Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.0 CrAccepted-AOC | ₹1.0 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.1 Cr+₹11.2 L (11.1%)Rejected-AOC | ₹1.1 Cr+₹11.2 L (11.1%) | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | VIKESH KUMAR CONTRACTOR L2 | THE ARIAN WALA COOP L AND C SOCIETY LTD L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation in soil (any type) using Hydraulic Excavator CK 90 Excavation with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirement of lines, grades and cross sections, including all lifts and combined lead up to 30m. (CSR item no. 6.19) | 1 | Cum | 154 ₹12,50,921.98 | 138 ₹11,20,956.06 Lowest |
| 2.00 | Preparing, watering and ramming surface for laying concrete. C.S.R. No. 10.35b (i) | 1 | Sqm | - | - |
| 3.00 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (CSR item no. 21.4) | 1 | Cum | - | - |
| 4.00 | Reinforced cement concrete M-25 complete as per drawing and Technical Specifications height upto 5 Mtrs using concrete mixer (CSR item no. 21.32 F/i) | 1 | Cum | 214.75 ₹34,810.98 | 191.74 ₹31,081.05 Lowest |
| 5.00 | Centring and shuttering for faces of walls, partitions, retaining walls and the like (vertical and bartering including attached pillasters buttresses etc). Complete in all respect. (CSR Item No. 9.2) | 1 | Sqm | 36.29 ₹3,70,734.29 | 32.4 ₹3,30,994.51 Lowest |
| 6.00 | Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete (CSR item no. 18.18) | 1 | Qtl | 110.77 ₹8,29,167.73 | 98.9 ₹7,40,314.96 Lowest |
| 7.00 | Extra for compaction of earth including laying earth in 20cm layers, watering and rolling to specifications. (CSR item no. 24.5 b (i+ii+iii)) | 1 | Cum | 176.96 ₹3,70,113.61 | 165 ₹3,45,099.15 Lowest |
| 8.00 | Re-handling of Earthwork with lead 30 meters (CSR note no. 6.2) | 1 | Cum | 20.33 ₹2,24,321.22 | 19.22 ₹2,12,073.48 Lowest |
| 9.00 | Supply and laying dry brick ballst as graded filter beneath CCM blocks (CSR item no.10.30) | 1 | Cum | 248.64 ₹1,95,679.68 | 229 ₹1,80,223 Lowest |
| 10.00 | Excavation in soil using J.C.B and Hydraulic Tractor trolley with disposal with an avg. lead 0.95 km i/c 0.95 Km katcha including cutting and loading in trolley, trimming bottom and side slopes in accordance with requirement of grades and X-Sections and Transporting to the embankment locations with all lift and leads (CSR item no. 19.38) | 1 | Cum | 24.77 ₹3,08,014.95 | 23 ₹2,86,005 Lowest |
Tender Value
₹1.6 Cr
EMD Value
₹3.3 L
Closing Date
19 Jun 2025, 10:00 amClosed
Xen Fazilka Canal And Ground Water Division CC FZR
Xen Fazilka Canal And Ground Water Division CC FZR
Estimate for Relining of Saidoke Disty Rd 40000-49500 and Reconstruction/Remodeling of Pucca Structures and other allied works of Saidoke Disty.
2025_WR_139344_10
002/FazilkaCanal/2025-26 dated 25/04/2025
Open Tender
Civil Works - Canal
Item Wise
Xen Fazilka Canal And Ground Water Division CC FZR
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹3.3 L
Yes
Xen Fazilka Canal And Ground Water Division CC FZR
3 Nov 2025
28 Apr 2025
19 Jun 2025
28 Apr 2025
19 Jun 2025
28 Apr 2025
7 May 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .