Loading…
Loading…
Tender Value
₹1.7 L
EMD Value
₹1,673
Closing Date
28 Aug 2026, 3:00 pm5d left
EE STC Khandwa
O/o EE STC Khandwa Anand Nagar Khandwa
SUPPLY AND ERECTION ON SEMI TURNKEY BASIS AUGMENTATION WORK OF 33/11 KV SUB STATION DHANGAON 3.15 TO 5 MVA PTR UNDER SANAWAD EAST DC UNDER PUNASA DIVISION ESTIMATE NUMBER 496406/03.06.26
2026_MPPKV_530832_1
EE/STC/WORK/2026- 27/TS/172/935 Dt 17.08.26
Open Tender
Electrical Works
Percentage
30 days
Dhangaon
As Per Tender Documnet
10 documents required · 10 mandatory
₹1,000
₹1,673
Yes
O/o EE STC Khandwa
19 Aug 2026
19 Aug 2026
31 Aug 2026
19 Aug 2026
28 Aug 2026
19 Aug 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Work | |||||
| 1.01 | Name of Work: SUPPLY AND ERECTION ON SEMI TURNKEY BASIS
AUGMENTATION WORK OF 33/11 KV SUB STATION DHANGAON 3.15 TO 5
MVA PTR UNDER SANAWAD EAST DC UNDER PUNASA DIVISION
ESTIMATE NUMBER 496406/03.06.26 | 1 | Nos | 1,67,265 | ₹1,67,265 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tenderdocument.pdf
Tender Documents • 1.70 MB
BOQ_638672.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].