Tender Value
₹73,211
Closing Date
11 Apr 2022, 2:00 pmClosed
SE/ES/TTPS
Superintending Engineer-Electrical Systems- Tuticorin Thermal Power Station-Tuticorin
Annual maintenance of 230kV Station Transformer-I,II and Spare Generator Transformer for the year of 2022-2023 at 230kV Indoor Switchyard-I of Unit I,II and III.
2022_EB_227464_1
SE/ES/TTPS/ 05/2022-23
Open Tender
Electrical Works
Works
365 days
TTPS
As per BQR conditions in NIT
6 documents required · 6 mandatory
₹0
Yes
17 Dec 2022
28 Mar 2022
12 Apr 2022
28 Mar 2022
11 Apr 2022
28 Mar 2022
Cleaning and tightness checking of 3Nos HV Bushings and 6Nos LV Bushings in 230kV Station Transformer-I & II including cost of consumables
Cleaning and tightness checking 3 Nos lightning arrestors, 3 Nos Pedestal support insulators and its jumpers connection clamps tightness checking work , earth resistor box and neutral grounding transformer & arresting oil leaks in station transformer-I & II including cost of consumables
Removing jumpers of HV bushings, LV links Neutral bushings, LAs & Assisting MRT testing work and reconnection of all jumpers after MRT testing work and tightness checking of Station Transformer-I & II including cost of consumables
Dismantling jumpers of HV bushing and assisting for MRT testing work and reconnection of jumpers after completion of MRT testing and cleaning of transformer, HV Bushing, LV bushing & Neutral bushing and arresting oil leaks of 230kV Spare Generator Transformer including cost of consumables
Half yearly maintenance of Spare Generator Transformer & Station Transformer-I,II. Cleaning & tightness checking of HV & LV bushing, Las, Pedestal support Insulator of 230kV Station Transformer-I,II and Spare Generator Transformer including arresting of oil leaks & cleaning of Transformer including cost of consumables
Opening the LV side chamber door, releasing the LV terminal, cleaning the terminal and assisting with MRT for Transformer winding Tandelta testing, reconnecting of terminals and assembling the door after completion of MRT testing. (both ST-I,II) including cost of consumables
SARASWATHY ENGINEERING AND CONTRACTORS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .