Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹9.8 L
EMD Value
₹10,000
Closing Date
17 Apr 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer
Block Development Officer Nemili Block, Ranipet District. 631201
Deepening and Construction of Baby Pond with Retaining wall and Bathing Ghat at Eswaran Koil Kulam (SF No 399), (U15123838P169A3) H/o Poigainallur Panchayat in Nemili Block, Ranipet District 2nd call
2023_RDTN_300875_1
A3/1289/2023 Date 10.04.2023
Open Tender
Civil Works
Works
90 days
Nemili Block
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,000
17 Apr 2023
11 Apr 2023
17 Apr 2023
11 Apr 2023
17 Apr 2023
11 Apr 2023
Amount
Nemili Block
1.Deepening & Desilting construction Of Retaining wall for Baby pond , construction of bathing ghat Construction of step over tank bund improvement to Eswaran Kovil Kulam in Poigainallur Panchayat in nemili block, Ranipet District
Clearing the scrub jungle, Julliflora Jungle and disposing of the same as directed by the Engineer incharge of works and as per technical specification [ specification 2.2]
Earth work in all soils except hard rock requiring blasting and conveying and formation of bund with 0 to 100m deploying earth moving machineries and tippers including benching, formation of bunds breaking clods, sectioning, labour and Hire charges for closing breaches for extra watering and consolidation by power roller including hire charges etc complete
Total Earthwork Quantity
Channel Earthwork Quantity
Supplying and fixing of RCC Boundrary Stone of Size 0.15 x0.15x1.60m
Construction of Retaining wall for Baby Pond
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.
Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc.,
Construction of Bathing Ghat, Steps, Outer Platform
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.
CC 1:3:6 mix using 20mm metal including cost and conveyance and all labour charges etc.
CC 1:2:4 mix using 20mm metal including cost and conveyance and all labour charges etc.
Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc.,
Construction of Steps over Bund
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.
CC 1:2:4 mix using 20mm metal including cost and conveyance and all labour charges etc.
Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc.,
Arrangements for Revetment
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc. Below GL
CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.
Supply suitable gravel and providing gravel packing 15cm thick for revetment
Rough stone dry packing for revetment and apron using new stone obtained by approved sources
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
K.Moorthy
stage.html
html • 0.02 MB
finance_356850.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .