Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 CrAccepted-AOC | ₹7.5 Cr | L1 | Accepted-AOC WORK AWARDED |
| 2 | L1₹7.5 CrRejected-Finance | ₹7.5 Cr | L1 | Rejected-Finance The Bidder unsuccessful through transparent lottery system |
| 3 | L1₹7.5 CrRejected-Finance AT KOLHASINGHA P O SIHA P S BADACHANA DIST JAJPUR 755044 | JAJPUR | JAJPUR | ODISHA | 755044 | ₹7.5 Cr | L1 | Rejected-Finance The Bidder unsuccessful through transparent lottery system |
| 4 | L1₹7.5 CrRejected-Finance | ₹7.5 Cr | L1 | Rejected-Finance The Bidder unsuccessful through transparent lottery system |
| 5 | L1₹7.5 CrRejected-Finance | ₹7.5 Cr | L1 | Rejected-Finance The Bidder unsuccessful through transparent lottery system |
Tender Value
₹7.5 Cr
EMD Value
₹7.5 L
Closing Date
5 Dec 2025, 5:00 pmClosed
CHIEFCONSTRUCTIONENGINEERCENTRALRANDBCIRCLEBBSR
OFFICE OF THE CHIEF CONSTRUCTION ENGINEER, CENTRAL CIRCLE RANDB NIRMAN SOUDHA, BHUBANESWAR.
Improvement of Sardeipur-Nimapada road Uttrasasan-Nimapada from 0.000 Km to 3.480 Km and from 4.830 Km to 6.500Km in the District of Khordha under State Plan for the year 2025-26.
2025_EICCL_121912_1
TENDER CALL NOTICE NO.17 OF 2025-26
Open Tender
Civil Works - Roads
Percentage
180 days
Bhubaneswar
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹7.5 L
Yes
5 Aug 2026
25 Nov 2025
6 Dec 2025
25 Nov 2025
5 Dec 2025
25 Nov 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 28,043 | Sqm | 8.45 | ₹2,36,963.35 |
| 2 | Dismantling of Cement Concrete Grade M-15 & M- 20 including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | 158.6 | Cum | 650.1 | ₹1,03,105.86 |
| 3 | Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works including T&P, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | - | - | - | - |
| 4 | Up to 600 mm dia | 10 | RM | 291.52 | ₹2,915.2 |
| 5 | Excavation for road way in ordinary rock with hydraulic excavator of 0.9cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to the embankment locations with all lifts & leads up to 1000m.as per approved Drawing & Technical Specifications and as per Clause - 301 of MoSRT&H Specifications for Road & Bridge works (Latest Revision). | 10,571.71 | Cum | 74.79 | ₹7,90,658.19 |
| 6 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in table 300-2 for embankment construction construction & Clause 305 of MoSRT&H Specifications for Road & Bridge works (5th Revision) | 3,175.59 | cum | 36.05 | ₹1,14,480.02 |
| 7 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2) and as per Clause -305 of MoSRT&H Specifications for Road & Bridge works (Latest Revision). | 6,049.69 | Cum | 35.83 | ₹2,16,760.39 |
| 8 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 and as per Clause -305 of MoSRT&H Specifications for Road & Bridge works (Latest Revision). | 11,704.32 | Cum | 203.79 | ₹23,85,223.37 |
| 9 | Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the engineer including preparation of ground, fetching of sods and watering & Technical Specifications and as per Clause - 307 of MoSRT&H Specifications for Road & Bridge works (Latest Revision). | 4,953.27 | Sqm | 28.91 | ₹1,43,199.04 |
| 10 | Construction of granular sub-base by providing Grading-VI Material as per table 400-2, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 3,854.23 | cum | 2,696.5 | ₹1,03,92,931.2 |
stage.html
html • 0.11 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
DTCNs.pdf
Tender Documents • 2.40 MB
BOQ_566711.xls
BOQ • 0.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .