| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 CrAdmitted-Finance | -12.37% | ₹2.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.6 Cr+₹7.0 L (2.72%)Admitted-Finance | -9.99% | ₹2.6 Cr+₹7.0 L (2.72%) | L2 | Admitted-Finance |
| 3 | L3₹2.9 Cr+₹31.8 L (12.4%)Admitted-Finance | -1.50% | ₹2.9 Cr+₹31.8 L (12.4%) | L3 | Admitted-Finance |
Tender Value
₹2.9 Cr
EMD Value
₹8.8 L
Closing Date
7 May 2026, 12:00 pmClosed
ce lda
Ce, Lucknow Development Authority
Basant Kunj Yojana antargat Jagars Park mein jalmagn pathway ke uchikaran avam entrance plaza ki marmmat wa painting ka karya
2026_LDAUP_1135764_1
10/E-Nivida/ce/26-27
Open Tender
Civil Works
Fixed-rate
240 days
CE LDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,366
SECRETARY LDA
₹8.8 L
Yes
18 Jul 2026
13 Apr 2026
8 May 2026
13 Apr 2026
7 May 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m., All kinds of soil. | 512.91 | Cum | 205.62 | ₹1,05,464.55 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge., All kinds of soil | 3.6 | Cum | 140.22 | ₹504.79 |
| 3 | Excavating ,supply and filling of local earth( including royalty) by mechanical transport up to lead of 20km, also including ramming and watering of the earth. | 626.76 | CUM | 348.08 | ₹2,18,162.62 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | - | Cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 459.51 | Cum | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for :, Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.. | - | Sqm | 665.54 | - |
| 7 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement, All works above plinth level upto floor V level, Concrete of M25 grade with minimum cement content of 330 kg /cum | 4.5 | Cum | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for :, Foundations, footings, bases of columns, etc. for mass concrete | 1.8 | Sqm | 309.78 | ₹557.6 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for :, Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers | 10 | Sqm | 581.72 | ₹5,817.2 |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:, Cement mortar 1:4 (1 cement : 4 coarse sand) | 127.71 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.91 MB
td.pdf
Tender Documents • 2.92 MB
BOQ_2120544.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .