| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹139 CrAccepted-AOC 126 A JAIPUR HOUSE AGRA 282010 PH NO 0562 2810176 9897638555 | ₹139 Cr Quoted ₹144.3 Cr | L1 | Accepted-AOC Being lowest bidder |
| 2 | L2₹148.0 CrRejected-Finance 1 513 VIDHYADHAR NAGAR JAIPUR 302039 RAJASTHAN | JAIPUR | RAJASTHAN | 302039 | ₹148.0 Cr | L2 | Rejected-Finance Not being Lowest |
| 3 | L3₹158.5 CrRejected-Finance | ₹158.5 Cr | L3 | Rejected-Finance Not being Lowest |
| 4 | L4₹159.2 CrRejected-Finance C 2488 SUSHANT LOK PHASE 1 GURGAON 122001 HARYANA | GURUGRAM | HARYANA | 122001 | ₹159.2 Cr | L4 | Rejected-Finance Not being Lowest |
| 5 | L5₹160.0 CrRejected-Finance C 102 ANSAL PLAZA HUDCO PLACE KHELGAON MARG NEAR SOUTH EXTENSION NEW DELHI 110 049 | ₹160.0 Cr | L5 | Rejected-Finance Not being Lowest |
Tender Value
₹150 Cr
EMD Value
₹75 L
Closing Date
5 Sept 2024, 6:00 pmClosed
DG MAP
DG MAP, KASHMIR HOUSE, DELHI
DGMAPPHIIPKG11RCARMY2 21 OF 2023-24 COMPLETION OF BALANCE WORKS FOR CONSTRUCTION OF DWELLING UNITS INCLUDING SERVICES AT MEERUT WEST
2024_MES_647382_1
DGMAPPKG11RCARMY2OF2023-2024
Open Tender
Civil Works
730 days
MEERUT
Please refer Tender documents.
11 documents required · 11 mandatory
₹3,000
DGMAP
₹75 L
DGMAP DELHI
20 Nov 2024
22 Mar 2024
16 Sept 2024
15 May 2024
5 Sept 2024
4 Jul 2024
24 May 2024 - 29 May 2024
24 May 2024
Amount
Schedule A Sec I List of price for building works (Note) -The details of balance work and photographs of each block is enclosed for reference only. The tenderers are advised to visit the site and workout their balance works before quoting their lump sum amount against each block. Completion of balance work for construction of block of 6 Dwelling Units for ORs at SHIVAJI LINE Site, in triple storyed construction (ground + 2 floors ).framed structure including covered garages ,covered staircase,verandahs,baconies,dryout balconies,dry out verandahs,enterance verandah,ramps,passage,platforms,plinth protection around the block,steps etc. complete all as specified and shown on drawing.
Block-1 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-I
Block-2SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-2
Block-3 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-3
Block-4 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-4
Block-5 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-5
Block-6 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-6
Block-7SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-7
Block-8SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-8
Block-9SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-9
Block-10SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-10
Block-11SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-11
Block-12SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-12
Block-13SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-13
Block-14SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-14
Block-15SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-15
Block-16SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-16
Block-17SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-17
Block-18SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-18
Block-19SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-19
Block-20SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-20
Block-21SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-21
Block-22 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-22
Block-23SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-23
Block-24SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-24
Block-25SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-25
Block-26SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-26
Block-27 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-27
Block-28SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-28
Block-29SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-29
Block-30SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-30
Block-31SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-31
Block-32SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-32
Block-33SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-33
Block-34SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-34
Block-35SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-35
Block-36SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-36
Block-37SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-37
Block-38SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-38
Block-39SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-39
Block-40SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-40
Block-41SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-41
Block-42SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-42
Block-43SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-43
Block-44SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-44
Block-45SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-45
Block-46SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-46
Block-47SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-47
Block-48SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-48
Block-49SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-49
Block-50SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-50
Block-51SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-51
Block-52SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-52
Block-53SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-53
Block-54SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-54
Block-55SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-55
Block-56SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-56
Block-57SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-57
Block-58SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-58
Block-59SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-59
Block-60SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-60
Block-61SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-61
Block-62SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-62
Block-63SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-63
Block-64SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-64
Block-65SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-65
Block-66SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-66
Block-67SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-67
Block-68SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-68
Block-69SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-69
Block-70SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-70
Block-71SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-71
Block-72SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-72
Block-73SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-73
Block-74SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-74
Block-75SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-75
Block-76SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-76
Block-77SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-77
Block-78SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-78
Block-79SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-79
Block-80SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-80
Block-81SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-81
Block-82SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-82
Block-83SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-83
Block-84SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-84
Block-85SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-85
Block-86SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-86
Block-87SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-87
Block-88SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-88
Block-89SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-89
Block-90SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-90
Block-91SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-91
Block-92SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-92
Block-93SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-93
Block-94SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-94
Block-95SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-95
Block-96SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-96
Block-97SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-97
Block-98SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-98
Block-99SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-99
Block-100SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-100
Block-101SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-101
Block-102SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-102
Block-103SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-103
Block-104SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-104
Block-105SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-105
Block-106SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-106
Block-107SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-107
Block-108SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-108
Block-109SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-109
Block-110SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-110
Block-111SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-111
Block-112SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-112
Block-113SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-113
Block-114SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-114
Block-115SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-115
Block-116SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-116
Block-117SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-117
Block-118SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-118
Block-119SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-119
Block-120SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-120
Block-121SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-121
Block-122SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-122
Block-123SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-123
Block-124SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-124
Block-125SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-125
Block-126SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-126
Block-127SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-127
Block-128SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-128
Block-129SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-129
Block-130SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-130
Block-131SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-131
Block-132SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-132
Block-133SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-133
Block-134SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-134
Block-135SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-135
Block-136SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-136
Block-137SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-137
Block-138SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-138
Block-139SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-139
Block-140SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-140
Block-141SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-141
Block-142SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-142
Block-143SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-143
Block-144SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-144
Completion of balance work for construction of block of 6 Dwelling Units for JCOs at SHIVAJI LINE Site, in triple storyed construction (ground + 2 floors ).framed structure including covered garages ,covered staircase,verandahs,balconies,dryout balconies,dry out verandahs,enterance verandah,ramps,passage,platforms,plinth protection around the block,steps etc. complete all as specified and shown on drawing.
Block-1 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-145
Block-2 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-146
Block-3 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-147
Block-4 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-148
Block-5 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-149
Block-6 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-150
Block-7 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-151
Block-8 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-152
Block-9 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-153
Block-10 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-154
Block-11 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-155
Block-12 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-156
Block-13 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-157
Block-14 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-158
Block-15 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-159
Block-16 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-160
Block-17 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-161
Block-18 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-162
Block-19 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-163
Block-20 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-164
Block-21 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-165
Block-22 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-166
Block-23 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-167
Block-24 SHIVAJI LINE Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-168
Schedule A Sec I List of price for building works (Note) -The details of balance work and photographs of each block is enclosed for reference only. The tenderers are advised to visit the site and workout their balance works before quoting their lump sum amount against each block. Completion of balance work for construction of block of 6 Dwelling Units for ORs at FARM HOUSE SOUTH Site, in triple storyed construction (ground + 2 floors ).framed structure including covered garages ,covered staircase,verandahs,balconies,dryout balconies,dry out verandahs,enterance verandah,ramps,passage,platforms,plinth protection around the block,steps etc. complete all as specified and shown on drawing.
Block-1MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-169
Block-2MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-170
Block-3MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-170A
Block-4MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-171
Block-5MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-172
Block-6MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-173
Block-7MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-174
Block-8MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-175
Block-9MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-176
Block-10MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-177
Block-11MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-178
Block-12MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-179
Block-13MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-180
Block-14MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-181
Block-15MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-182
Block-16MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-183
Block-17MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-184
Block-18MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-185
Block-19MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-186
Block-20MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-187
Block-21MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-188
Block-22MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-189
Block-23MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-190
Block-24MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-191
Block-25MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-192
Block-26MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-193
Block-27MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-194
Block-28MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-195
Block-29MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-196
Block-30MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-197
Block-31MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-198
Block-32MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-199
Block-33MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-200
Block-34MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-201
Block-35MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-202
Block-36MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-203
Block-37MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-204
Block-38MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-205
Block-39MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-206
Block-40MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-207
Block-41MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-208
Block-42MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-209
Block-43MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-210
Block-44MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-211
Block-45MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-212
Block-46MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-213
Block-47MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-214
Block-48MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-215
Block-49MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-216
Block-50MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-217
Block-51MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-218
Block-52MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-219
Block-53MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-220
Block-54MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-221
Block-55MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-222
Block-56MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-223
Block-57MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-224
Block-58MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-225
Block-59MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-226
Block-60MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-227
Block-61MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-228
Block-62MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-229
Block-63MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-230
Block-64MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-231
Block-65MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-232
Block-66MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-233
Block-67MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-234
Block-68MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-235
Block-69MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-236
Block-70MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-237
Block-71MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-238
Block-72MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-239
Block-73MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-240
Block-74MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-241
Block-75MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-242
Block-76MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-243
Block-77MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-244
Block-78MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-245
Block-79MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-246
Block-80MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-247
Block-81MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-248
Block-82MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-249
Block-83MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-250
Block-84MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-251
Block-85MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-252
Block-86MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-253
Block-87MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-254
Block-88MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-255
Block-89MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-256
Block-90MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-257
Block-91MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-258
Block-92MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-259
Block-93MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-260
Block-94MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-261
Block-95MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-262
Block-96MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-263
Block-97MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-265
Block-98MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-266
Block-99MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-267
Block-100MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-268
Block-101MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-269
Block-102MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-270
Block-103MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-271
Block-104MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-272
Block-105MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-273
Block-106MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-274
Block-107MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-275
Block-108MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-276
Block-109MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-277
Block-110MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks ORs Accomodation, balance work in that yardsticks as Annexure-278
Completion of balance work for construction of block of 6 Dwelling Units for JCOs at MILITARY FARM SOUTH Site, in triple storyed construction (ground + 2 floors ).framed structure including covered garages ,covered staircase,verandahs,baconies,dryout balconies,dry out verandahs,enterance verandah,ramps,passage,platforms,plinth protection around the block,steps etc. complete all as specified and shown on drawing.
Block-1 MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-279
Block-2 MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-280
Block-3 MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-281
Block-4 MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-282
Block-5 MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-283
Block-6 MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-284
Block-7 MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-285
Block-8MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-286
Block-9 MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-287
Block-10 MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-288
Block-11 MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-289
Block-12 MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-290
Block-13 MILITARY FARM SOUTH Note:The detail of work executed in percentage in terms of yardsticks JCOs Accomodation, balance work in that yardsticks as Annexure-291
Completion of balance works of construction of Garbage BIN Complete all as specified and shown on Drawings MILITARY FARM (South) NEAR BLOCK NO 45 ANNEXURE 292
Completion of balance works of construction of Garbage BIN Complete all as specified and shown on Drawings SHIVAJI LINE ANNEXURE 293
Completion of balance works of construction of Garbage BIN Complete all as specified and shown on Drawings MILITARY FARM (South) NEAR BLOCK NO1 ANNEXURE 294
Completion of balance works of construction of Garbage BIN Complete all as specified and shown on Drawings MILITARY FARM (South) NEAR BLOCK NO8 ANNEXURE 295
Completion of balance works of construction of Garbage BIN Complete all as specified and shown on Drawings MILITARY FARM (South) NEAR BLOCK NO15 ANNEXURE 296
Completion of balance works of construction of Garbage BIN Complete all as specified and shown on Drawings MILITARY FARM (South) NEAR STP-2 ANNEXURE 297
Completion of balance works of construction of Garbage BIN Complete all as specified and shown on Drawings MILITARY FARM (South) ANNEXURE 298
Completion of balance work of construction of Guard Post complete all as specified and shown on Drawings. SHIVAJI LINE ANNEXURE -299
Completion of balance work of construction of Guard Post complete all as specified and shown on Drawings. SHIVAJI LINE ANNEXURE -300
Completion of balance work of construction of Guard Post complete all as specified and shown on Drawings. MILITARY FARM( SOUTH) ANNEXURE -301
SCH "A " SECTION - II INTERNAL WATER SUPPLY Total of Sch " A " Section -II
SCH "A " SECTION - III INTERNAL ELECTRIFICATION Total of Sch " A " Section -III
SCH "A " SECTION- IV ROAD, PATH & CULVERTS Total of Sch " A " Section -IV
List of works & prices for AREA DRAINAGE. Schedule A, Section V.
List of works & prices for SECURITY WALL ,FENCING, CATTLE TRAP & GATE . Schedule A, Section VI.
List of works & prices for RAIN WATER HARVESTING . Schedule A, Section VII.
List of works & prices for SOLAR HEATING SYSTEM . Schedule A, Section VIII.
List of works & prices for STREET LIGHTING . Schedule A, Section IX.
List of works & prices for SITE CLEARANCE . Schedule A, Section X.
DEFECTS SCH "A " SECTION - II INTERNAL WATER SUPPLY Total amount
DEFECTS SCH "A " SECTION - III INTERNAL ELECTRIFICATION Total amount
DEFECTS SCH "A " SECTION- IV ROAD, PATH & CULVERT Total amount
DEFECTS List of works & prices for Area Drainage. Schedule A, Section V. Total amount
DEFECTS List of works & prices for Security wall ,Fencing, Cattle Trap and Gate. Schedule A, Section VI. Total amount
DEFECTS List of works & prices for RAIN WATER HARVESTING. Schedule A, Section VII. Total amount
DEFECTS List of works & prices for STEET LIGHTING . Schedule A, Section IX. Total amount
DEFECTS List of works & prices forDLP PW LINE (ARUN KHETERPAL ENCLAVE) . Schedule A, Section XII. Total amount
DEFECTS List of works & prices forDLP CANDETH (SOMNATH ENCLAVE) . Schedule A, Section XIII. Total amount
Material & Labor 80mm thick factory made cement concerete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction and approved size and design/shape laid in required color and pattern (Red) over , filling the joints with coarse sand etc. complete all as specified and as directed by Project Manager .
Material & Labor 80mm thick factory made cement concerete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction and approved size and design/shape laid in required color and pattern (yellow) over , filling the joints with coarse sand etc. complete all as specified and as directed by Project Manager
LNA INFRAPROJECTS PRIVATE LIMITED (BID ID -3087377)
Ashish Enterprises (BID ID -3056414)
Ktech Engineer Builders Co. Pvt. Ltd (BID ID -3076787)
GIRDHARI LAL CONSTRUCTIONS PVT LTD (BID ID -3080046)
PUSHKARRAJ CONSTRUCTION PRIVATE LIMITED (BID ID -3080514)
Inderjit Mehta Constructions Pvt Ltd (BID ID -3075640)
Kanwarji Construction Co. (BID ID -3079872)
Som Projects Pvt Ltd (BID ID -3056014)
Varindera Constructions Limited (BID ID -3086714)
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid