| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-Finance PAHROOPUR DARIYABAD RAM SANEHI GHAT BARABANKI BARABANKI UTTAR PRADESH 225404 | BARABANKI | UTTAR PRADESH | 225404 | L1 | Accepted-Finance FOUND OK | |
| 2 | L2₹6.5 L+₹1.6 L (31.4%)Accepted-Finance | L2 | Accepted-Finance FOUND OK | |
| 3 | L3₹6.6 L+₹1.7 L (33.6%)Accepted-Finance | L3 | Accepted-Finance FOUND OK | |
| 4 | L4₹7.8 L+₹2.9 L (57.4%)Accepted-Finance | L4 | Accepted-Finance FOUND OK |
Tender Value
₹9.2 L
EMD Value
₹9,200
Closing Date
9 Mar 2023, 5:00 pmClosed
SE EDC BARABANKI
33/11 KV SUBSTATION BAREL BARABANKI
Construction of 11 KV Line in the area of Extended Nagar Nikay under EE,EDD,HaidergarhBarabanki
2023_MVVNL_777953_1
94/EDC BARABANKI/2022-23
Open Tender
Electrical Works
Fixed-rate
30 days
EDD HAIDERGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC BARABANKI
₹9,200
Yes
13 Mar 2023
24 Feb 2023
10 Mar 2023
24 Feb 2023
9 Mar 2023
24 Feb 2023
Amount
Safe loading carriage including unloading and proper stacking of following materials from Electrical Store Center Barabanki to dump site and vice virsa (in case of receipt back from site), in the area where work is to be executed.
PCC Pole 8.5 Mtr Long. (Vide P-28 of RESSPO Cost Schedule 2018-19)
S.T. Pole 11 Mtr Long.
ACSR Weasal Conductor.
11 KV XLPE cable 3X120.
Loose line and other miscellaneous Line materials.
Dragging of PCC Pole from Dump Site to pit site.
Dragging of ST Pole 11 mtr. Long from Dump Site to pit site.
Fabrication and Erection of 11 KV Single Pole Support on PCC Pole complete in all respect as per Respo norms. (Vide P-28 of RESSPO Cost Schedule 2018-19)
Fabrication and Erection of 11 KV Double Pole Support on PCC Poles complete in all respect as per RESPO NORMS.Stay insulator and likewise items which are not available in ESC will be provided by the contractor on his own cost.
Fabrication and Erection of 11 KV Double Pole Support on STP Poles complete in all respect as per RESPO NORMS.Stay insulator and likewise items which are not available in ESC will be provided by the contractor on his own cost.
Fabrication and Erection of Single Pole STP 11 Mtr Support complete in all respect as per RESPO NORMS.
Grouting of PCC/STP using cement with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories as per RESPO Norms, complete in all respect. (Vide P-28 of RESSPO Cost Schedule 2018-19)
Stringing and binding and jumpering of ACSR weasel Conductors for H.T. Lines complete in all respect.
Underground cabling work of 11 KV line by drilling method and hosting work.
Earthing of H.T Poles with M.S. Earthing Rod of size 20x2500 mm and 6 SWG Earthing wire etc. as per Specification. (Vide P-28 of RESSPO Cost Schedule 2018-19).
Three Branches Cutting
Erection of Stay set as per requirement by digging of pit of size 0.4x0.6x1.6 m. Grouting of stay set in the Ratio of 1:3:6 cement concrete, providing loop insolator, anchor plate as per norm. All the material except store item will be provided by the contractor. (Vide P-30 of RESSPO Cost Schedule 2018-19)
Guarding of 11 KV line road X-ing including material.
Supply of Nut Bolt
M/S J P CONSTRACTION COMPANY
M/S LAL BAHADUR CONTRACTOR
MS JANMEJAI SINGH CONTRACTOR
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .