Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹4.3 L+₹14,665.60 (3.51%)Rejected-AOC | L2 | Rejected-AOC REJECTED |
| Sl No | Description | Qty | Unit | SRII BALAJI CONSTRUCTIONS L2 | ARV AND CO L1 |
|---|---|---|---|---|---|
| 1.00 | Removal and Relaying of RCC Cover Slabs the existing drain including all labours etc., complete | 4.5 | m2 | 520 ₹2,340 | 512 ₹2,304 Lowest |
| 2.00 | Desilting the existing drain including all labours etc., complete | 10 | m3 | 100 ₹1,000 | 97 ₹970 Lowest |
| 3.00 | Dismantling the existing damaged PCC drain wall including all labours etc., complete | 9 | m3 | 500 ₹4,500 | 486 ₹4,374 Lowest |
| 4.00 | Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc., complete as per standard specification 23 & 24 VI (S2) VII.9,10 | 75 | m3 | 125 ₹9,375 | 123 ₹9,225 Lowest |
| 5.00 | Plain Cement concrete 1:4:8 mix (one cement, four sand, eight metal) using 40mm size Hard Broken stone etc complete | 10.5 | m3 | 5,350 ₹56,175 | 5,306 ₹55,713 Lowest |
| 6.00 | Supplying and erecting CENTERING for sides and soffits including supports and strutting upto 3.29m high for plane surfaces for drain, culverts etc., using mild steel sheets of size 90cm * 60cm and BG 10 stiffened with welded mild steel angles of size 25mm * 25mm * 3mm for boarding laid over countrywood joists of size 10cm * 6.5cm spaced at about 90cm centre to centre and supported by Casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre etc., complete as directed. | 275 | m2 | 300 ₹82,500 | 270 ₹74,250 Lowest |
| 7.00 | Plain concrete 1:3:6 (one cement, two sand and four aggregate) using 20mm ISS HBG metal including cost and conveyance of all material to work site and labor charges for mixing,laying,compacting and curing etc, complete as per ss | 41 | m3 | 6,050 ₹2,48,050 | 6,010 ₹2,46,410 Lowest |
| 8.00 | Plastering in Cement Mortar 1:5 Mix With 12mm Thick | 53 | m2 | 300 ₹15,900 | 271 ₹14,363 Lowest |
| 9.00 | Conveying the excavated earth, silt, brickwork, RR masonry etc from the site to 15km distance including loading and unloading etc complete | 65.8 | m3 | 200 ₹13,160 | 163 ₹10,725.4 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
27 May 2025, 3:00 pmClosed
Assistant Commisssioner,West Zone
West Zone, Coimbatore Corporation
Reconstruction of Storm Water Drain at Kannappapuram in Ward no 45 of West Zone.
2025_MAWS_557786_30
E1/Westzone/2025
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation.
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹5,000
11 Mar 2026
15 May 2025
27 May 2025
16 May 2025
27 May 2025
16 May 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .