| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.0 LAdmitted-Finance | ₹68.0 L | L1 | Admitted-Finance |
| 2 | L2₹68.6 L+₹59,125.18 (0.87%)Admitted-Finance | ₹68.6 L+₹59,125.18 (0.87%) | L2 | Admitted-Finance |
| 3 | L3₹70.2 L+₹2.2 L (3.29%)Admitted-Finance N A | FARIDABAD | HARYANA | 121004 | ₹70.2 L+₹2.2 L (3.29%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical BAROJ ROAD SHAKTI NAGAR COLONY DISTRICT BIJNOR | BIJNOR | BIJNOR | UTTAR PRADESH | - | - | Rejected-Technical Due to Not fulfill the Condition of Tender |
| Sl No | Description | Qty | Unit | S R CONTRACTORS L2 | SHEESHPAL SINGH CONTRACTOR L3 | M/S VIPIN KUMAR CONTRACTOR L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation in all type soil i/c lift upto 1.5M And lead up to 30M with back filling and watering ,ramming dressing manual compaction etc. | 555.47 | Cum | 60 ₹33,328.44 | 90 ₹49,992.66 | 55 ₹30,551.07 Lowest |
| 2.00 | Plain Cement concrete (1:3:6) in normal mix with aggregate size 4 to 20 mm. with cost of all material, labour and T&P etc. complete. | 196.43 | Cum | 4,200 ₹8,25,006 Lowest | 4,850 ₹9,52,685.5 | 4,400 ₹8,64,292 |
| 3.00 | Laying C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 4 to 20 mm stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering. | 46 | Cum | 6,000 ₹2,76,000 Lowest | 6,400 ₹2,94,400 | 6,000 ₹2,76,000 Lowest |
| 4.00 | Brick work in C.M. 1:4 Mix cement & coarse sand including cost of all material, labour and T&P etc. complete. | 840.11 | Cum | 5,300 ₹44,52,604.2 | 4,900 ₹41,16,558.6 Lowest | 5,000 ₹42,00,570 |
| 5.00 | Cement pointing in 1:2 cement mortar including cost of all material, labour and T&P etc. complete. | 2,787.6 | Sqm | 70 ₹1,95,132 Lowest | 100 ₹2,78,760 | 110 ₹3,06,636 |
| 6.00 | Making expansions/Constraction joint in c.c including approved filler materials in joints. Depth of joints 10 Cm/required depth at the joints of panels and giving them a uniform finishing including supply of all material, labour tools & plants etc. required for proper completion of work as per direction of Engineer-in-charge. | 563.58 | RM | 100 ₹56,358 | 32.5 ₹18,316.35 | 29 ₹16,343.82 Lowest |
| 7.00 | Earth work in filling cut , repair & restoration of damage bank i/c ramming and dressing the surface to the required level and slope and also including 600 M. Lead &1.5M Lift with cost of earth from private land not aquired i/c all labour t&p etc complete. | 3,886.81 | Cum | 77 ₹2,99,284.06 Lowest | 150 ₹5,83,020.9 | 105 ₹4,08,114.63 |
| 8.00 | Supplying, Laying and Placing of Geo Textile Layer on slope including all cost of material labour T&P etc for proper completion of work as per direction of Engineer in charge. | 5,087.6 | Sqm | 70 ₹3,56,132 Lowest | 78 ₹3,96,832.8 | 70 ₹3,56,132 Lowest |
| 9.00 | Dry bricks on edge pitching in sand including preparation of suggrade and filling joints with local sand including cost of sand. | 920 | Sqm | 395 ₹3,63,400 | 360 ₹3,31,200 Lowest | 369 ₹3,39,480 |
Tender Value
₹82.6 L
EMD Value
₹1.6 L
Closing Date
15 Sept 2026, 5:00 pmClosed
S.E.E.G.C.C.C HARIDWAR
OFFICE OF S.E.E.G.C.C.C MAYAPUR HARIDWAR
Brick Pitching work of sensitive Right Bank From km. 4.400 to km. 4.900 of Shekhupura Dy. in District Bijnor.
2026_UPIDC_1180199_1
02/SE/2026-27
Open Tender
Civil Works
Item Rate
120 days
BIJNOR
Please refer tender documents
2 documents required · 2 mandatory
₹2,354
₹1.6 L
19 Sept 2026
8 Sept 2026
16 Sept 2026
8 Sept 2026
15 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in all type soil i/c lift upto 1.5M And lead up to 30M with back filling and watering ,ramming dressing manual compaction etc. | 555.47 | Cum | - | - |
| 2 | Plain Cement concrete (1:3:6) in normal mix with aggregate size 4 to 20 mm. with cost of all material, labour and T&P etc. complete. | 196.43 | Cum | - | - |
| 3 | Laying C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 4 to 20 mm stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering. | 46 | Cum | - | - |
| 4 | Brick work in C.M. 1:4 Mix cement & coarse sand including cost of all material, labour and T&P etc. complete. | 840.11 | Cum | - | - |
| 5 | Cement pointing in 1:2 cement mortar including cost of all material, labour and T&P etc. complete. | 2,787.6 | Sqm | - | - |
| 6 | Making expansions/Constraction joint in c.c including approved filler materials in joints. Depth of joints 10 Cm/required depth at the joints of panels and giving them a uniform finishing including supply of all material, labour tools & plants etc. required for proper completion of work as per direction of Engineer-in-charge. | 563.58 | RM | - | - |
| 7 | Earth work in filling cut , repair & restoration of damage bank i/c ramming and dressing the surface to the required level and slope and also including 600 M. Lead &1.5M Lift with cost of earth from private land not aquired i/c all labour t&p etc complete. | 3,886.81 | Cum | - | - |
| 8 | Supplying, Laying and Placing of Geo Textile Layer on slope including all cost of material labour T&P etc for proper completion of work as per direction of Engineer in charge. | 5,087.6 | Sqm | - | - |
| 9 | Dry bricks on edge pitching in sand including preparation of suggrade and filling joints with local sand including cost of sand. | 920 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Tenderdocuments.pdf
Tender Documents • 0.94 MB
BOQ_2219336.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .