Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹64.9 LAccepted-AOC 67 A HAFIZALI BAHADUR KHAN MARG SURAJI COMPOUND BEHIND KHATAU MILL BYCULLA W MUMBAI 400011 BRITE INDUSTRIES 67 A HAFIZALI BAHADUR KHAN MARG SURYAJI COMPOUND BEHIND KHATAU MILL MUMBAI | MUMBAI | MAHARASHTRA | 400011 | 1 | Accepted-AOC Being lowest | |
| 2 | 2₹65.7 L+₹73,565.80 (1.13%)Rejected-Finance FLAT NO 201 GF KAMAL VIHAR CGHS LTD PLOT NO 5 SECTOR 7 DWARKA NEW DELHI 110075 | NEW DELHI | NEW DELHI | DELHI | 110075 | 2 | Rejected-Finance Not being lowest | |
| 3 | 3₹68.9 L+₹4.0 L (6.16%)Rejected-Finance 91 DEFENCE ESTATE PHASE II NEAR AMBEDKAR PARK DEORI ROAD AGRA UP | AGRA | UTTAR PRADESH | 282001 | 3 | Rejected-Finance Not being lowest | |
| 4 | 4₹82.7 L+₹17.8 L (27.5%)Rejected-Finance | 4 | Rejected-Finance Not being lowest | |
| 5 | Rejected-Technical MOH SWAMI PADAM JAHANGIRPUR GREATER NOIDA GAUTAM BUDH NAGAR UP 203141 | GREATER NOIDA | GAUTAM BUDH NAGAR | UTTAR PRADESH | 203141 | - | Rejected-Technical Being two class below for eligible class |
Tender Value
₹76.9 L
EMD Value
₹1.4 L
Closing Date
1 Dec 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
HQ CWE AGRA
112, TAJ ROAD AGRA CANTT
SPL REPAIR / REPLACEMENT OF BER CENTRAL TPYE AC PLANTS OF CAPACITY 03 X 9.6 TR OF ICU WARD AT MH AGRA UNDER GE (WEST) AGRA
2023_MES_625306_1
84274/E8
Open Tender
Miscellaneous Works
Item Rate
180 days
AGRA
MES contractors enlisted in Class C category c(i) for unenlisted contractors meeting the enlistment criteria corresponding to value class and category of work
8 documents required · 8 mandatory
₹1,000
GE WEST ARA
₹1.4 L
3 Jan 2024
27 Oct 2023
8 Dec 2023
27 Oct 2023
1 Dec 2023
17 Nov 2023
27 Oct 2023 - 3 Nov 2023
Amount
SCHEDULE 'A' PART-I Disconnecting, dismentling and taking out, loading, transporting, unloding and steaking properly at AGE E/M (W) Store yard of central type AC Plant of Cap 1x9.5 TR (03 unit) including compressors with motors, cooling tower, piping system, AHU, dehumidifier, electic panel & Condensor with Pump complete with all accessories as installed at site for bldgs ICU Room at MH Agra with dismentling of existing duct of any specification & including making good disturbed surface of wall, door, ceiling & floor etc to match with the existing surfaces with necessary colour/ painting complete all as specified and directed.
(A) AIR CONDITIONING :- Design, suppy, installaion, testing and commisisioning of Air conditioning system to maintain design condition 23 to 25 ºC. DB and 40 to 60 % RH consiting to 03 Nos 13 TR next higher side on each scroll water cooled water machines (2W +1S), 03 Nos condenser water pump set (2 W +1S), 03 Nos chilled water pump sett (2 W + 1S), Strip heater of 70 KW, air handling units, chilled and condensing water piping, air distribution system, Electric Control panels, cabling wiring, contorl wiring and earthing including building managment system for automatic operation of AC plant to maintain temperature and humidity as per the user data sheet enclosed as per Annexure 'A'. (B) Pump :- (a) Condenser water cooling arrangement comprising of the following :- (i) Two Nos EEC series (Engergy efficient) monoblock centrifugal condenser cooling water pumping sets of of capacity 300 LPM at 25 Mtr head but not less than 5 HP capacity to achieve desired discharge and head alongwith necessary valves in suction and delivery line (01 Nos working and 01 Nos Standby) and suitable for operation on 3 phase 50 Hz, 415 volts AC supply along with hydraulic vane type water meter for flow measurement and providing a pressure gauge in each pump set of suitable capacity including suitable foundation with neoprence rubber anti vibration rubbed pads all as specified. - 02 Nos (1W+1S)
(b) Chilled water circulation arrangement comprising of the following :- (i) Two Nos monoblock centrifugal pump sets of capacity 220 LMP at 20 Mtrs head but not less than 2 HP for circulating chilled water along with necessary valves in suction and delivery line (01 Nos working and 01 Nos Standby) and suitable for operation on 3 phase 50 Hz, 415 volts, AC supply, along with one number pressure gauge in each pump set of suitable capacity including suitable foundation with neoprene rubber anti - vibration rubbed pads all as specified and as per manufacturer's instruction. 02 Nos (1W+1S) (ii) Chilled water make up ISI marked, closed lid, cylindrical shaped tank of approved make having capacity 500 ltrs and thermally insulated with 50 mm thick EPS TF quality sheet of suitable sizes having density not less than 50 Kg / Cum with protecting covering of 27 gauge aluminium cladding and supporting piping connections, valves, fittings etc including required necessary water inlet & outlet connections with suitable size medium grade GI pipe but not less than 20 mm bore complete all as directed and specified.
(C) Air Handling Unit :- (a) Supply, assemblying, Installation, commissioning & testing of floor mounted double skin air handling unit of dehumidified capacity of nearest size after axact calculation of tonnage of the plant, 0.63 mm inner & outer skin, 43mm thermal break profile, centrifugal blower dynamically balanced, squirrel case induction motor of suiable capacity but not less than 7.5 HP, 3 phase, 415 volts, 50 Hz AC supply, double skinned six or eight row deep DX copper tube cooling coil, static pressure -60 - 70 mm of water gauge, 12 FPI, 50 mm thick pre-filter (Washable Synthetic fiber of efficiency 90% down to 10 micron) & Fine Filters, SS drain pan including 40 mm UPVC drain outlet pipe with UPVC fittings from AHU to outside of AHU room, V belt drive with provn of heater bank of suitable wattage to compensate mansoon sensible reheat, dehumidifire pump with PVC water tank pipe line connected with spary nozzles arrengment to maintain humiditity in summar season complete all as specified and directed. - 01 Job
(D) One Lot of air distribution system for extended air conditioning space comprising of supply air ducts from AHU to all conditioned space as shown in sketch and return air duct of suitable sizes from conditioned space to AHU's etc including providing insulation to avoid condensation and to maintain effective designed condition in air conditioned space of all building duly insulated with bonded fiber glass wool insultion (of min density 24 Kg / m3), min 40 mm thick for indoor ducts and min 50 mm thick for exposed ducts including interconnectors as required from AHU to be conditioned space comprising of class VIII galvanized sheet with suitable supporting arrangements and bracing, supply / return / fresh air grilles on sheet metal frame work duly painted / finished to match with the existing ceiling. Fire dampers operated with fusiable link shall be provided. All ducts shall be safely and correctly held in position and aligned by providing all necessary supporting steel / GI frame work, fasteners, e medium grade GI pipe but not less than 20 mm bore complete all as specified and directed. 50 Hz, 415 volts AC supply along with hydraulic vane type water meter for flow measurement and providing a pressure gauge in each pump. The job includes removal and refixing of ceiling.
(E) Supply, erection of FRP cooling tower, heat rejection capacity 35 TR (105000 Kcal/Hr). cooling tower shall be complete with basin, casing, distribution system, PVC filling, louvers, HDG supports, GI ladder and TEFC squirrel cage induction motor suitable for outdoor installation with necessary protection jali. The cooling tower design should be based on following parameter and as per specification. Cooling tower inlet water temperature 36.40 Deg. C. Cooling tower outlet water temperature 32.20 Deg.C. including necessary PCC/ brick work, foundation work complete all as specified and directed. 01 Job
(F) M&L for PVC Rotational moulded water storage tanks of capacity 1000 Liters including inlet & outlet connection and float valve & gun metal gate valve of suiatble but not less than 25 mm bore medium grdae GI pipe line with necessary control valve (cylindrical vertical with closed top) hoisted on RCC slave and brick work staging upto suiatble height for cooling tower complete all as specified and directed. 01 Job (G) Supply & fixing, commissioning & testing Expansion Valve of suitable capacity but not less than 13 TR @ 01 No. for each chiller unit. - 03 Each (H) Supply & fixing, commissioning & testing of Drier Filter of suitable capacity but not less than 13 TR @ 01 No. for each chiller unit.- 03 Each
(J) Water Piping :- M&L for condenser water pipe line MS pipes 'C' class cut to required lengths and installed with all welded joints and fitting like valves, flanges, union including painting with two coats of synthetic enemalled paint of desired color shed over one coat of red oxide primer including water flow direction marking from cooling tower to condenser unit, through condenser pump and returned circuit including necessary supports/ brassings on structural steel frame work for laying in proper alignment and height complete all as specified & directed of following size :- (a) 100 mm (b) 80 mm (c) 65 mm (d) 50 mm Note :- Qty shall be as required to achieve required condition of AC plant specified in user data.
M&L for Chilled water piping line MS class 'C', heavy grade, ISI marked pipe of suitable size with all fittings such as bends, elbow, tees, reducers, tees supports, flow indicators etc of suitable size as per site requirement of maintain the continuous flow of chilled water from chiller unit to AHUs so that designed conditions can be met with. The chilled water pipe line network shall be laid under ground, above ground, floor, roof, a long wall etc chilled water pipe line shall be insulated with EPS TF quality insulation section of 50 mm thickness with and including applying bituminous compound and cladding with 27 gauge aluminium sheet to avoid the heat loss including water pipe line. Bidder shall ensure the quality of line insulation and adqquate insulation be provided so that chilled water temperature of 8-9 degree celcius can be maintained at AHUs inlet point. (a) 80 mm (b) 65 mm (c) 50 mm Note :- Qty shall be as required to achieve required condition of AC plant specified in user data.
(K) Supply & fixing butterfly valves complete with double flanges, 3 mm thick rubber gaskets, nuts, bolts & washers etc complete all as specified & directed of following size:- (a) 100 mm (b) 80 mm (c) 65 mm (d) 50 mm Note :- Qty shall be as required to achieve required condition of AC plant specified in user data. (L) Supply & fixing of descaling valve of size 25 mm bore complete with double pair of flanges, gaskets, nut & bolts etc complete all as specified & directed. - 06 Each (M) Supply & fixing balancing valve of Size 50 mm specified make with flanges, nut & bolts etc complete all as specified & directed. 03 Each
(N) Supply & fixing, commissioning & testing dual plate check valve of size 100 mm complete with flanges, nut bolts etc complete all as specified & directed. - 02 Each (O) Supply & fixing, commissioning & testing dual plate check valve of size 80 mm complete with flanges, nut bolts etc complete all as specified & directed. - 02 Each
(P) Supply & fixing, commissioning & testing of Auto air Purging Valve to be fixed each condenser unit complete all as specified & directed. 06 Each (Q) Supply & fixing, commissioning & testing of Y Strainers of size 65 mm complete all as specified & directed. 03 Each (R) Supply & fixing, commissioning & testing of Y Strainers of size 80 mm complete all as specified & directed. 02 Each (S) Supply & fixing, commissioning & testing of Y Strainers of size 100 mm complete all as specified & directed. 03 Each
(R) Supply & fixing, commissioning & testing pot Strainer of size 100 mm for Condenser Water Line complete all as specified & directed. 01 Each +B27 (T) Supply & fixing dial type pressure gauges of 100 mm dia dial complete with SS syphon & cock for inlet & outlet condenser & Chiller water pipe line complete all as specified & directed. 20 Each (U) Supply & fixing of industrial stem type thermometer for inlet & outlet condenser & Chiller water pipe line complete all as specified & directed. 20 Each
(V) Supply & fixing of water flow control switch for each unit complete all as specified & directed. 03 Each (W) Supply & Installation of 40 mm UPVC Drain pipe with all PVC fittings for condenser pump drain water complete all as specified & directed. - 40 RM (X) Supply, fabrication, installation & testing of double canvas flexible connection of suitable size to be fixed between AHU and existing ducting with provn of inspection zip opening complete all as specified & directed. (Y) Supply, Installation, commissioning & testing of supply air grills/diffuser with dampers for extended air duct of suitable size complete all as specified & directed. - 18 Each
(Z) Supply, Installation, commissioning & testing of return air grills/diffuser without dampers of suitable size complete all as specified & directed. - 18 Each Note :- The qty required for achieving the desired temperature and humidity deemed to be included in the quoted rates. (AA) ELECTRICAL WORKS :- Main Electrical panel :- Supplying, fixing, commissioning and testing, self supported, cubical, floor mounted, indoor LT panel, CPRI approved dust and vermin proof factory fabricated, made out of not less than 2 mm thick CRCA sheet, powder coated, suitable for operation on 3 phase, 50 Hz, 415 volts, including internal control wiring with 1100 volts grade single core, PVC insulated, FRLS, multistranded copper conductor cables of suitable current carrying capacity complete and comprising of the following accessories. - 01 Each Job
(AB) Power Cables from Panel to Equipment's :- (a) M&L for PVC insulated, armoured, heavy duty electric power cable with copper conductor, 1100 volts grade, cross-sectional area 6 Sqmm X 3 core from Panel to AHU of suitable current carrying capacity complete all as specified & directed. - 20 RM (b) M&L for PVC insulated, armoured, heavy duty electric power cable with copper conductor, 1100 volts grade, cross-sectional area 4 Sqmm X 3 core from Panel to condenser pumps, chiller pump, dehumidifire pump & CT Fan Motor complete all as specified & directed. - 90 RM (c) M&L for PVC insulated, armoured, heavy duty electric power cable with copper conductor, 1100 volts grade, cross-sectional area 16 Sqmm X 4 core from main Panel to Scroll Condensing unit microprocessor based panel & heating bank complete all as specified & directed. - 90 RM
(d) M&L for control wiring to the entire air conditioning system with suitable size copper conductor cable PVC (FRLS) insulated for interlocking arrengment of chiller unit, cooling tower, AHU units, condenser pump, water flow switch, tempreture etc complete all as specified & directed. 01 Job
(AC) Supplying & Fixing of GI cable tray of size 300 mm fabricated from - 14 HWG GI Sheet (Without Cover) suiatble for laying/ fixing of electric power cables including necessary structural steel frame support/ brassing to the existing plant room from main electric panel to all machine/ equipments complete all as specified & directed. The qty required as per site requirement.
M&L for earthing complete, with GI earth plate electrode of size 600 mm x 600 mm x 6 mm thick burried directly in ground (earth pit not less than 2.25 m deep below ground level) with top edge of the plate not less than 1.5 m below the normal ground level connected with GI strip of size 25 x 4 mm by means of bolts, nuts, check nuts and washers of galvanized iron and using charcoal and salt upto 150 mm above plate edge level including PCC pit in PCC 1:2:4 type B-1 (using 20 mm graded crushed stone aggregate), RCC frame with 40 mm thick RCC cover of RCC 1:2:4 type B-1 (using 20 mm graded stone aggregate) reinforced with 8 mm dia deformed bars C/C in both way & 10 mm dia bar lifting handle, including excavation and earth work in any type of soil, 20 mm bore medium grade GI watering pipe with funnel and wire mesh and 40 mm bore light grade GI protection pipe earth lead connected to and including test point complete all as shown in electrical plate No.3 of SSR part-I of 2009 connected to equipment and testing on completion including complete all as specified and directed.
M&L for earthing complete with galvanized steel earth plate electrodes 600 mm x 600 mm x 6 mm thick buried directly in ground earth plate not less than 2.25 mtr deep below normal ground level with top edge of the plate not less than 1.5 mtr below normal ground level connected to and including galvanized steel wire 4.0 mm dia by means of bolts, nuts, check nuts and washers of galvanized iron and using charcoal and salt upto 150 mm above plate plate edge level including PCC pit in PCC 1:2:4 type B-1 (using 20 mm graded crushed stone aggregate), RCC frame with 40 mm thick RCC cover of RCC 1:2:4 type B-1 (using 20 mm graded stone aggregate) reinforced with 8 mm dia deformed bars C/C in both way & 10 mm dia bar lifting handle, including excavation and earth work in any type of soil, 20 mm bore medium grade GI watering pipe with funnel and wire mesh and 15 mm bore light grade GI protection pipe earth lead connected to and including test point complete all as shown in electrical plate No.3 of SSR part-I of 2009 connected to equipment and testing on completion including complete all as specified and directed.
Supply, installation, commissioning and testing of servo control oil cooled voltage stabilizer for automatic operation, 3 phase, naturally oil cooled, indoor type and designed for input variation between 300 volts to 480 with output voltage stabilize at 415 with accuracy + 2.5% and speed of correction 8 volts per second and capacity 75 KVA complete all as specified and directed.
SCHEDULE 'A' PART-II Manning & operation and including routine comprehensive maintenance of central AC conditioning plant water cooled type of capacity 39 TR (02 x 13 TR working & 01 x 13 TR stand by) installed at ICU MH AC plant room (Plant shall be run for three shift of 08 hours each ie round the clock) complete for its proper smooth functioning and including operating & maintenance of complete AC plant like compressor unit, condensor unit with pump set and motor, AHU cooling tower, valve sets, all type filters etc along with connected panel board and connecting fixing accessories of complete system etc including repair / rectification of loose / tightness connection and also changing of defective parts which is easly done by techanician at site and making as when required to ensure serviceability of complete plant and daily checking of any type of leakage of gas / pressure / water drop in AC plant and taken immediate action to stop the same leakage and making pump down the complete system and assuring OP, HP & LP are with in safe limit including cleaning of complete plant / plant room / surrounding area neat & clean and also cleaning of cooling tower, air condenser coil unit air filters of AHU etc and removing grass from installation yard and surrounding area and also recording of hourly basis AC plant run in specific log sheet which is as approved by Engineer in charge and log sheet will be provided by the contractor for all working days and also working of three shift duty operator basis of each shift of 08 hours including sunday and holiday) at central AC plant installation complete all as specified and directed. (a) For the 1st year from the date of completion (Manning & Operation)
Note for item No. 6 (i) The M&O shall commence from the date of completion of work covered under Ph-I (ii) The plants shall be run on all working days (24 x 7) or as per basis on user requirements times or as per time schedule directed by AGE E&M / GE including sunday and holiday . (iii) The unit rates shall be also be deemed to be inclusive for to maintain desired temp as per CA if not so more than one hour the necessary panel recovery @ 2000/- per day shal lbe deducted. (iv) The unit rates shall also be deemed to be inclusive for uniform and T&P required for shift duty operator including DG set operation and routine check & maintenance of installation i.e hand gloves, pliers, testers, DE wrench set, ring spanner set, box wrench set, screw driver set, adjustable wrench, including all type of tool which is required at site. (v) The unit rates shall also be deemed to be inclusive for proforma of log sheet, cleaning of plant etc will be arranged by the contractor at no extra cost. (vi) The contractor shall rectify / renewal all the defective parts during defect liability period without extra cost and the cost of the same is included in respective item of AC plant. All consumble items are included in the unit rate of M&O items. (vii) Contractor shall pay not less than the minimum wages, will pay EPF, ESI etc as per labour law to all his workers payment of wages to labour / worers deployed by the contractor shall be done by cheque or through NEFT in their bank account No. RAR / Final bill shall be made to contractor / firms unless proof of payment through Bank of wages to the work in is submitted by the contractor.
Manning & operation and including routine comprehensive maintenance of central AC conditioning plant water cooled type of capacity 39 TR (02 x 13 TR working & 01 x 13 TR stand by) installed at ICU MH AC plant room (Plant shall be run for three shift of 08 hours each ie round the clock) complete for its proper smooth functioning and including operating & maintenance of complete AC plant like compressor unit, condensor unit with pump set and motor, AHU cooling tower, valve sets, all type filters etc along with connected panel board and connecting fixing accessories of complete system etc including repair / rectification of loose / tightness connection and also changing of defective parts which is easly done by techanician at site and making as when required to ensure serviceability of complete plant and daily checking of any type of leakage of gas / pressure / water drop in AC plant and taken immediate action to stop the same leakage and making pump down the complete system and assuring OP, HP & LP are with in safe limit including cleaning of complete plant / plant room / surrounding area neat & clean and also cleaning of cooling tower, air condenser coil unit air filters of AHU etc and removing grass from installation yard and surrounding area and also recording of hourly basis AC plant run in specific log sheet which is as approved by Engineer in charge and log sheet will be provided by the contractor for all working days and also working of three shift duty operator basis of each shift of 08 hours including sunday and holiday) at central AC plant installation complete all as specified and directed. (a) For the 2nd year from the date of completion (Manning & Operation)
Note for item No. 7 (i) The M&O shall commence from the date of completion of work covered under Ph-I (ii) The plants shall be run on all working days (24 x 7) or as per basis on user requirements times or as per time schedule directed by AGE E&M / GE including sunday and holiday . (iii) The unit rates shall be also be deemed to be inclusive for to maintain desired temp as per CA if not so more than one hour the necessary panel recovery @ 2000/- per day shal lbe deducted. (iv) The unit rates shall also be deemed to be inclusive for uniform and T&P required for shift duty operator including DG set operation and routine check & maintenance of installation i.e hand gloves, pliers, testers, DE wrench set, ring spanner set, box wrench set, screw driver set, adjustable wrench, including all type of tool which is required at site. (v) The unit rates shall also be deemed to be inclusive for proforma of log sheet, cleaning of plant etc will be arranged by the contractor at no extra cost. (vi) The contractor shall rectify / renewal all the defective parts during defect liability period without extra cost and the cost of the same is included in respective item of AC plant. All consumble items are included in the unit rate of M&O items. (vii) Contractor shall pay not less than the minimum wages, will pay EPF, ESI etc as per labour law to all his workers payment of wages to labour / worers deployed by the contractor shall be done by cheque or through NEFT in their bank account No. RAR / Final bill shall be made to contractor / firms unless proof of payment through Bank of wages to the work in is submitted by the contractor.
Manning & operation and including routine comprehensive maintenance of central AC conditioning plant water cooled type of capacity 39 TR (02 x 13 TR working & 01 x 13 TR stand by) installed at ICU MH AC plant room (Plant shall be run for three shift of 08 hours each ie round the clock) complete for its proper smooth functioning and including operating & maintenance of complete AC plant like compressor unit, condensor unit with pump set and motor, AHU cooling tower, valve sets, all type filters etc along with connected panel board and connecting fixing accessories of complete system etc including repair / rectification of loose / tightness connection and also changing of defective parts which is easly done by techanician at site and making as when required to ensure serviceability of complete plant and daily checking of any type of leakage of gas / pressure / water drop in AC plant and taken immediate action to stop the same leakage and making pump down the complete system and assuring OP, HP & LP are with in safe limit including cleaning of complete plant / plant room / surrounding area neat & clean and also cleaning of cooling tower, air condenser coil unit air filters of AHU etc and removing grass from installation yard and surrounding area and also recording of hourly basis AC plant run in specific log sheet which is as approved by Engineer in charge and log sheet will be provided by the contractor for all working days and also working of three shift duty operator basis of each shift of 08 hours including sunday and holiday) at central AC plant installation complete all as specified and directed. (a) For the 3rd year from the date of completion (Manning & Operation)
Note for item No. 8 (i) The M&O shall commence from the date of completion of work covered under Ph-I (ii) The plants shall be run on all working days (24 x 7) or as per basis on user requirements times or as per time schedule directed by AGE E&M / GE including sunday and holiday . (iii) The unit rates shall be also be deemed to be inclusive for to maintain desired temp as per CA if not so more than one hour the necessary panel recovery @ 2000/- per day shal lbe deducted. (iv) The unit rates shall also be deemed to be inclusive for uniform and T&P required for shift duty operator including DG set operation and routine check & maintenance of installation i.e hand gloves, pliers, testers, DE wrench set, ring spanner set, box wrench set, screw driver set, adjustable wrench, including all type of tool which is required at site. (v) The unit rates shall also be deemed to be inclusive for proforma of log sheet, cleaning of plant etc will be arranged by the contractor at no extra cost. (vi) The contractor shall rectify / renewal all the defective parts during defect liability period without extra cost and the cost of the same is included in respective item of AC plant. All consumble items are included in the unit rate of M&O items. (vii) Contractor shall pay not less than the minimum wages, will pay EPF, ESI etc as per labour law to all his workers payment of wages to labour / worers deployed by the contractor shall be done by cheque or through NEFT in their bank account No. RAR / Final bill shall be made to contractor / firms unless proof of payment through Bank of wages to the work in is submitted by the contractor.
SHRI RAMSONS PROJECTS CORPORATION
Gupta Automobiles
JASPREET SINGH COOLING CORP.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .