| 1 | L1₹81.1 LAccepted-AOC | ₹81.1 L | L1 | Accepted-AOC Admitted |
| 2 | L2₹81.4 LRejected-AOC | ₹81.4 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | V Vediyappan L1 | Alagesan Contractor L2 |
|---|---|---|---|---|---|
| 1.001.Construction of Drainage with Cover Slab at Meputhur near Panchayat Office H/o Kattiganapalli Rs.5.00 Lakhs | |||||
| 2.00 | Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete. | 51.94 | Cum | 164.66 ₹8,552.44 | 165.27 ₹8,584.12 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specification. | 7.42 | Cum | 5,243.02 ₹38,903.21 | 5,262.44 ₹39,047.30 |
| 4.00 | Cement concrete 1 : 3 : 6 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specification. | 19.32 | Cum | 5,993.17 ₹1.2 L | 6,015.37 ₹1.2 L |
| 5.00Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge | |||||
| 6.00 | Drain | 168 | Sqm | 546.84 ₹91,869.12 | 548.87 ₹92,210.16 |
| 7.00 | Cover slab | 45.5 | Sqm | 1,093.69 ₹49,762.90 | 1,097.74 ₹49,947.17 |
| 8.00 | Supplying and fabrication and placing in position in MS Steel or Ribbed Tor steel for all reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification | 0.62 | MT | 91,748.27 ₹56,608.68 | 92,088.15 ₹56,818.39 |
| 9.00 | Cement concrete 1 : 1.5 : 3 mix using 20mm ISS HBG metal for all RCC item works excluding cost of reinforcement and fabricating charges centering and shuttering but including curing and providing like fan clamps in the RCC floor | 6.37 | Cum | 8,960.25 ₹57,076.79 | 8,993.45 ₹57,288.28 |
| 10.00 | Provision for Name board | 1 | No | 699.16 ₹699.16 | 701.75 ₹701.75 |
Updated dates
Tender Value
₹82.2 L
EMD Value
₹83,000
Closing Date
17 Feb 2026, 3:00 pmClosed
Project Director DRDA Krishnagiri
DRDA Krishnagiri
Krishnagiri DT Krishnagiri Block 17 Work under DMFT 2025-2026 at Kattiganapalli Panchayats Package No 14 DMFT 2025-2026
2026_RDTN_652439_1
RocNo_15_2026_Mines_03_02_2026
Open Tender
Civil Works - Others
180 days
Krishnagiri
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹83,000
DRDA Krishnagiri
24 Mar 2026
7 Feb 2026
17 Feb 2026
7 Feb 2026
17 Feb 2026
7 Feb 2026
10 Feb 2026
1.Construction of Drainage with Cover Slab at Meputhur near Panchayat Office H/o Kattiganapalli Rs.5.00 Lakhs
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specification.
Cement concrete 1 : 3 : 6 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specification.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge
Drain
Cover slab
Supplying and fabrication and placing in position in MS Steel or Ribbed Tor steel for all reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification
Cement concrete 1 : 1.5 : 3 mix using 20mm ISS HBG metal for all RCC item works excluding cost of reinforcement and fabricating charges centering and shuttering but including curing and providing like fan clamps in the RCC floor
Provision for Name board
2.Providing Cement Concrete Pavement at Keelputhur from Murugan house to Pooja house H/o Kattiganapalli Rs.3.30 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Cement concrete 1:3:6 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Cement concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supply and fixing of bitumen pad for expansion joints including cost and labour charges etc., complete.
Provision for Name board
3.Providing Wearing coat at Keelputhur from Murugan houe to Avinkaran house H/o Kattiganapalli Rs.1.41 Lakhs
Cement concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supply and fixing of bitumen pad for expansion joints including cost and labour charges etc., complete.
Provision for Name board
4.Providing Wearing coat at Melputhur from Tank to Mariyamman Koil H/o Kattiganapalli Rs.4.33 Lakhs
Cement concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supply and fixing of bitumen pad for expansion joints including cost and labour charges etc., complete.
Provision for Name board
5.Providing Cement Concrete Pavement at Sathiya Sai Nagar from Subhasini house to Karupasamy house H/o Kattiganapalli Rs.4.82 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Cement concrete 1:3:6 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Cement concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supply and fixing of bitumen pad for expansion joints including cost and labour charges etc., complete.
Provision for Name board
6.Providing Wearing coat at TNHB phase II from LIG No.375 to JC Murugan house H/o Kattiganapalli Rs.1.30 Lakhs
Cement concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supply and fixing of bitumen pad for expansion joints including cost and labour charges etc., complete.
Provision for Name board
7.Providing Cement Concrete Pavement at Sathiya Sai Nagar from Thirumalai house to Selvam house H/o Kattiganapalli Rs.2.75 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Cement concrete 1:3:6 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Cement concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supply and fixing of bitumen pad for expansion joints including cost and labour charges etc., complete.
Provision for Name board
8.Providing Cement Concrete Pavement from Ashok house to Kannan house at Sathiya sai Nagar H/o Kattiganapalli Rs.4.80 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Cement concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supply and fixing of bitumen pad for expansion joints including cost and labour charges etc., complete.
Provision for Name board
9.Providing Cement Concrete Pavement from Karthi Teacher house to Raman house at Sathiya sai Nagar Nataraj Layout H/o Kattiganapalli Rs.2.45 lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Cement concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supply and fixing of bitumen pad for expansion joints including cost and labour charges etc., complete.
Provision for Name board
10.Construction of Drainage with Cement Concrete Pavement at Sathiya Sai Nagar from Gopal house to Elderly home H/o Kattiganapalli Rs.9.66 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Cement concrete 1:3:6 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge
Drain
Cover slab
Supplying and fabrication and placing in position in MS Steel or Ribbed Tor steel for all reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification
Reinforcement Cement concrete 1 : 1.5 : 3 mix using 20mm ISS HBG metal for all RCC item works excluding cost of reinforcement and fabricating charges centering and shuttering but including curing and providing like fan clamps in the RCC floor
Construction of Vertical Filter
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Brickwork using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 including curing neat finishing etc., complete complying with standard specification
Plastering with Cement Mortar 1:5, 12mm thick in akk floors including curing etc., complete complying with standard specification and as directed by the departmental officers
Supply and Fixing of RCC ring including cost and conveyance of all etc., complete
0.90m dia RCC ring
0.90m RCC Cover slab
Supply and filling of 40mm size HBG Metal including cost and conveyance of all etc., complete
Supply and filling of 20mm size HBG Metal including cost and conveyance of all etc., complete
Providing CC Pavement
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Cement concrete 1:3:6 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Cement concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supply and fixing of bitumen pad for expansion joints including cost and labour charges etc., complete.
Provision for Name board
11.Providing Cement Concrete Pavement at Sathiya Sai Nagar from Lakshmi house to Govindan house H/o Kattiganapalli Rs.5.45 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Cement concrete 1:3:6 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Cement concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supply and fixing of bitumen pad for expansion joints including cost and labour charges etc., complete.
Provision for Name board
12.Providing Cement Concrete Pavement at Sathiya Sai Nagar from Rahamed manzil house to Mohamad houe H/o Kattiganapalli Rs.6.20 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Cement concrete 1:3:6 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Cement concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supply and fixing of bitumen pad for expansion joints including cost and labour charges etc., complete.
Provision for Name board
13.Providing Cement Concrete Pavement at Sathiya Sai Nagar from Murali house to Manzil house H/o Kattiganapalli Rs.6.40 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Cement concrete 1:3:6 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Cement concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supply and fixing of bitumen pad for expansion joints including cost and labour charges etc., complete.
Provision for Name board
14.Providing Cement Concrete Pavement at TNHB Phase - II from Mekala house to Ramesh house H/o Kattiganapalli Rs.4.95 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Cement concrete 1:3:6 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Cement concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supply and fixing of bitumen pad for expansion joints including cost and labour charges etc., complete.
Provision for Name board
15.Providing Cement Concrete Pavement at TNHB phase - II from Venkatesan house to Existing culvert H/o Kattiganapalli Rs.7.10 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Cement concrete 1:3:6 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Cement concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supply and fixing of bitumen pad for expansion joints including cost and labour charges etc., complete.
Provision for Name board
16.Providing Wearing coat at TNHB phase II from 4th Cross to Meri house H/o Kattiganapalli Rs.7.10 Lakhs
Cement concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supply and fixing of bitumen pad for expansion joints including cost and labour charges etc., complete.
Provision for Name board
17.Providing Cement Concrete Pavement from Jagan house to Settu house at TNHB phase-I H/o Kattiganapalli Rs.5.15 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Cement concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supply and fixing of bitumen pad for expansion joints including cost and labour charges etc., complete.
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.61 MB
pbBuilding14.pdf
Tender Documents • 0.28 MB
BOQ_782310.xls
BOQ • 0.40 MB
tbBuilding14.pdf
Tender Documents • 0.49 MB
Download all tender documents and submit your bid