| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.6 CrAccepted-AOC | ₹3.6 Cr | 1 | Accepted-AOC 1 |
| 2 | 2₹3.6 Cr+₹52,157 (0.15%)Rejected-Finance | ₹3.6 Cr+₹52,157 (0.15%) | 2 | Rejected-Finance 2 |
| 3 | 3₹3.8 Cr+₹22.4 L (6.24%)Rejected-Finance | ₹3.8 Cr+₹22.4 L (6.24%) | 3 | Rejected-Finance 3 |
| 4 | 4₹3.9 Cr+₹30.0 L (8.36%)Rejected-Finance VILLAGE PATHRA POST BADGO THANA KHORABAR DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | ₹3.9 Cr+₹30.0 L (8.36%) | 4 | Rejected-Finance 4 |
| 5 | 5₹3.9 Cr+₹34.2 L (9.52%)Rejected-Finance | ₹3.9 Cr+₹34.2 L (9.52%) | 5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | M/S AJIT CONSTRUCTION AND ORDER SUPPLIER L4 | M/S ABHINAV ENTERPRISES L2 | M/S NAV DURGA CONSTRUCTION COMPANY L3 | RANJEET SINGH L7 | M/S AGRAWAL ASSOCIATE L6 | M/S JITENDRA SINGH L9 | R.K.TRADERS & CONSTRUCTION PRIVATE LIMITED L11 | M/s MAA SHARDA TRADERS L10 | M/S Paliwal Brothers L1 | M/S NARAIN TRADERS L8 | Kailash Singh L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. as per MORT&H Spe. 201 Sr. no 2.03 (Including Labour Cess but GST will paid extra as applicable) | 2 | Hect | 8,000 ₹16,000 | 1,00,000 ₹2,00,000 | 1,00,000 ₹2,00,000 | 12,323 ₹24,646 | 5,000 ₹10,000 Lowest | 22,000 ₹44,000 | 1,00,000 ₹2,00,000 | 1,50,000 ₹3,00,000 | 15,000 ₹30,000 | 1,37,500 ₹2,75,000 | 30,000 ₹60,000 |
| 2.00 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m As per MoRT&H Specification & Clause . No.301, 3.06 complete in all respect as per direction of Engineer in Charge (Including Labour Cess but GST will paid extra as applicable) | 166 | Cum. | 33 ₹5,478 | 30 ₹4,980 | 50 ₹8,300 | 40 ₹6,640 | 40 ₹6,640 | 71 ₹11,786 | 50 ₹8,300 | 51 ₹8,466 | 40 ₹6,640 | 42.14 ₹6,995.24 | 25 ₹4,150 Lowest |
| 3.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.As per MoRT&H Specification & Clause . No.305, 3.17 complete in all respect as per direction of Engineer in Charge (Including Labour Cess but GST will paid extra as applicable) | 166 | Cum. | 33 ₹5,478 | 30 ₹4,980 Lowest | 50 ₹8,300 | 46 ₹7,636 | 80 ₹13,280 | 68 ₹11,288 | 50 ₹8,300 | 54 ₹8,964 | 50 ₹8,300 | 45 ₹7,470 | 30 ₹4,980 Lowest |
| 4.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. As per MoRT&H Specification & Clause . No.305, 3.16 complete in all respect as per direction of Engineer in Charge (Including Labour Cess but GST will paid extra as applicable) | 28,400 | Cum | 80 ₹22,72,000 | 45 ₹12,78,000 Lowest | 50 ₹14,20,000 | 158.55 ₹45,02,820 | 150 ₹42,60,000 | 100 ₹28,40,000 | 110 ₹31,24,000 | 104 ₹29,53,600 | 70 ₹19,88,000 | 86.52 ₹24,57,168 | 50 ₹14,20,000 |
| 5.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.as per MORT&H Specification & Clause No.401, 4.01 complete in all respect as per direction of Engineer in Charge (Including Labour Cess but GST will paid extra as applicable) | 169 | Cum | 3,450 ₹5,83,050 | 3,400 ₹5,74,600 | 3,500 ₹5,91,500 | 3,690 ₹6,23,610 | 3,000 ₹5,07,000 Lowest | 3,500 ₹5,91,500 | 4,400 ₹7,43,600 | 4,200 ₹7,09,800 | 3,100 ₹5,23,900 | 3,500 ₹5,91,500 | 4,000 ₹6,76,000 |
| 6.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.as per MORT&H Specification & Clause No. 406, 4.14. complete in all respect as per direction of Engineer in Charge (Including Labour Cess but GST will paid extra as applicable) | 2,957 | cum | 3,950 ₹1,16,80,150 | 3,500 ₹1,03,49,500 | 3,600 ₹1,06,45,200 | 3,778 ₹1,11,71,546 | 3,300 ₹97,58,100 Lowest | 3,800 ₹1,12,36,600 | 4,900 ₹1,44,89,300 | 4,500 ₹1,33,06,500 | 3,450 ₹1,02,01,650 | 3,500 ₹1,03,49,500 | 4,000 ₹1,18,28,000 |
| 7.00 | Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. As per MORTH Specification & clause No. 502, 5.01 complete in all respect as per direction of Engineer in Charge (Including Labour Cess but GST will paid extra as applicable) | 19,538 | Sqm | 30 ₹5,86,140 | 15 ₹2,93,070 Lowest | 30 ₹5,86,140 | 25.5 ₹4,98,219 | 20 ₹3,90,760 | 22 ₹4,29,836 | 30 ₹5,86,140 | 34 ₹6,64,292 | 30 ₹5,86,140 | 32 ₹6,25,216 | 28 ₹5,47,064 |
| 8.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP 120 TPH using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction As per MORTH Specification & clause No. 505, 5.04 complete in all respect as per direction of Engineer in Charge (Including Labour Cess but GST will paid extra as applicable) | 976 | Cum | 8,200 ₹80,03,200 Lowest | 9,000 ₹87,84,000 | 10,200 ₹99,55,200 | 9,100 ₹88,81,600 | 9,000 ₹87,84,000 | 11,000 ₹1,07,36,000 | 11,500 ₹1,12,24,000 | 11,400 ₹1,11,26,400 | 9,450 ₹92,23,200 | 10,700 ₹1,04,43,200 | 11,500 ₹1,12,24,000 |
| 9.00 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.As per MORTH Specification & clause No. 503, 5.02 complete in all respect as per direction of Engineer in Charge (Including Labour Cess but GST will paid extra as applicable) | 19,538 | Sqm | 9 ₹1,75,842 | 5 ₹97,690 Lowest | 11 ₹2,14,918 | 7.36 ₹1,43,799.68 | 9 ₹1,75,842 | 12 ₹2,34,456 | 10 ₹1,95,380 | 9 ₹1,75,842 | 9 ₹1,75,842 | 9.28 ₹1,81,312.64 | 8 ₹1,56,304 |
| 10.00 | Providing and laying bituminous concrete (Grade-2) with higher capacity batch type hot mix plant 120 TPH using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction. as per MORTH specification & clause No. 507(B), 5.05 complete in all respect as per direction of Engineer in Charge (Including Labour Cess but GST will paid extra as applicable) | 586 | cum | 9,400 ₹55,08,400 Lowest | 9,800 ₹57,42,800 | 11,200 ₹65,63,200 | 10,000 ₹58,60,000 | 10,500 ₹61,53,000 | 12,000 ₹70,32,000 | 12,700 ₹74,42,200 | 11,870 ₹69,55,820 | 9,900 ₹58,01,400 | 11,172 ₹65,46,792 | 10,500 ₹61,53,000 |
Tender Value
₹5.2 Cr
EMD Value
₹10.4 L
Closing Date
16 Dec 2025, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Gorakhpur Circle PWD Gorakhpur
Widening and strengthening of Gulhariya Ramnagar Ashrafpur to Aurangabad to Ekla Village Tera Cota Udhyog Research center With 5 Year Maintenance work LOT No-1 of 1
2025_CEGKP_1096532_1
7386/135C Gorakhpur Circle /2025 dt. 03-11-2025
Open Tender
Civil Works
Item Rate
365 days
Gorakhpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹10.4 L
9 Mar 2026
6 Dec 2025
16 Dec 2025
6 Dec 2025
16 Dec 2025
6 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. as per MORT&H Spe. 201 Sr. no 2.03 (Including Labour Cess but GST will paid extra as applicable) | 2 | Hect | - | - |
| 2 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m As per MoRT&H Specification & Clause . No.301, 3.06 complete in all respect as per direction of Engineer in Charge (Including Labour Cess but GST will paid extra as applicable) | 166 | Cum. | - | - |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.As per MoRT&H Specification & Clause . No.305, 3.17 complete in all respect as per direction of Engineer in Charge (Including Labour Cess but GST will paid extra as applicable) | 166 | Cum. | - | - |
| 4 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. As per MoRT&H Specification & Clause . No.305, 3.16 complete in all respect as per direction of Engineer in Charge (Including Labour Cess but GST will paid extra as applicable) | 28,400 | Cum | - | - |
| 5 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.as per MORT&H Specification & Clause No.401, 4.01 complete in all respect as per direction of Engineer in Charge (Including Labour Cess but GST will paid extra as applicable) | 169 | Cum | - | - |
| 6 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.as per MORT&H Specification & Clause No. 406, 4.14. complete in all respect as per direction of Engineer in Charge (Including Labour Cess but GST will paid extra as applicable) | 2,957 | cum | - | - |
| 7 | Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. As per MORTH Specification & clause No. 502, 5.01 complete in all respect as per direction of Engineer in Charge (Including Labour Cess but GST will paid extra as applicable) | 19,538 | Sqm | - | - |
| 8 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP 120 TPH using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction As per MORTH Specification & clause No. 505, 5.04 complete in all respect as per direction of Engineer in Charge (Including Labour Cess but GST will paid extra as applicable) | 976 | Cum | - | - |
| 9 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.As per MORTH Specification & clause No. 503, 5.02 complete in all respect as per direction of Engineer in Charge (Including Labour Cess but GST will paid extra as applicable) | 19,538 | Sqm | - | - |
| 10 | Providing and laying bituminous concrete (Grade-2) with higher capacity batch type hot mix plant 120 TPH using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction. as per MORTH specification & clause No. 507(B), 5.05 complete in all respect as per direction of Engineer in Charge (Including Labour Cess but GST will paid extra as applicable) | 586 | cum | - | - |
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.79 MB
Tendernotice_2.pdf
PDF • 0.81 MB
Tendernotice_3.pdf
PDF • 0.49 MB
Tendernotice_4.pdf
PDF • 0.06 MB
Addendum_SBD_Lot_1.pdf
Tender Documents • 0.43 MB
BOQ_2018684.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .