| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 LAccepted-AOC | ₹13.2 L Quoted ₹11.2 L | L1 | Accepted-AOC Technically and financially eligible L1 Bidder |
| 2 | L2₹12.4 L+₹1.2 L (10.8%)Rejected-Finance MIG 1 180 PT R S S NAGAR KORBA CHATTISGARH | ₹12.4 L+₹1.2 L (10.8%) | L2 | Rejected-Finance Not L1 Bidder |
| 3 | L3₹13.2 L+₹2.0 L (17.8%)Rejected-Finance MIG 105 DR R P NAGAR PHASE 02 KORBA CG 495677 | KORBA | CHHATTISGARH | 495677 | ₹13.2 L+₹2.0 L (17.8%) | L3 | Rejected-Finance Not L1 Bidder |
| 4 | L4₹13.2 L+₹2.0 L (18.1%)Rejected-Finance | ₹13.2 L+₹2.0 L (18.1%) | L4 | Rejected-Finance Not L1 Bidder |
| 5 | L5₹13.4 L+₹2.2 L (19.7%)Rejected-Finance | ₹13.4 L+₹2.2 L (19.7%) | L5 | Rejected-Finance Not L1 Bidder |
Tender Value
₹27.3 L
EMD Value
₹34,200
Closing Date
5 Nov 2024, 5:00 pmClosed
STAFF OFFICER (CIVIL) KORBA AREA
Office of the General Manager, South Eastern Coalfields Limited, CIVIL DEPARTMENT, KORBA AREA KORBA- 495 677(CG).
Repair and maintenance of Effluent Treatment Plant (oil and grease washing ramp, drain etc.) at Manikpur OCP of Korba Area.
2024_SECL_319875_1
SECL/GM/KA/C/e-Tender/24-25/46 dt.24.10.2024
Open Tender
Civil Works - Others
Item Rate
180 days
Office of the General Manager, Korba Area, SECL
As per NIT
3 documents required · 3 mandatory
₹34,200
29 Jan 2025
25 Oct 2024
7 Nov 2024
26 Oct 2024
5 Nov 2024
26 Oct 2024
26 Oct 2024 - 29 Oct 2024
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand(zone-III) : 6 graded stone aggregate 40 mm nominal size).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
Brick work with clay flyash brick F.P.S. (non modular), class designation 7.5 in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse sand )
Structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete
12 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand)
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm).
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, and binding all complete up to plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers
12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand)
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate
Providing and laying 60mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.
Brick edging 7cm wide 11.4 cm deep to plinth protection with FLY ASH F.P.S. (non modular) bricks of class designation 7.5 including grouting with cement mortar 1:4 (1 cement : 4 fine sand).
Carriage of materials by mechanical transport including loading, unloading and stacking earth lead 1.00 KM.
Total impact of GST for the purpose of CTC
ASHISH TIWARI (BID ID -1098364)
Shree Balajee Construction (BID ID -1097160)
AVINASH RAI (BID ID -1099141)
KESHAV PANDEY (BID ID -1098433)
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_331572.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .