Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96,535Qualified PLOT NO 7 ULLAS NAGAR ST NO 01 KOHKA DURG CHHATTISGARH 490023 | DURG | CHHATTISGARH | 490023 | L1 | Qualified MSE, Category: General | |
| 2 | L2₹99,425+₹2,890 (2.99%)Qualified 26 16 24 KAVERI AVENUE B V NAGAR KONDAYAPALEM NELLORE ANDHRA PRADESH 524004 | SPSR NELLORE | ANDHRA PRADESH | 524004 | L2 | Qualified MSE, Category: General | |
| 3 | L3₹1.0 L+₹4,065 (4.21%)Qualified | L3 | Qualified MSE, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
3 Feb 2025, 1:00 pmClosed
Pendant Light 12 inch
10 Sqmm 2 core Aluminium wire
1.5 Sqmm 2 core copper wire
5 Amp Combination Switch Socket
15 Amp Combination Switch Socket
32 Amp MCB
10 mm PVC Clamp
Tape Roll
Flexible Wire Red and Black
Spike Light 5 Watt
Informative Sign Board
Wall Light Frame Type
9 Watt Bulb Screw Type
7367286
GEM/2025/B/5811607
Two Packet Bid
Spike Light 5 Watt
15 days
Jalandhar, Punjab
Total value wise evaluation
BOQ
7 documents required · 7 mandatory
3 yrs
₹3
80%
Exempted
11 Jan 2025
11 Jan 2025
3 Feb 2025
Pendant Light 12 inch
10 Sqmm 2 core Aluminium wire
1.5 Sqmm 2 core copper wire
5 Amp Combination Switch Socket
15 Amp Combination Switch Socket
10 mm PVC Clamp
Flexible Wire Red and Black
Spike Light 5 Watt
Informative Sign Board
Wall Light Frame Type
9 Watt Bulb Screw Type
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_7367286.pdf
GEM_BID
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
specification_2025-01-11-22-48-38_4861650496b58b743936d2687405db8f.pdf
BOQ
boq_2025-01-11-22-48-38_065443f7787e8a316b8a4780b8fe9293.csv.pdf
BOQ
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .