Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹71.3 LAccepted-AOC A 101 YASH HEIGHT 140 RAMDASPETH NAGPUR DIST NAGPUR M H 440010 | NAGPUR | MAHARASHTRA | 440010 | ₹71.3 L | L-1 | Accepted-AOC L-1 bidder |
| 2 | L-2₹72.4 L+₹1.1 L (1.52%)Rejected-Finance CAMP VILLAGE DEVGAI POST KUDRI SHADOL MP PIN 484110 | SHAHDOL | MADHYA PRADESH | 484110 | ₹72.4 L+₹1.1 L (1.52%) | L-2 | Rejected-Finance Concluded from BOQ as L-2 bidder. |
| 3 | L-3₹74.7 L+₹3.4 L (4.80%)Rejected-Finance WARD NO 06 RANJCET DAFAI AMLAI COLLIERY DISTT ANUPPUR M P | ANUPPUR | ANUPPUR | MADHYA PRADESH | ₹74.7 L+₹3.4 L (4.80%) | L-3 | Rejected-Finance Concluded from BOQ as L-3 bidder. |
| 4 | Rejected-Technical | - | - | Rejected-Technical Documents are not in line with NIT, hence disqualified. |
Tender Value
₹84.2 L
EMD Value
₹1.1 L
Closing Date
28 Jul 2023, 5:00 pmClosed
Office of SO (Civil)/CHA
Office of AGM/CHA
Hydraulic roof bolting with resin capsule by contractual mean at panel C depillaring and proposed panel D at Nandgaon Inclines of Hindustan Lalpeth Sub Area.Labour rate
2023_WCL_283418_1
WCL_CHA_civil_eT-025
Open Tender
Civil Works - Others
Item Rate
450 days
HLSA
As per NIT
6 documents required · 6 mandatory
₹1.1 L
19 Oct 2023
12 Jul 2023
29 Jul 2023
12 Jul 2023
28 Jul 2023
12 Jul 2023
12 Jul 2023 - 25 Jul 2023
Amount
Roof bolting by deploying three or more Nos. DGMS approved hydraulic roof bolting machine complete with hydraulic power pack for drilling of holes on roof of sides in underground gallery up to 1.8 m grouting of roof bolts with resin capsule, inclusive of cost of drill rods an drill bits and inclusive of labour charges for fixing of bearing plates & nuts, W- strap but excluding cost of resin capsule. W-strap roof bolts bearing plates. & nut bolts, which shall be provided by the company free of cost inclusive of loading of all materials in to the tub/trolley and transportation up to the work site as per instruction of engineer in charge. This cost including supply of roof drilling hydraulic power pack, hydraulic drill machine, installation & commissioning stock & spare, supply of drilling rod, drill bit& hoses, As per fractional experience manpower for drilling and grouting all jobs & all cost of labour and excluding cost of roof bolt, nut, servo-68, power, water, W-strap roof dressing & site clearance. Proposed duration of contractor is 15 Month (455 days). Total 4000 unskilled labour and 1000 skilled labour to be engaged in the entire work.
Total impact of GST for the purpose of CTC
RAVI KUMAR JAISWAL
UDAY RAJ SINGH
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .