| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC GRAM SOHANAAG THANA BELGHAT DISTRICT GORAKHPUR | ₹8.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.4 LRejected-Finance | ₹10.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹10.9 LRejected-Finance | ₹10.9 L | L3 | Rejected-Finance L3 |
| 4 | L4₹12.2 LRejected-Finance 1 306 LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | ₹12.2 L | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | RAVINDRA SINGH L2 | KALAYANI CONSTRUTION L1 | M/S S S ENTERPRISES L4 | M/S SHYAM CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|
| 1.00ITEM OF WORK FOR (145 MTR. LENGTH) | |||||||
| 1.01 | earth work in excavation by mecanical means in foundation trench or drain not exceeding 1.5mtr in width or 10 sqm on plan. Including dresing of sides, FOR FOOTING OF COLUMN, FOR BICK WORK BETWEEN COLOUMNS | 63.81 | CUM | 80 ₹5,104.80 | 133 ₹8,486.73 | 155 ₹9,890.55 | 70 ₹4,466.70 |
| 1.02 | PROVIDING AND LAYING IN POSTION CEMENT CONCREAT OF SPECIFIC GRADE EXCLUDING THE COST OF CENTERING AND SHUTERING 1:4:8, FOR FOOTING OF COLUMN, FOR BICK WORK BETWEEN COLOUMNS | 8.83 | CUM | 6,580 ₹58,101.40 | 3,496 ₹30,869.68 | 4,000 ₹35,320 | 8,800 ₹77,704 |
| 1.03 | Steel reinforcement work RCC work including straightening, cutting, bending, placing in postion and binding in all coplete up to plinth level with steel bars of grade FE-500D or more FOR FOOTING OF COLUMN, | 1.99 | MT | 61,000 ₹1.2 L | 55,690 ₹1.1 L | 63,500 ₹1.3 L | 56,000 ₹1.1 L |
| 1.04 | Providing and laying in postion specified grade of reinforced cement concrete, excluding the cost of centering ,shuttering , finishing and reinforcement all work up to plinth level 1:1.5:3, FOR FOOTING OF COLUMN BOTTOM, FRUSTUM PART | 9.19 | CUM | 5,500 ₹50,545 | 4,643 ₹42,669.17 | 5,500 ₹50,545 | 8,700 ₹79,953 |
| 1.05 | CENTERING AND SHUTTERING INCLUDING STRUTTING PROPPING ETC FOR LINTEL BEAMS PLINTHS BEAMS GIRDER ETC | 32.4 | SQM | 700 ₹22,680 | 200 ₹6,480 | 300 ₹9,720 | 300 ₹9,720 |
| 2.00 | CENTERING AND SHUTTERING INCLUDING STRUTTING PROPPING ETC, COLUMN PILLERS PIERS POSTS AND STRUTS | 141.52 | SQM | 700 ₹99,064 | 493 ₹69,769.36 | 600 ₹84,912 | 280 ₹39,625.60 |
| 3.00 | Reinforced cement concrete work in walls including attached pilasters buttresses plinth and string courses fillets coloumns pillars piers etc , above plinth level uo to floor level with 1:1.5:3, for column, for pb | 13.93 | CUM | 11,000 ₹1.5 L | 5,570 ₹77,590.10 | 6,500 ₹90,545 | 8,700 ₹1.2 L |
| 4.00 | brick work in foundation and plinth WITH 1:6 (1 cement:6 corase sand) | 25.54 | CUM | 500 ₹12,770 | 360 ₹9,194.40 | 5,000 ₹1.3 L | 4,500 ₹1.1 L |
| 5.00 | providing and laying damp proof course 50mm thick with cement concrete 1:2:4 | 30.77 | SQM | 300 ₹9,231 | 254 ₹7,815.58 | 350 ₹10,769.50 | 90 ₹2,769.30 |
Tender Value
₹15.5 L
EMD Value
₹30,920
Closing Date
17 Oct 2025, 12:00 pmClosed
EE LID GORAKHPUR
OFFICE EE LID GORAKHPUR
NABARD Funded Modernization of Ch. Charan Singh Doharighat Pump Canal, Distt- Mau SGR BUILDING BOUNDARY WORK (145 MRT. LENGTH) with all requierd accessories, tool and tackle at doharighat pump canal mau
2025_UPIDM_1073772_2
1095/EE-LID GKP/02/09/2025/26-27
Open Tender
Civil Works
60 days
DOHARIGHAT MAU
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹30,920
Yes
13 Dec 2025
11 Oct 2025
17 Oct 2025
11 Oct 2025
17 Oct 2025
11 Oct 2025
Amount
ITEM OF WORK FOR (145 MTR. LENGTH)
earth work in excavation by mecanical means in foundation trench or drain not exceeding 1.5mtr in width or 10 sqm on plan. Including dresing of sides, FOR FOOTING OF COLUMN, FOR BICK WORK BETWEEN COLOUMNS
PROVIDING AND LAYING IN POSTION CEMENT CONCREAT OF SPECIFIC GRADE EXCLUDING THE COST OF CENTERING AND SHUTERING 1:4:8, FOR FOOTING OF COLUMN, FOR BICK WORK BETWEEN COLOUMNS
Steel reinforcement work RCC work including straightening, cutting, bending, placing in postion and binding in all coplete up to plinth level with steel bars of grade FE-500D or more FOR FOOTING OF COLUMN,
Providing and laying in postion specified grade of reinforced cement concrete, excluding the cost of centering ,shuttering , finishing and reinforcement all work up to plinth level 1:1.5:3, FOR FOOTING OF COLUMN BOTTOM, FRUSTUM PART
CENTERING AND SHUTTERING INCLUDING STRUTTING PROPPING ETC FOR LINTEL BEAMS PLINTHS BEAMS GIRDER ETC
CENTERING AND SHUTTERING INCLUDING STRUTTING PROPPING ETC, COLUMN PILLERS PIERS POSTS AND STRUTS
Reinforced cement concrete work in walls including attached pilasters buttresses plinth and string courses fillets coloumns pillars piers etc , above plinth level uo to floor level with 1:1.5:3, for column, for pb
brick work in foundation and plinth WITH 1:6 (1 cement:6 corase sand)
providing and laying damp proof course 50mm thick with cement concrete 1:2:4
brick work in foundation and plinth WITH 1:6 (1 cement:6 corase sand) for boundry wall
12mm thick cement plaster of mix 1:4 for boundry wall
finishing walls with premium acrylic smooth exterior paint with silicone additive of requierd shade new work (two coat or more) @1.43ltr/10sqm over and including priming coat of exterior primer applied @.90 liter/10 sqm for boundry wall
providing 12x15 mm section groove in plaster including all materials labour and T&P requierd for completion of work
steel work welded in built up sections framed work including cutting hoisting fixing in postion and applying a primer coat of approved steel primer using structural steel etc as requierdFOR ANGLE 40X40X10 MM
PROVIDING AND FIXING CONCERTINA COIL FENCING WITH PUNCHED TAPE CONCERTINA COIL 600MM DIA 10 MTR OPENABLE LENGTH (TOTAL LENGTH 90MTR) HAVING 50NOS. ROUND PER 6 MTR LENGTH UPTO 3METER HEIGHT OF WALL WITH EXISTING ANGLE IRON "Y" SHAPED PLACED 2.4 MTR OR 3.0 MTR APART AND WITH 9 HORIZONTAL R.B.T REINFORCED BARBED WIRE
RAVINDRA SINGH (BID ID -5613801)
M/S SHYAM CONSTRUCTION (BID ID -5613705)
M/S S S ENTERPRISES (BID ID -5613968)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid