following damaged part with new one of submersible motor.(new parts will be arranged by the contractor at his own cost) Replacement of 02 No. Gun metal bush including Machining & grinding for fitting of Gun Metal Bush of following Motor rating i) 25 HP
Replacement of following damaged part with new one of submersible motor.(new parts will be arranged by the contractor at his own cost) Replacement of 02 No. Gun metal bush including Machining & grinding for fitting of Gun Metal Bush of following Motor rating ii) 10HP
Replacement of following damaged part with new one of submersible motor.(new parts will be arranged by the contractor at his own cost) Replacement of 02 No. Gun metal bush including Machining & grinding for fitting of Gun Metal Bush of following Motor rating iii) 7.5 HP
Replacement of following damaged part with new one of submersible motor.(new parts will be arranged by the contractor at his own cost) Replacement of 02 No. Gun metal bush including Machining & grinding for fitting of Gun Metal Bush of following Motor rating iv) 5 HP
Replacement of following damaged part with new one of submersible motor.(new parts will be arranged by the contractor at his own cost) Replacement of water seal pair of motor
Replacement of following damaged part with new one of submersible motor.(new parts will be arranged by the contractor at his own cost) Replacement of damaged Motor thrust plate of gun metal (complete Set i.e. thrust bearing + thrust pad + thrust fiber + segment piece) with new one. i) 25 HP
Replacement of following damaged part with new one of submersible motor.(new parts will be arranged by the contractor at his own cost) Replacement of damaged Motor thrust plate of gun metal (complete Set i.e. thrust bearing + thrust pad + thrust fiber + segment piece) with new one.ii) 10HP
Replacement of following damaged part with new one of submersible motor.(new parts will be arranged by the contractor at his own cost) Replacement of damaged Motor thrust plate of gun metal (complete Set i.e. thrust bearing + thrust pad + thrust fiber + segment piece) with new one. iii) 7.5 HP
Replacement of following damaged part with new one of submersible motor.(new parts will be arranged by the contractor at his own cost) Replacement of damaged Motor thrust plate of gun metal (complete Set i.e. thrust bearing + thrust pad + thrust fiber + segment piece) with new one. iv) 5 HP
Replacement of following damaged part with new one of submersible motor.(new parts will be arranged by the contractor at his own cost) Replacement of Motor nut (SS) with new one
Replacement of following damaged part with new one of submersible motor.(new parts will be arranged by the contractor at his own cost) Replacement of Motor bolt (SS) with new one.
REWINDING OF FOLLOWING RATING MOTORS OF Submersible pumps i)0.75 HP
REWINDING OF FOLLOWING RATING MOTORS OF Submersible pumps ii)1 HP
REWINDING OF FOLLOWING RATING MOTORS OF Submersible pumps iii)2 HP
Overhauling OF FOLLOWING RATING MOTORS OF Submersible pumps i)0.75 HP
Overhauling OF FOLLOWING RATING MOTORS OF Submersible pumps ii)1 HP
Overhauling OF FOLLOWING RATING MOTORS OF Submersible pumps iii)2 HP
Rotor Grinding work of submersible Motor of following rating - i) 25 HP
Rotor Grinding work of submersible Motor of following rating -ii) 10 HP
Rotor Grinding work of submersible Motor of following rating - iii) 7.5 HP
Rotor Grinding work of submersible Motor of following rating - iv) 5.0 HP
COMPLETE OVERHAULING OF THREE PHASE MOTOR i)0.75 hp
COMPLETE OVERHAULING OF THREE PHASE MOTORii) 01 hp
COMPLETE OVERHAULING OF THREE PHASE MOTORiii) 02 hp
Dismantling& Assembling of submersible Pump of following rating i) 25 HP
Dismantling& Assembling of submersible Pump of following rating-ii) 10 HP
Dismantling& Assembling of submersible Pump of following rating- iii) 7.5 HP
Dismantling& Assembling of submersible Pump of following rating- iv) 5.0 HP
Replacement of damaged part with new one of submersible (I) Neck ring of following rating :- i) 25 HP
Replacement of damaged part with new one of submersible (I) Neck ring of following rating :-ii) 10 HP
Replacement of damaged part with new one of submersible (I) Neck ring of following rating :-iii) 7.5 HP
Replacement of damaged part with new one of submersible (I) Neck ring of following rating :-iv) 5 HP
Replacement of damaged part with new one of submersible (II) Replacement of 02 No. Gun metal bush and 02 No. Rubber bush including Machining & grinding for fitting of Gun Metal Bush for 4 stage pump of following rating -i) 25 HP
Replacement of damaged part with new one of submersible (II) Replacement of 02 No. Gun metal bush and 02 No. Rubber bush including Machining & grinding for fitting of Gun Metal Bush for 4 stage pump of following rating -ii) 10 HP
Replacement of damaged part with new one of submersible (II) Replacement of 02 No. Gun metal bush and 02 No. Rubber bush including Machining & grinding for fitting of Gun Metal Bush for 4 stage pump of following rating -iii) 7.5 HP
Replacement of damaged part with new one of submersible (II) Replacement of 02 No. Gun metal bush and 02 No. Rubber bush including Machining & grinding for fitting of Gun Metal Bush for 4 stage pump of following rating -iv) 5 HP
Replacement of damaged part with new one of submersible (III) Replacement of 02 No. Gun metal bush and 03 No. Rubber bush including Machining & grinding for fitting of Gun Metal Bush for 5 stage pump of following rating - i) 25 HP
Replacement of damaged part with new one of submersible (III) Replacement of 02 No. Gun metal bush and 03 No. Rubber bush including Machining & grinding for fitting of Gun Metal Bush for 5 stage pump of following rating - ii) 10 HP
Replacement of damaged part with new one of submersible (III) Replacement of 02 No. Gun metal bush and 03 No. Rubber bush including Machining & grinding for fitting of Gun Metal Bush for 5 stage pump of following rating - iii) 7.5 HP
Replacement of damaged part with new one of submersible (III) Replacement of 02 No. Gun metal bush and 03 No. Rubber bush including Machining & grinding for fitting of Gun Metal Bush for 5 stage pump of following rating - iv) 5.0 HP
Replacement of damaged part with new one of submersible (IV)- Replacement of Pump sleeve of following rating:- i) 25 HP
Replacement of damaged part with new one of submersible (IV)- Replacement of Pump sleeve of following rating:- ii) 10 HP
Replacement of damaged part with new one of submersible (IV)- Replacement of Pump sleeve of following rating:- iii) 7.5 HP
Replacement of damaged part with new one of submersible (IV)- Replacement of Pump sleeve of following rating:- iv) 5.0 HP
Replacement of damaged part with new one of submersible V) Replacement of Pump impeller (bronze) of following rating:-i) 25 HP
Replacement of damaged part with new one of submersible V) Replacement of Pump impeller (bronze) of following rating:-ii) 10 HP
Replacement of damaged part with new one of submersible V) Replacement of Pump impeller (bronze) of following rating:-iii) 7.5 HP
Replacement of damaged part with new one of submersible V) Replacement of Pump impeller (bronze) of following rating:-iv) 5.0 HP
Replacement of damaged part with new one of submersible (VI) Replacement of Pump shaft of following rating:- i) 25 HP
Replacement of damaged part with new one of submersible (VI) Replacement of Pump shaft of following rating:- ii) 10 HP
Replacement of damaged part with new one of submersible (VI) Replacement of Pump shaft of following rating:- iii) 7.5 HP
Replacement of damaged part with new one of submersible (VI) Replacement of Pump shaft of following rating:- iv) 5.0 HP
Replacement of damaged part with new one of submersible(VII) Replacement of Rubber ‘O’ Ring
Replacement of damaged part with new one of submersible(VIII) Replacement of Pump Bowl nut and stud
Replacement of damaged part with new one of submersible(IX) Replacement of Drain Plug
Repairing of 4 UP 3 Kirloskar make Booster Pump/DSM4 RM Pump (40 HP) and UP80/38 Kirloskar make(25 HP) Complete overhauling of 35/40 HP 4 UP3 Kirloskar make pump/DSM4RM pump and UP80/38 Kirloskar make(25 HP)
Repairing of 4 UP 3 Kirloskar make Booster Pump/DSM4 RM Pump (40 HP) and UP80/38 Kirloskar make(25 HP) Complete overhauling of 05 HP SP3L Kirloskar make pump.
Repairing of 4 UP 3 Kirloskar make Booster Pump/DSM4 RM Pump (40 HP) and UP80/38 Kirloskar make(25 HP) Dismantling and shifting of 35/40 HP 4UP3 Kirloskar make pump/DSM 4RM Pump and UP80/38 Kirloskar make(25 HP) from foundation to nearby suitable place.
Repairing of 4 UP 3 Kirloskar make Booster Pump/DSM4 RM Pump (40 HP) and UP80/38 Kirloskar make(25 HP) Shifting and installation of repaired assembled pump 35/40 HP 4UP3 Kirloskar make pump/DSM 4RM Pump and UP80/38 Kirloskar make(25 HP) along with its alignment with motor from nearby suitable place to its foundation.
Replacement of damaged part with new one 35/40 HP 4 UP 3 Kirloskar make booster pump/DSM4 RM Pump and UP80/38 Kirloskar make(25 HP) :a) Replacement of shaft of pump (shaft will be provided by the department free of cost)
Replacement of damaged part with new one 35/40 HP 4 UP 3 Kirloskar make booster pump/DSM4 RM Pump and UP80/38 Kirloskar make(25 HP) :b) Replacement of impeller of pump (impeller will be provided by the department free of cost)
Replacement of damaged part with new one 35/40 HP 4 UP 3 Kirloskar make booster pump/DSM4 RM Pump and UP80/38 Kirloskar make(25 HP) :c) Replacement of damaged bearing of DE side (bearing wilbe provided by the department free of cost)
Replacement of damaged part with new one 35/40 HP 4 UP 3 Kirloskar make booster pump/DSM4 RM Pump and UP80/38 Kirloskar make(25 HP) :d) Replacement of damaged bearing of DE side of 4UP3 kirloskar make (bearing will be arranged by the contractor at his own cost)
Replacement of damaged part with new one 35/40 HP 4 UP 3 Kirloskar make booster pump/DSM4 RM Pump and UP80/38 Kirloskar make(25 HP) :e) Replacement of damaged bearing of NDE side (bearing wilbe provided by the department free of cost)
Replacement of damaged part with new one 35/40 HP 4 UP 3 Kirloskar make booster pump/DSM4 RM Pump and UP80/38 Kirloskar make(25 HP) :f). Replacement of damaged bearing of NDE side 4UP3 kirloskar make (bearing will be arranged by the contractor at his own cost)
Replacement of damaged part with new one 35/40 HP 4 UP 3 Kirloskar make booster pump/DSM4 RM Pump and UP80/38 Kirloskar make(25 HP) :g) Replacement of shaft sleeve of pump (shaft sleeve will be provided by the department free of cost)
Replacement of damaged part with new one 35/40 HP 4 UP 3 Kirloskar make booster pump/DSM4 RM Pump and UP80/38 Kirloskar make(25 HP) :h) Replacement of shaft sleeve of pump (shaft sleeve will be arranged by the contractor at his own cost)
Replacement of damaged part with new one 35/40 HP 4 UP 3 Kirloskar make booster pump/DSM4 RM Pump and UP80/38 Kirloskar make(25 HP) :i) Repairing bearing house of DE side
Replacement of damaged part with new one 35/40 HP 4 UP 3 Kirloskar make booster pump/DSM4 RM Pump and UP80/38 Kirloskar make(25 HP) :j) Repairing bearing house of NDE side
Replacement of damaged part with new one 35/40 HP 4 UP 3 Kirloskar make booster pump/DSM4 RM Pump and UP80/38 Kirloskar make(25 HP) :k) Replacement of stuffing box bush (bush will be provided by the contractor at his own cost)
Replacement of damaged part with new one 35/40 HP 4 UP 3 Kirloskar make booster pump/DSM4 RM Pump and UP80/38 Kirloskar make(25 HP) :l) Replacement of rubber star for coupling
Replacement of damaged part with new one 35/40 HP 4 UP 3 Kirloskar make booster pump/DSM4 RM Pump and UP80/38 Kirloskar make(25 HP) :m) Replacement of rubber star for coupling (Rubber star will be arranged by the contractor at his of cost)
Replacement of damaged part with new one 35/40 HP 4 UP 3 Kirloskar make booster pump/DSM4 RM Pump and UP80/38 Kirloskar make(25 HP) : n)Replacement of gland
i) Major Repairing of foundation of 4UP3 Kirloskar make pump & motor /DSM 4RM Pump & motor (40 HP) and UP80/38 Kirloskar make pump & Motor (25 HP)
ii) Minor Repairing of foundation of 4UP3 Kirloskar make pump & motor /DSM4 RM Pump & motor (40 HP) and UP80/38 Kirloskar make pump & Motor (25 HP)
complete overhauling of folllowing pumps (a).75 hp
complete overhauling of folllowing pumps (a)01 hp
complete overhauling of folllowing pumps (a)02 hp
Work of maintenance of tube wells/booster Pumps and replacement of valves of tube wells/booster pumps :-Work of attending leakage of gland of valve of tubewell/booster pump of different size.
Work of maintenance of tube wells/booster Pumps and replacement of valves of tube wells/booster pumps :-Fabrication of brass spindle with nut of different size and replacement of the same with old one. i) 50 mm valve
Work of maintenance of tube wells/booster Pumps and replacement of valves of tube wells/booster pumps :-Fabrication of brass spindle with nut of different size and replacement of the same with old one. ii) 80 mm valve
Work of maintenance of tube wells/booster Pumps and replacement of valves of tube wells/booster pumps :-Fabrication of brass spindle with nut of different size and replacement of the same with old one. iii)100 mm valve
Work of maintenance of tube wells/booster Pumps and replacement of valves of tube wells/booster pumps :-Fabrication of brass spindle with nut of different size and replacement of the same with old one. iv)150 mm valve
Work of maintenance of tube wells/booster Pumps and replacement of valves of tube wells/booster pumps :Replacement of damaged GI nipple of 450 mm length with new one to be threaded at one end and flange to be welded at other end of following size i) 50 mm (GI nipple will be arranged by the contractor at his own cost)
Work of maintenance of tube wells/booster Pumps and replacement of valves of tube wells/booster pumps :Replacement of damaged GI nipple of 450 mm length with new one to be threaded at one end and flange to be welded at other end of following size ii) 80 mm (GI nipple will be arranged by the contractor at his own cost)
Work of maintenance of tube wells/booster Pumps and replacement of valves of tube wells/booster pumps : Replacement of damaged GI nipple of 450 mm length with new one to be threaded at one end and flange to be welded at other end of following size iii) 100 mm(GI nipple will be arranged by the contractor at his own cost)
Work of maintenance of tube wells/booster Pumps and replacement of valves of tube wells/booster pumps :Replacement of football with new one of following size :i) 50 mm (foot ball will be arranged by the contractor at his own cost)
Work of maintenance of tube wells/booster Pumps and replacement of valves of tube wells/booster pumps :Replacement of football with new one of following size : ii) 80 mm (foot ball will be arranged by the contractor at his own cost)
Replacement of non return valve with new one of following size : i) 50 mm (NRV will be provided by the department free of cost)
Replacement of non return valve with new one of following size ii) 65 mm (NRV will be provided by the department free of cost)
Replacement of non return valve with new one of following size : iii) 80 mm (NRV will be provided by the department free of cost)
Replacement of non return valve with new one of following size : iv) 100 mm (NRV will be provided by the department free of cost)
Replacement of non return valve with new one of following size : v) 150 mm(NRV will be provided by the department free of cost)
Replacement of non return valve with new one of following size : i) 50 mm (NRV will be arranged by the contractor at his own of cost)
Replacement of non return valve with new one of following size ii) 65 mm (NRV will be arranged by the contractor at his own of cost)
Replacement of non return valve with new one of following size : iii) 80 mm (NRV will be arranged by the contractor at his own of cost)
Replacement of non return valve with new one of following size : iv) 100 mm (NRV will be arranged by the contractor at his own of cost)
Replacement of non return valve with new one of following size : v) 150 mm(NRV will be arranged by the contractor at his own of cost)
Replacement of Gate Valve with new one of following size (gate valve will be provided by the department free of cost) i) From 10 mm to 20 mm
Replacement of Gate Valve with new one of following size (gate valve will be provided by the department free of cost) ii) 25 mm
Replacement of Gate Valve with new one of following size (gate valve will be provided by the department free of cost)iii) 50 mm
Replacement of Gate Valve with new one of following size (gate valve will be provided by the department free of cost)iv) 65 mm
Replacement of Gate Valve with new one of following size (gate valve will be provided by the department free of cost)v) 80 mm
Replacement of Gate Valve with new one of following size (gate valve will be provided by the department free of cost)vi) 100 mm
Replacement of Gate Valve with new one of following size (gate valve will be provided by the department free of cost)vii) 150 mm
Replacement of Gate Valve with new one of following size (gate valve will be arranged by the contractor at his own cost)i) From 10 mm to 20 mm
Replacement of Gate Valve with new one of following size (gate valve will be arranged by the contractor at his own cost)ii) 25 mm
Replacement of Gate Valve with new one of following size (gate valve will be arranged by the contractor at his own cost)iii) 50 mm
Replacement of Gate Valve with new one of following size (gate valve will be arranged by the contractor at his own cost)iv) 65 mm
Replacement of Gate Valve with new one of following size (gate valve will be arranged by the contractor at his own cost)v) 80 mm
Replacement of Gate Valve with new one of following size (gate valve will be arranged by the contractor at his own cost)vi) 100 mm
Replacement of Gate Valve with new one of following size (gate valve will be arranged by the contractor at his own cost)vii) 150 mm
Repairing of non return valve of following size :i) 50 mm
Repairing of non return valve of following size :ii) 65 mm
Repairing of non return valve of following size :iii) 80 mm
Repairing of non return valve of following size :iv) 100 mm
Repairing of non return valve of following size :v) 150 mm
Repairing of Gate Valve (ISI mark) of following size: i) From 10 mm to 20 mm
Repairing of Gate Valve (ISI mark) of following size: ii) 25 mm
Repairing of Gate Valve (ISI mark) of following size: iii) 50 mm
Repairing of Gate Valve (ISI mark) of following size: iv) 65 mm
Repairing of Gate Valve (ISI mark) of following size: v) 80 mm
Repairing of Gate Valve (ISI mark) of following size: vi) 100 mm
Repairing of Gate Valve (ISI mark) of following size:vii) 150 mm
Work cleaning of valve’s pit
Replacement of spindle gutka of supply valve/drain valve with new one. ( Spindle gutka will be arranged by the contractor at his own cost)
Replacement of spindle clamp of gate valve with new one of following size :i) 100 mm
Replacement of spindle clamp of gate valve with new one of following size :ii) 150 mm
Work of machining of shaft of 4UP3 booster pump of Kirloskar make.
Complete dismantling & assembling of following WED MODY make sum pumps of following rating :-i) 02 HP
Complete dismantling & assembling of following WED MODY make sum pumps of following rating :-(ii) 05 HP
Complete dismantling & assembling of following WED MODY make sum pumps of following rating :-(iii) 10 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost) a) ‘O’ Ring i) 02 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost) a) ‘O’ Ring ii) 05 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost) a) ‘O’ Ring iii) 10 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)b) Teflon washer i) 02 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)b) Teflon washer ii) 05 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)b) Teflon washer iii) 10 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)c) Contactor i) 02 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)c) Contactor (ii) 05 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)c) Contactor (iii) 10 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)d) Impeller (SS) i) 02 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)d) Impeller (SS)(ii) 05 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)d) Impeller (SS)(iii) 10 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)e) Mechanical Seal (upper) i) 02 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)e) Mechanical Seal (upper)(ii) 05 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)e) Mechanical Seal (upper)(iii) 10 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)f) Mechanical seal (lower) i) 02 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)f) Mechanical seal (lower)(ii) 05 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)f) Mechanical seal (lower)(iii) 10 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)g) wear Plate i) 02 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)g) wear Plate(ii) 05 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)g) wear Plate(iii) 10 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)h) stainer i) 02 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)h) stainer(ii) 05 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)h) stainer(iii) 10 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)i) Diffuser i) 02 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)i) Diffuser(ii) 05 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)i) Diffuser(iii) 10 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)j) Ball Bearing (Upper) i) 02 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)j) Ball Bearing (Upper)(ii) 05 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)j) Ball Bearing (Upper)(iii) 10 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)k) Ball Bearing (lower) i) 02 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)k) Ball Bearing (lower)(ii) 05 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)k) Ball Bearing (lower)(iii) 10 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)l) Cable Gromment i) 02 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)l) Cable Gromment(ii) 05 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)l) Cable Gromment(iii) 10 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)m) Hexagonal nut 8 mm i) 02 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)m) Hexagonal nut 8 mm(ii) 05 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)m) Hexagonal nut 8 mm(iii) 10 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)n) Hexagonal nut 10 mm i) 02 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)n) Hexagonal nut 10 mm(ii) 05 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)n) Hexagonal nut 10 mm(iii) 10 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost) O) STUDS i) 02 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost) O) STUDS(ii) 05 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost) O) STUDS(iii) 10 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)P.Socket head and screw 6 mm i) 02 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)P.Socket head and screw 6 mm(ii) 05 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)P.Socket head and screw 6 mm(iii) 10 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)q. rewinding kit(set) i) 02 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)q. rewinding kit(set)(ii) 05 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)q. rewinding kit(set)(iii) 10 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)R. destance sleeve. i) 02 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)R. destance sleeve.(ii) 05 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)R. destance sleeve.(iii) 10 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)S. FLEXIBLE THREE CORE CABLE(3 MTR) SUITABLE FOR PUMP RATING i) 02 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)S. FLEXIBLE THREE CORE CABLE(3 MTR) SUITABLE FOR PUMP RATING(ii) 05 HP
Replacement of following damaged parts with new one (new parts will be arranged by the contractor at his own cost)S. FLEXIBLE THREE CORE CABLE(3 MTR) SUITABLE FOR PUMP RATING(iii) 10 HP
Sajjan Government Contractor
M/s Ambey Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .