| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹23.7 LAccepted-AOC CHECHI TOWER BHADDI ROAD BALACHAUR | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹20.4 L+₹28,800 (1.43%)Rejected-AOC 372 KALIA COLONY PHASE 1 JALANDHAR 144008 | JALANDHAR | PUNJAB | 144008 | L-2 | Rejected-AOC L-2 | |
| 3 | L-3₹35.3 L+₹15.2 L (75.5%)Rejected-AOC | L-3 | Rejected-AOC L-3 | |
| 4 | Not Admitted-PreQual/Technical BHAGOWAL VILLAGE P O CHANDIYANI KHURD TEHSIL BALACHAUR DISTRICT SHAHEED BHAGAT SINGH NAGAR | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹41.8 L
EMD Value
₹84,000
Closing Date
9 Nov 2023, 3:00 pmClosed
Sr XEN, Civil Maintenance Division, Jalandhar
Kothi No. 4, Shakti Sadan, Jalandhar
RCC retaining wall for Protection of Tower No.311, Stone Masonary retaining wall for Protection of Tower No. 321,330 and 331 and PCC Flooring of the Tower No. 310 of 132 KV Kangra Pathankot Line.
2023_POWER_109583_1
ET-52/2023-24
Open Tender
Civil Works
Tender cum Auction
60 days
Kangra
Please refer tender documents.
3 documents required · 3 mandatory
₹0
₹84,000
Yes
19 Feb 2024
20 Sept 2023
10 Nov 2023
20 Sept 2023
9 Nov 2023
20 Sept 2023
Amount
Earth work in excavation of foundations
Cement Concrete 1:5:10 with 40mm gauge stone aggregate.
Cement Concrete 1:6:12 with 40mm gauge stone aggregate.
Cement Concrete 1:8:16 with 40mm gauge stone aggregate.
Reinforced cement concrete M-20 with cement @375/kg per cum hand mixed but excluding steel reinforcement centring and shuttering in foundation and plinth
Extra for RCC/PCC work done above 4 metres height (where any single storey exceeds 4 metres in height) for every additional height of 1 metres or part thereof.
For 4 to 5m height
For 5 to 6m height
For 6 to 6.45m height
Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars Fe 500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete
Extra for work done in each subsequent storey above the first storey for item No. 18.17, 18.18, 18.19 and 18.34
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Centring and shuttering for faces of walls, partitions,retaining walls and the like (vertical or bartering including atta ched pillasters buttersses etc
Extra rate for shuttering work done above 4 metres height (where any single storey exceeds 4 metres in height) for every additional height of 1 metres or part thereof.
For 4 to 5m height
For 5 to 6m height
For 4 to 5m height
Rough tooled & bastard ashlar in cement mortar (1.3) upto 6 meters above plinth level.
Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% taking outside the premises in 15 cm layers including ramming, watering and consolidated lead upto 1000 metres
Conglomerate floor 50mm thick cement conc. Topping 1:2:4
Providing weep holes in brick masonary plain/Reinforced concrete abutment ,wing wall/return wall with 100mm dia PVC pipe ,extending through the full width of the structure with slope of 1V:20H towards drawing face complete as per drawing and technical specifications.,
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Extra Carriage and difference of material for coarse sand
Extra Carriage and difference of material fo fine sand
Extra Carriage and difference of material for Crusher 13. 2mm
Extra Carriage and difference of material for Crusher 11. 2mm
Extra Carriage a nd difference of material for Stone metal 40 MM
Extra Carriage and diff of material rate for Stone Rough-tooled
Extra Carriage and diff of material rate for Gravel 75 mm
Extra Carriage for Cement
Extra Carriage for Steel
Bidder Name
Amount in Words
Chechi Construction Co.
om namah shivay construction co.
NEO ENERGY SOLUTIONS
NEO ENERGY SOLUTIONS
Chechi Construction Co.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .