Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | -11.05% | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 CrAdmitted-Finance | +9.99% | ₹1.3 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.4 CrAdmitted-Finance AT BADIJINGAL P O SANKHESWAR DISTRICT JAGATSINGHPUR | JAGATSINGHPUR | ODISHA | +15.00% | ₹1.4 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Not qualify finanacial bid |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
31 Jan 2026, 5:00 pmClosed
Executive Engineer, CD-I
At Bikash Bhawan, Jagannathlane Badambadi
Renovation and Beautification of Dwarika Pond at Maruari Bagicha Shelter Chhack in Ward No. 9.
2026_ORULB_124507_4
MC(CMC)CTC_Div-I_No.20/2025-26
Open Tender
Civil Works - Others
120 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹1.2 L
Yes
5 May 2026
16 Jan 2026
4 Feb 2026
16 Jan 2026
31 Jan 2026
16 Jan 2026
Pond Excavation Supplying all materials, labour and T&P etc. and providing dewatering Volume of Water, complete as directed by the Engineer-in-charge.(De-Watering)
Supplying all materials, labour and T&P etc. and uprooting rank vegetation and weeds by digging the area to a depth of 60 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts, complete as per direction of Engineer-in-charge.(De-Weeding)
Supplying all labour and T&P etc. and earth work in slusy soil (in water up to 0.60 Mtr. depth requiring the aid of pan and vessels) within 50 Mtr. initial lead and two extra lift over the initial lift of 1.5 Mtr., complete as per direction and specification of the Engineer-in-charge.(De-Silting)
RCC work M20 with 20 mm and down graded size black hard grinite ( crusher broken ) stone chips including hoisting,lowering & laying concrete & compacting by using vibrator watering & curing for 4 weeks including cost & conveyance, royalties & taxes of all materials & labour required for the work etc complete with all T & P in all respect but excluding cost & conveyance of M.S rods & binding wires & tying the grills & placing in proper position.
Supplying, straightening, cutting, bending, placing in position and binding reinforcement steel work in RCC/reinforced brick works as per drawing and specification including preparation of respective bar bending schedule and binding (Binding wire to be used as per the IS code) etc. all complete as per direction of Engineer-In-charge. Cold Twisted bars, Thermo-Mechanically-treated bars.
12mm thick cement plaster (1:6) over brick work including cement punning and bitumen painting over top of wall
6 mm thick cement plaster (1 : 4) finished smooth
With Materials: (for Plaster surface) Out side-With water bound cement primer
Wall painting 2 coat with Weather Coat paint
Providing and installing M20 threaded rod (Grade 8.8) with nut & washer including cutting, cleaning, and preparation.Chemical Anchor Resin (Pure Epoxy / Hybrid Epoxy) for M20 anchor, including approved cartridge, static mixer, and wastage.Drilling of 24–26 mm diameter hole to required embedment depth (150–250 mm) with rotary hammer drill including alignment, marking & setting out.Hole cleaning using blow–brush–blow method, with nylon wire brush, oil-free compressor, and vacuum (if overhead).Installation of chemical anchor: injecting resin, inserting rods, alignment, support & curing as per manufacturer instructions.Consumables & Tool Charges – drill bits wear, mixer nozzles, masking tape, cleaning brush, safety gear.(NON SOR)
PAVEMENT & PATH WAY Earthwork in excavation of foundation trenches in All kinds of soil including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site with all leads and lifts, including shoring, shuttering and dewatering (if required) with cost of labour, hire & running charges of water pumps sundries & T&P required for the work complete as directed by the Engineer-in-charge.
Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. In depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge. (Measurement will be taken on finished compacted section only).
Providing and lying plain cement concrete of proportion (1:3:6) in foundation and floors using Portland slag cement (PSC) with 40 mm. Size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm thick in each layer including cost, conveyance, loading, unloading, royalties and taxes all materials and cost all labours, sundries, T & P required for the work including shoring, shuttering and dewatering if required including hire & running charges of water pump complete as per the instruction of the Engineer-in-Charge.
Providing and laying at near ground level factory made kerb stone of M20 graded cement concrete in position to the required line, level and curveture, jointed with cement mortar 1:3 including making joints with or with out groove( thickness of joints except at sharp curve shall not to more than 5mm) including making drainage poening wherever required complete etc. as per direction of Engineer-in-charge. (precast C.C kerb stone shall be approved by Engineer-in-charge)
Proving & laying of concrete paver block (60mm ) thk of different size M20 grade of concrete over 50mm thk compacted sand layer including of cost,conveyance & royality of all material.
Providing & Painting with synthetic enamel paint of approved brand and manufacture to give an even shade as per the instruction of Engineer-In-Charge at all floors and all heights including all material & labour complete.
HARDSCAPE & BUILDING BLOCKS Earthwork in excavation of foundation trenches in All kinds of soil including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site with all leads and lifts, including shoring, shuttering and dewatering (if required) with cost of labour, hire & running charges of water pumps sundries & T&P required for the work complete as directed by the Engineer-in-charge.
Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. In depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge. (Measurement will be taken on finished compacted section only).
Providing and lying plain cement concrete of proportion (1:3:6) in foundation and floors using Portland slag cement (PSC) with 40 mm. Size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm thick in each layer including cost, conveyance, loading, unloading, royalties and taxes all materials and cost all labours, sundries, T & P required for the work including shoring, shuttering and dewatering if required including hire & running charges of water pump complete as per the instruction of the Engineer-in-Charge.
First class Fly ash Brick masonry using bricks of size 25cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per. Sqr. Cm. in cement mortar of mix( 1:6) with ordinary Portland slag cement(PSC) and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Super stracture including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-In-Charge. at all floors and all heights..(sub strc)
First class Fly ash Brick masonry using bricks of size 25cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per. Sqr. Cm. in cement mortar of mix( 1:6) with ordinary Portland slag cement(PSC) and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Super stracture including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-In-Charge. at all floors and all heights..
Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. But excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. at all floors and all heights.
PLINTHBEAM
COLUMN
ROOF BEAM
Supplying, straightening, cutting, bending, placing in position and binding reinforcement steel work in RCC/reinforced brick works as per drawing and specification including preparation of respective bar bending schedule and binding (Binding wire to be used as per the IS code) etc. all complete as per direction of Engineer-In-charge. Cold Twisted bars, Thermo-Mechanically-treated bars.
12mm cement plaster on external RCC/brick surfaces in cement plaster 1:6 (1 cement : 6 coarse sand) including necessary scaffolding, curing etc. all complete at all floors and all heights. (25 % taken except boundry wall)
16mm cement plaster on internal smooth side of RCC/brick surfaces with cement mortar of mix 1:6 (1 cement : 6 fine sand) including necessary scaffolding, curing etc. all complete at all floors and all heights. (25 % taken except boundry wall)
6 mm cement plaster on RCC surfaces at ceiling/slab soffit and other locations with cement mortar of mix 1:4 (1 cement : 4 fine sand) including necessary scaffolding, curing etc. all complete at all floors and all heights.
Providing and laying Vitrified floor tiles 600x600 mm (thickness to be specified by the manufacturer) 1st quality conforming to IS: 15622 of NITCO, SOMANY, ASIAN, KAJARIA or equivalent approved make, colours & shades, except white, ivory, grey, fume red brown, laid on 20 mm thick cement mortar 1:4 (1cement: 4coarse sand ) including pointing the joints with white cement and matching pigments, etc. complete as per direction of EIC at all floors and all heights.
Providing and laying Vitrified skirting tiles 600x600 mm (thickness to be specified by the manufacturer) 1st quality conforming to IS: 15622 of NITCO, SOMANY, ASIAN, KAJARIA or equivalent approved make, colours & shades, except white, ivory, grey, fume red brown, laid on 12 mm thick cement mortar 1:3 (1cement: 4coarse sand ) including pointing the joints with white cement and matching pigments, etc. complete as per direction of EIC at all floors and all heights.
Providing and laying ceramic floor tiles 600x600 mm (thickness to be specified by the manufacturer) 1st quality conforming to IS: 15622 of NITCO, SOMANY, ASIAN, KAJARIA or equivalent approved make, colours & shades, except white, ivory, grey, fume red brown, laid on 20 mm thick cement mortar 1:4 (1cement: 4coarse sand ) including pointing the joints with white cement and matching pigments, etc. complete as per direction of EIC at all floors and all heights.
Supplying, fitting and fixing of Antiskid Ceramic wall Tiles in flooring using special plain / printed series Ceramic Floor Tile of premium grade ( having minimum thickness 7 mm to 8 mm & size 400 mm x400 mm, confirming to I.S 13755 of approved quality and shade in floors, treads on steps and landings on 25 m.m thick bed of cement mortar of mix (1:1) laid in proper slope and gradient with screened & washed sharp river sand for mortar and fixing with neat white cement slurry,grouting the joints with neat white cement slurry mixed with required quantities of pigments (Tiles are to be immersed in the water for required time before use) of approved make to match the shades of the Ceramic Floor Tiles if required including cost, conveyance, loading, unloading, stacking, royalties , all taxes,rubbing, cost of all Labour, Labour cess ,Sundries, T&P required for the work , Watering , Curing for required days , cleaning the flooring space manually etc. complete in all respect as directed by the Engineer-in-charge. (A/R 2006, Pg-89, item no-16)
Providing and fixing ALLUMINIUM work in frames at any locations including doors, windows, cupboard, clerestory and other frames fixing in position including cost of hinges, M.S. flat (30mm x 6mm) hold fasts lugs or dash fasteners of required dia and length as per drawing / specification, at all floors and all heights.
Providing ,fitting & fixing aluminium door with anodized allluminium door section of 9202 as vertical member ,9201 as top member & 9200 as bottom & middle member with frame section no. 9221 and tapper clip no. 4660 and the frame to be completed by means of joining angle No. 1855 including cost of labour, T & P hire charges of drilling machine, labour charges etc. complete .
Supplying, fitting and fixing of two/Three track UPVC sliding window of approved make with 6mm thick glass of approved quality complete with frame. shutters and all Fitting and fixtures etc. complete as per direction of Engineer-in-charge at all floors and all heights.
Providing & fixing of Fixed vetilators of approved make to be fabricated from roll formed sections made of pre-painted steel (base steel as per IS-513 of 0.6mm. Thick D quilty, galvanized as per IS-277 with Zinc of 120Gm/Sqm) with paint specification being with primer of 5-7 microns and finished paint with plyster paint (black /pearl white/Choclate Brown ) of 12-16 microns along with alkyd backer at the back of 5-7 micron and the size of outer frame being of 46x52mm and with all vetrical & horizontal mullions ar of 46x70mm & fixed beading are of 18x25mm.Accessories /gasket are to be
Providing and fixing M.S grill/Gate of required patterns for windows/verandahs etc. with M.S flats, square or round bars etc. including applying a coat of approved steel primer and two or more coats of synthetic enamel paint of approved make & shade, all complete as per drawing & specification. (All steel sections contractor's own supply).
Providing & Applying priming coat with Cement primer of approved brand and manufacture on plaster surface as per the instruction of Engineer-In-Charge at all elevations including all material & labour complete. (Internal Surface)
Providing & Applying priming coat with Cement primer of approved brand and manufacture on plaster surface as per the instruction of Engineer-In-Charge at all elevations including all material & labour complete. (External Surface)
Providing and applying to outside walls with two or more coats of Anti-Fungal Weather coat water proofing paint including scaffolding and cleaning the surface before application of approved colour and manufacture as per specification, instruction of Engineer-In-Charge at all elevations including all material labour complete. (External Surface)
Providing and applying white cement based putty of average thickness 1 mm of approved brand and manufacturer, over the plastered wall surfaces to prepare the surface even and smooth as per the instruction of Engineer-In-Charge at all elevations including all material & labour complete. (Internal Surface)
Providing & painting two coats of Plastic emulsion paint with 1st quality of approved brand and manufacturer to give an even shade as per the instruction of Engineer-In-Charge at all elevations including all material & labour complete. (Internal Surface)
Providing & Painting with synthetic enamel paint of approved brand and manufacture to give an even shade as per the instruction of Engineer-In-Charge at all floors and all heights including all material & labour complete.
Texture paint Providing and applying two coats unitile's Royal/Rivera make in approved shade on a smooth cement sand plaster. The composition of the texture paint should consist of Acrylic Copolymer Resigns combined with Quartz, Silica,mineral aggregates, synthetic inorganic pigments, bactericide, fungicides and various other additives,giving the product water repellant properties. The first coat to be applied by brush or wool roller as a base coat, diluted with sufficient water and the final coat applied undiluted with trowel and then finished with acrylic trowel to obtain the specified grooves.The thickness of both coats dhould be 1.0 to 1.5 mm. The water repellency of the product is 86gm/m2 as per test method IS: 5410-1969.
Proving fitting and fixing 2.5cm. thick grading concrete (1:2:2) on roof slab with 6mm. Size on new work crusher broken Granite chips
Fitting & fixing G.C.I. Sheet in roof drilling hole in wind ties including fixing of ridges valleys wind ties including cost of materials ,labour for fixing etc all complete
Provision and fitting fixing of pvc swerege pive 15mm
Provision and fitting fixing of 15mm dia c.p.short body bib cock
Provision and fitting fixing of 15mm dia c.p.long body bib cock
Provision and fitting fixing of C.P.soap holder/disc.
Provision and fitting fixing of Porcelain Counter Top Basin Oval Shape (450x400)
Provision and fitting fixing of BOTTLE TRAP WITH WASTE COUPLING
Provision and fitting fixing of 15mm dia brass / GM ball valve
Provision and fitting fixing of CP WASTE (32mm -5" long)
Provision and fitting fixing of CP FLANGE
Provision and fitting fixing of 15mmx450mm PVC connection pipe
Provision and fitting fixing of 40mmx1150mm long PVC corrugated waste pipe
Provision and fitting fixing of Sintex 1000 Litres Triple Layered Storage Water Tank White [CCWS0100-01-TLW] - Specifications Water Tank Capacity 1000 Litres Diameter 43.3 Inch Brand Name Sintex,Features Brighter, Stronger, Virgin plastic, FDA approved, Triple-layer body, 100% UV stabilized, Rustproof, Algae formation protection, No maintenance, Cooler, Multilayer, Attractive looking Length 48.2 Inch Color White
DRAINAGE WORK Earthwork in excavation of foundation trenches in All kinds of soil including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site with all leads and lifts, including shoring, shuttering and dewatering (if required) with cost of labour, hire & running charges of water pumps sundries & T&P required for the work complete as directed by the Engineer-in-charge. {Rate of excavation=(Ordinary soil+Hard soil+Stony earth)/3}
Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. In depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge. (Measurement will be taken on finished compacted section only).
Providing and lying plain cement concrete of proportion (1:3:6) in foundation and floors using Portland slag cement (PSC) with 40 mm. Size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm thick in each layer including cost, conveyance, loading, unloading, royalties and taxes all materials and cost all labours, sundries, T & P required for the work including shoring, shuttering and dewatering if required including hire & running charges of water pump complete as per the instruction of the Engineer-in-Charge.
Providing, lifting, hoisting and laying Reinforced cement concrete of M-20 grade as per approved designs and drawings having a minimum compressive strength (in work test) 20 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. But excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position.
Supplying all materials, labour, T&P and providing M.S reinforcement for R.C.C work including cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer-In-Charge.
Supplying all materials, labour, T&P and providing sauser for R.C.C work including cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer-In-Charge.
Removing Old Slab from Drain Wall and refixing the same after completion of work etc.
Providing and fixing of ms check gate / sluice gate (lump sump)
Providing and fixing Steel work welded in built up section / framed (including M.S. angle, plate, sq.bar, flat, m.s.tubular section, Heavy type hinges) work incuding cutting, hoisting,fixing in position and applying apriming coat of approved steel primer, two or more coats of synthetic enamel paint with approved make and brand in grating, frames, guard bar, ladder, railings for balconies and straircase, brackets, gates and similar works as per direction of Engineer-In-Charge. (All structural steel contractor's own supply).
LAWN AREA DEVELOPMENT Trenching in ordinary soil up to a depth of 30 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and 1 making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water `
Supplying and stacking of good earth at site including royalty and carriage upto 5 km complete. Spreading of good earth in required thickness as per direction of officer-in-charge.
Lifting & Spreading of soil uniformly over the surface area as per landscape design/advice of the site engineer including cost of all materials, labour, labour cess, royalties, conveyance, applicable taxes and T&P etc.complete in all respect as directed by Engineer-in-Charge.
Supplying and stacking at site dump manure from approved source, including carriage up to 1 km complete (manure measured in stacks will be reduced by 8% for payment)
Screened through sieve of I.S. designation 16mm
Rough dressing the trenched ground including breaking clods
Uprooting weeds from the trenched area after 10 to 15 days of its flooding with water including disposal of uprooted vegetation.
Fine dressing of the ground.
Trees Plant 10' to 12' Height Packet size (21"x21') Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20%: 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)
Plantation of Trees, Shrubs, and Hedge at site i/c watering and removals of unserviceable material’s as per direction of officer in charge (excluding cast of plant & water)
Trees Plant 10' to 12' Height Packet size (21"x21')
HEDGE PLANT/ FLOWERING GARDEN 7" to 8" height Packet Size (6" to 1') Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20%: 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)
Plantation of Trees, Shrubs, and Hedge at site i/c watering and removals of unserviceable material’s as per direction of officer in charge (excluding cast of plant & water)
Hedge Plant /FLOWERING GARDEN 7" to 8" height Packet Size (6" to 1')
Potted Plants Supply of potted plants : (24") 1.5x2' height . Supply of good quality foliage/flowering plants of different species in pots with succer for disply in office premises with luxuriant and healthy foliage / flowers free from disease, pests and physical diorder and mechanical damage as per the instruction of engineer in charge including cost of transportation,men,matrial all complete .
NON SOR Providing and fixing in position self standing FRP Frog/ Animal shape dust Bin of approved design and make of minimum height of 0.85 meter dia 0.60 meter (capacity min 80 ltrs) designed for accommodating dry as well as wet kind of trash in the garden made out of in pure polyester Fiberglass Reinforced Plastic (UV resistant finishing) of 2mm thk with matt finish .
Providing and fixing in position 3 seaters ms designer Bench of approved design all complete.
Providing and fixing in position roofing tile like Material Clay Pattern Flat tile Surface Treatment Color Coated Area Of Application Residential & Commercial Effective Cover Width 250 mm Weight of Tile 3.5 kg Thickness Of Tile 5-15 mm Length 475 mm Overall Width 285 mm
Supplying all materials , labour T&P and setting of boring equipments including Errection of suitable staging for Installation of required size of required T/W , dismentalling and removing the same after completion of the said work including transportaion of the boring equipments cleaning and levelling the site properly as per requirement excavation of the mud pit, channel etc. in all respect as per the direction of the Engineering in-Charge.
Supplying all labour and T&P for transporting the Mud pump,Generator, boring pipes , PVC Pipe,Top Casing & Grouting pipes and necessary fittings, well screens, cement , Cow dung. Bentonite powder and gravell etc. from store to work site including loading and unloading etc. complete in all respect as per direction of the Engineering in-Charge.
Supplying all labour and T&P for Drilling the Pilot bore not less than 102mm dia without casing pipe in all kinds of soil and rocks for the following depth including the supplying of necessary boring pipe and cutting equipments extra sockets ( whenever required ) etc. and withdrwing the boring pipes washing and keeping the the bore clear and logging if required complete in all respect as per direction of the Engineering in-Charge.a) Drilling 100mm dia Bore (o mtr to 60 mtr & beyond 60 mtr)
Supplying all labour and T&P forLowering the 300mm dia Casing pipe fitting and fixing in possition and removing the same after completion of work etc. Complete in all respect as per direction of the Engineering in-Charge.(29385)
Supplying all labour and T&P for reaming the Pilot bore to the following sizes and depths without casing pipes including with drawing the boring pipes , washing the bore by means to pipe cylinder etc. Complete in all respect as per direction of the Engineering in-Charge.i) Reaming 100mm to 150 mm dia
Reaming 150mm dia to 200mm dia ( from 0.00mtr to 360.00mtrs depth)
Reaming 200mm dia to 250mm dia ( from 0.00mtr to 360.00mtrs depth)
Supplying all labour , T&P and jointing materials and lowering the PVC Casing Pipe ,well screens, Cutter plug fitted and fixed in proper possition and washing and cleaning the bore as per P.H. specification and direction of Engineer in-Charge.(a) Lowering 150mm dia PVC Casing Pipe (Casing Pipe Supplied by Department from CMC Store)
Collecting supplying and stacking Washed Gravel or River singles of required sizes at work site measuring(1.50mx1.50mx0.50m) as one cum including all cost of conveyance ,royality,taxes etc. Complete.
Supplying all labour and T&P for packing the bore with Washed Gravel or River singles of required sizes ,around well screen and pipes as per specification and direction of Engineer in-Charge.
Supplying all labour, tools and plant and grouting with cement slurry for sanitary sealing in the bore around the upper most 3 metres of 150 mm dia PVC casing pipe properly as per the direction of the Engineer-in-Charge.(29375)
Supplying all labour, tools and plant and materials for cleaning and developing the tubewell with compressor continuously washed till clean and adequate discharge is obtained from the tube well including supply and use of necessary equipments and labour complete in all respect as per the direction of the Engineer-in-Charge.(29447)
i)150mm dia Conical Plug
ii)150x300 mm PVC Short Piece
iii)Bentonite Power
iv)150mm MS Top Cover
Supplying and fixing of 40mm S.D PVC Pipe etc. complete with transportation ,T&P and labour charges et complete as per direction of the Engineering in-Charge.
Supplying all materials ,labour and T&P for fitting and fixing of the following acessories as per specification and direction of the Engineer in charge.
ii) Tochain Clip
iii) Steel Nipple
iv) Steel Nut & Bolt
v) 32mm/40mm M.S Clamp
vi) 32mm/40mm dia GI Elbow
vii) 32mm/40mm dia GI Short Piece
viii) Water proof Rubber,Black Tape etc
Supplying all materials ,labour ,T&P and for slot cutting making strainer including testing as per specification complete.(150mm PVC Pipe Supplied by CMC Departmental Store)
Supplying installation and commissioning of 1.5 / 2.0 HP Single phase 230 Volt 50 Hz Submersible Pump Set (Max Head -65mtr ,Min Head -39mtrs) Make-Texmo suitable for 40mm/50mm dia out let etc complete with transportation ,T&P and labour charges as per direction of the Engineering in-Charge.
Supplying and laying of 2.5s Sqmm PVC insulated ,PVC sheathed twin core Multistrand water proof copper flat cable (Black) etc complete with all cost transportation ,T&P charges etc as per direction of the Engineering in-Charge.
Filling in foundation and plinth with excavated materials (All kinds soil)
Supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost,conveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for the work complete as per the direction of the Engineer-in-charge.
Rough stone dry packing in approns and revetments with hard granite stones ( 30cm and above size)
Providing & laying cement concrete of prop. (1:3:6) in foundation bed and floors using 40mm nominal size down graded, screened, washed hard black crusher broken granite metal of approved quality & from approved quarry including laying in the layers not exceeding 150 mm thick, hoisting, lowering, laying, watering and curing etc. complete to the required levels including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for the work complete and as per direction of Engineer-in-charge.
Supplying all labour,materials,T&P for Cement Concrete M-20 for reinforced cement concrete works in using 12mm to 20 mm size hard granite Crusher Broken chips including cost of materials,royalty & conveyance charges with watering,curing all complete as per direction of Engineer-in-charge.
Rigid Smooth Centering & Shuttering
Straightening, cutting, bending and binding, welding and jointing (if necessary ) coiled/ bent up MS Rods /Tor Steel/deformed rods etc. including hoisting, placing in position, tying the grills binding with 18 to 20 gauge binding wire required for R.C.C work including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete (weight of binding wire will not be considered) as directed by Engineer-in-charge. (Payment will be made on actual weight of M.S rods or Tor steel linear measurements of rod for finished item of works. 5% wastage and lap length are included in the finished rate).
Fixing Kota Stone Above 0.10sqm. ( 16mm. Thick) in floors or steps & landing on 25mm. thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing & polishing complete including cost of Kota.
Providing 6mm thick C.P.(1:4) on Plaster surface including watering curring etc. Complete.
Add Maintanance @ 10% on TOTAL
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.84 MB
BOQ_576111.xls
BOQ • 0.69 MB
Download all tender documents and submit your bid