Loading…
Loading…
Tender Value
₹9.2 L
EMD Value
₹18,300
Closing Date
29 Sept 2026, 2:00 pm2d left
Executive Engineer REW Leh
Executive Engineer Rural Engineering Wing Leh
Construction of road Siti to Community Hall at Stakmo
2026_RDD_19591_2
42- UTL REW Leh of 2026-27
Open Tender
Civil Works - Others
Percentage
30 days
Leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Payable To Executive Engineer REW Leh
₹18,300
Yes
22 Sept 2026
22 Sept 2026
1 Oct 2026
22 Sept 2026
29 Sept 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m. Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated earth in layers not exceeding 20 cm in depth. Deduct for not watering the excavated earth for banking All kinds of Soil. | 984.84 | Cum | - | - |
| 2 | Providing and laying of MS pipe 1' dia. All complete job | 6 | NO | - | - |
| 3 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) | 35.02 | CUM | - | - |
| 4 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources) | 20.9 | Sqm | - | - |
| 5 | Carriage of cement average lead upto 10 km by mechanical transport | 3.22 | mt | - | - |
| 6 | Carriage of sand and course aggregate average lead upto 10 km by mechanical transport | 16.79 | cum | - | - |
| 7 | Carriage of stone average lead upto 8 km by mechanical transport | 35.02 | cum | - | - |
| 8 | CARRIAGE OF EARTH AVG LEAD UPTO 10 KM BY MT | 393.94 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.52 MB
BOQ_46346.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .