Loading…
Loading…
Tender Value
Refer Docs
Closing Date
23 Aug 2021, 3:00 pmClosed
GM ( M AND C)
HALDIA REFINERY
DESIGN, ENGINEERING, PROCUREMENT, SUPPLY, MANUFACTURING, INSPECTION AND EXPEDITING, THIRD PARTY INSPECTION, STATUTORY CLEARANCES, TRANSPORTATION OF ALL EQUIPMENT/ MATERIALS TO THE WORK SITE, MATERIALS MANAGEMENT, CONSTRUCTION, ASSEMBLY, INSTALLATION,
2021_HR_135488_1
HELKK21030
Open Tender
Lump Sum TurnKey
Tender cum Auction
180 days
HALDIA REFINERY
Please refer Tender documents.
5 documents required · 5 mandatory
Exempted
HALDIA REFINERY
1 Nov 2021
3 Jun 2021
25 Aug 2021
3 Jun 2021
23 Aug 2021
3 Jun 2021
10 Jun 2021
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .