Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.6 LAccepted-AOC | L1 | Accepted-AOC ok | |
| 2 | L3₹38.6 L+₹1.9 L (5.26%)Rejected-Finance 137 3 STREET NO 4 RAJINDER NAGAR DEHRADUN UK 248001 | DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | L3 | Rejected-Finance Other than lowester tenderer | |
| 3 | L3₹40.0 L+₹3.3 L (9.07%)Rejected-Finance 205 PARSHAV VIHAR PLOT NO 50 IP EXTN PARPARGANJ DELHI 110092 | EAST | DELHI | 110092 | L3 | Rejected-Finance Other than lowester tenderer | |
| 4 | L4₹40.5 L+₹3.9 L (10.5%)Rejected-Finance N A | NEW DELHI | DELHI | 110001 | L4 | Rejected-Finance Other than lowester tenderer | |
| 5 | L5₹41.8 L+₹5.2 L (14.1%)Rejected-Finance | L5 | Rejected-Finance Other than lowester tenderer |
Tender Value
₹5.0 L
EMD Value
₹99,400
Closing Date
16 May 2020, 6:00 pmClosed
GE E/M BASE HOSPITAL DELHI CANTT
GE E/M BASE HOSPITAL DELHI CANTT
MANNING AND OPERATION OF DG SET, AC PLANT, ELECTRIC SUPPLY AND WATER SUPPLY INSTALLATION AT CGDA AND CENTRAD COMPLEX UNDER GE E/M BASE HOSPITAL DELHI CANTT-10
2020_MES_340024_1
GE/BH-08/2020-21
Open Tender
Electrical and Maintenance Works
Works
334 days
GE E/M BASE HOSPITAL DELHI CANTT
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE E/M BASE HOSPITAL DELHI CANTT
₹99,400
Yes
12 Jun 2020
21 Apr 2020
18 May 2020
21 Apr 2020
16 May 2020
5 May 2020
Amount
Outsourcing of resources for management & operation of DG Set installations of Diesel Engine driven generating sets with LT Panels, AMF Panels, Three phase Generator set - 01 Nos (250 KVA) at CENTRAD including the following installed equipments/Accessories complete all as specified and as directed:- (i) Submersible pump sets of capacity 7.5 HP to 20 HP - 03 Sets. (ii) On line decrine dosing pumping set - 01 Nos. (iii) Pressure filter - 02 Nos. Note:- (i) One Operator per shift for three shifts, round the clock (Total Three Operators per day) including Saturday, Sundays & Holidays shall monitor and operate all the above mentioned equipments/plants. (ii) Contractor/ his Operator shall be responsible to operate the all above plants / machinery when ever required as asked / guided by AGE E/M /JE E/M).
Outsourcing of resources for management & operation of Electrical supply installations and Main receiving station at CENTRAD Power House and main receiving stations including operating of HT / LT panels and AHU panels in complete area and as well as operating of street panels as per scheduled timings complete for continuous operation with one Electrician per shift for three shifts, round the clock (Total Three Operators per day) including Saturday, Sundays & Holidays including the following installed equipments/Accessories complete all as specified and as directed:- Note:- Contractor / his Operator shall be responsible to operate the all above plants / machinery when ever required and as asked / directed by AGE / JE during shift.
(i) 630 Amp 3 way HT, 11 KV VCB - 01 Nos. (ii) Outdoor Type 500 KVA Transformer - 01 Nos (iii) ACB Panels - 02 Nos, LT panel - 06 Nos. (iv) AC Plant main panel and all AHU panels.
Outsourcing of resources for management and operation of Central AC Plant consisting of three Nos compressor, Condenser fans, cooling towers for continuous operation at CENTRAD with One Refrigeration Mechanic per shift for two shifts of 16 hours (Total Two Operators per day) including Saturday but excluding Sundays & Holidays, including the following installed equipments/ Accessories complete all as specified and as directed:- (Note:- Contractor/ his Operator shall responsible to operate the all above plants / machinery when ever required as asked / guided by AGE E/M /JE E/M).
(a) Central AC plants 3 x 15 TR. (b) Cooling tower - 3 Nos , 20 TR. (c) Condenser water pump - Cap 15 HP x 3 Nos. (d) Primary and Secondary water pump - Cap 7.5 HP x 6 Nos. (f) AHU - 01 Nos. (g) AHU Motors - 5 HP to 20 HP - 02 Nos.
Outsourcing of resources for management and operation of DG Set installations of Diesel Engine driven generating sets with LT Panels, AMF Panels, Three phase Generator set 03 Nos (750 KVA, 250 KVA & 160 KVA), Water Supply Installation, Sewage treatment Plant at CGDA, for continuous operation with one Operator per shift for three shifts, round the clock (Total Three Operators per day) including Saturday, Sundays & Holidays including the following installed equipments/ Accessories complete all as specified and as directed: - Note:- Contractor / his Operator shall be responsible to operate the all above plants / machinery when ever required and as asked / directed by AGE / JE during shift.
(a) Three phase Generator set 03 Nos (750 KVA, 250 KVA, 160 KVA) including operating of pumps, chlorination plants, valves as per scheduled supply timings complete including cleaning of pump house surroundings, roofs, valve pits, earth pits etc complete. (b) Submersible pump sets of cap 1 HP to 20 HP - 15 Sets. (c) Vertical Pump 3 Phase - 08 Nos, Air Compressor, Sewage pump.
Outsourcing of resources for management and operation of Electrical supply installations and Main receiving station at CGDA Power House and main receiving stations including operating of HT / LT panels and AHU panels in complete area and as well as operating of street panels as per scheduled timings complete for continuous operation with one Electrician per shift for three shifts, round the clock (Total Three Operators per day) including Saturday, Sundays & Holidays including the following installed equipments/ Accessories complete all as specified and as directed:- Note:- Contractor / his Operator shall be responsible to operate the all above plants / machinery when ever required and as asked / directed by AGE / JE during shift.
(i) 630 Amp 3 way HT, 11 KV VCB - 02 Nos. (ii) Outdoor Type 1000 KVA Transformer - 01 Nos, ACB Panels - 13 Nos, APFC panel - 02 Nos. (iii) AC Plant main panel and all AHU panels.
Outsourcing of resources for management and operation of Central AC Plant consisting of three Nos compressor, Condenser fans, cooling towers for continuous operation at CGDA with one Operator & One Refrigeration Mechanic per shift for two shifts of 16 hours (Total Two Operators & two Refrigeration Mechanic per day) including Saturday but excluding Sundays & Holidays, including the following installed equipments/ Accessories complete all as specified and as directed : - (Note:- Contractor/ his operator shall responsible to operate the all above plants / machinery when ever required as asked / guided by AGE E/M /JE E/M).
(a) Central AC plants 3 x 180 TR. (b) Cooling tower - 3 Nos, 225 TR. (c) Condenser water pump - Cap 20 HP x 3 Nos. (d) Primary and Secondary water pump - Cap 7.5 HP x 6 Nos. (e) Hot Water Generator 250 KW - 01 Nos. (f) Hot water Generator Motor Cap - 5 HP - 02 Nos. (g) VFD Panel - 01 No. (f) AHU - 13 Nos. (g) AHU Motors - 5 HP to 20 HP - 17 Nos. (h) Duct in line Type Exhaust Fan - 18 Nos.
Notes For item Nos 1 to 6 here-in-before:- (i) The estimated cost of the work in respect of BOQ Sir item Nos 1 to 6 (as based on minimum wages rates issued vide central/state) is Rs 48,40,000/-. If the quoted amount is found less than the estimated cost of Sir item Nos 1 to 6 of BOQ and tender of lowest bidder is considered for acceptance, then the lowest bidder shall have to deposit FDR in favour of Accepting officer for the difference in estimated cost and Accepted amount in respect of BOQ Sir item Nos 1 to 6 within 30 days from date of acceptance. In case the said FDR is not submitted within 30 days the amount in question shall be recovered from contractor’s first RAR/Final bill whichever is earlier. However the FDR/recovered amount shall be released to the contractor after satisfactory completion of work. Attention is further invited added that when the amount of said recovery mentioned herein above is less than the amount of performance security as indicated under Clause 02 on page 04 of CA and Clause 12 on page 11& 12 of CA, no FDR is required to be submitted for quoting less rate against BOQ Srl Item Nos 1 to 6. However if the amount of performance security is less than the FDR to be submitted for less quoting rate, the difference of performance security amount and FDR amount(for less quoting rates) shall be deposited by the lowest bidder (whose tender is accepted) in the form of FDR for difference amount over and above performance security within 30 days from the date of Acceptance. (ii) One Operator/ Technician shall perform only one shift of 08 hours in a day. If the same Operator/ Technician found in other shift, a recovery of Rs 500/- per day shall be recovered from the contractor's dues.
(iii) Operator/Technician shall be ITI qualified having minimum three years of experience in relevant trade. Contractor shall submit the nominal roll and qualification of operator/technician within 15 days of acceptance of tender. After that penalty for a sum of Rs 500/- per shift per installation shall be recovered from the contractor's dues. (iv) Contractor shall ensure attendance of all Operator/ Technician/ Electrician in shift wise. If any operator/technician/Electrician found absent from duty a sum of Rs 1000/- per shift per person shall be recovered from the contractor's dues. Any damage of loss on this account shall bear by the contractor. (v) All operator/technician shall wear proper uniform, failing which a recovery of Rs 200/- per shift per person shall be recovered from the contractor's dues. (vi) The payment of contractor's employee shall be made through nationalized bank account of individual and the proof of transaction and the contractor shall submit the same with bank account pass book of individual within 15 days of acceptance otherwise a recovery shall be made a sum of Rs 200/- per shift per employee from the contractor's dues.
(vii) The staff deployed for manning/operation of the installations shall not leave the installation under any circumstances before handing over the plant to Next shift duty otherwise penalty @ Rs. 500/- per shift per day shall be recovered from the contractor's dues. (ix) In case of any break down, any additional manpower required shall be arranged by the contractor without any extra cost to the Govt/Deptt. (x) T&P required for the maintenance and operation shall be arranged by the contractor without any extra cost to the Govt/Deptt. (xi) Cleanliness of the plant room, forced ventilation, AHUs and cooling tower shall be carried out by the contractor as directed by Engr-in-Charge without any extra cost to the Govt/Deptt. (xii) Daily log sheet and maintenance register shall be maintained and signed by each shift tradesman. (xiii) Contractor will submit the payment proof i.e. passbook of bank account/Bank statement at the time of submission of RAR.
M/S ANIL KUMAR
Saini Enterprises
M/S Rohit Enterprises
M/s Saravat and Company
MAA SANTOSHI ENTERPRISES
KRISHANA ELECTRIC WORKS
M/s Durga Traders
ASHUTOSH BUILDERS
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .