Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹7.6 L+₹24,424.70 (3.32%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹7.6 L+₹26,398.26 (3.59%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹7.8 L+₹48,450.50 (6.59%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹7.9 L+₹49,653.90 (6.75%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | G M & CO L1 | Vijaya Construction L2 | MCM ANDCO L6 | MCM AGENCY L3 | Om Sai Builders L7 | G V R & CO L5 | CR Dharunika & Co L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Name of Work: Providing Dining Hall for Neethipuram PUM School H/o Lakkampatti | ||||||||||
| 2.00 | Earth work Excavation in all soils and Sub Soil to full depth as may be directed expect in hard rock requiring blasting but inclusive of shoring strutting ,Sectioning the street to lay concrete pavement per SS 20B. | 14.28 | Cum | 210.43 ₹3,004.94 | 200 ₹2,856 Lowest | 237.4 ₹3,390.07 | 217.33 ₹3,103.47 | 240 ₹3,427.2 | 240 ₹3,427.2 | 225.33 ₹3,217.71 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 2.56 | Cum | 4,893.34 ₹12,526.95 | 5,000 ₹12,800 | 5,518.8 ₹14,128.13 | 5,069.37 ₹12,977.59 | 5,500 ₹14,080 | 4,900 ₹12,544 | 4,676.65 ₹11,972.22 Lowest |
| 4.00 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site etc | 6.85 | Cum | 7,863.25 ₹53,863.26 | 8,000 ₹54,800 | 8,868.4 ₹60,748.54 | 8,146.1 ₹55,800.79 | 9,100 ₹62,335 | 7,800 ₹53,430 | 6,054.14 ₹41,470.86 Lowest |
| 5.00 | Supplying and erecting centering shuttering including necessary supports for plane supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre officers including conveyance of all materials to site and proper centering etc complete.complete complying with standard specifications. | 27.54 | Cum | 436.51 ₹12,021.49 Lowest | 510 ₹14,045.4 | 492.75 ₹13,570.34 | 452.62 ₹12,465.15 | 540 ₹14,871.6 | 490 ₹13,494.6 | 810.34 ₹22,316.76 |
| 6.00 | Supplying and erecting centering shuttering including necessary supports for plane supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre officers including conveyance of all materials to site and proper centering etc complete.complete complying with standard specifications. | 30.36 | Cum | 873.01 ₹26,504.58 | 925 ₹28,083 | 985.5 ₹29,919.78 | 905.23 ₹27,482.78 | 1,000 ₹30,360 | 490 ₹14,876.4 Lowest | 722.76 ₹21,942.99 |
| 7.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works | 0.6 | Cum | 73,302.68 ₹43,981.61 Lowest | 91,800 ₹55,080 | 82,672 ₹49,603.2 | 75,939.42 ₹45,563.65 | 91,858.5 ₹55,115.1 | 84,000 ₹50,400 | 78,151.07 ₹46,890.64 |
| 8.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 10.13 | Cum | 4,951.59 ₹50,159.61 Lowest | 5,600 ₹56,728 | 5,584.5 ₹56,570.99 | 5,130.37 ₹51,970.65 | 6,200 ₹62,806 | 5,400 ₹54,702 | 6,079.65 ₹61,586.85 |
| 9.00 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 102.57 | Cum | 231.82 ₹23,777.78 Lowest | 265 ₹27,181.05 | 261.5 ₹26,822.06 | 240.23 ₹24,640.39 | 290 ₹29,745.3 | 290 ₹29,745.3 | 242.34 ₹24,856.81 |
| 10.00 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. | 102.57 | Cum | 209.44 ₹21,482.26 | 230 ₹23,591.1 | 236.23 ₹24,230.11 | 216.99 ₹22,256.66 | 250 ₹25,642.5 | 205 ₹21,026.85 Lowest | 232.09 ₹23,805.47 |
Tender Value
₹9.3 L
EMD Value
₹9,320
Closing Date
30 Sept 2026, 3:00 pmClosed
BDO (BP)
BDO office, Kolathur
Providing Dining hall at Neethipuram PUM School H/o Lakkampatti Panchayat in Kolathur Block at Salem District MP Fund -2026-2027
2026_RDTN_704364_1
ROC.No.454/2026/A2
Open Tender
Civil Works - Buildings
Item Rate
30 days
BDO office, Kolathur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,320
13 Oct 2026
15 Sept 2026
30 Sept 2026
15 Sept 2026
30 Sept 2026
15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Work: Providing Dining Hall for Neethipuram PUM School H/o Lakkampatti | - | - | - | - |
| 2 | Earth work Excavation in all soils and Sub Soil to full depth as may be directed expect in hard rock requiring blasting but inclusive of shoring strutting ,Sectioning the street to lay concrete pavement per SS 20B. | 14.28 | Cum | - | - |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 2.56 | Cum | - | - |
| 4 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site etc | 6.85 | Cum | - | - |
| 5 | Supplying and erecting centering shuttering including necessary supports for plane supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre officers including conveyance of all materials to site and proper centering etc complete.complete complying with standard specifications. | 27.54 | Cum | - | - |
| 6 | Supplying and erecting centering shuttering including necessary supports for plane supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre officers including conveyance of all materials to site and proper centering etc complete.complete complying with standard specifications. | 30.36 | Cum | - | - |
| 7 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works | 0.6 | Cum | - | - |
| 8 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 10.13 | Cum | - | - |
| 9 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 102.57 | Cum | - | - |
| 10 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. | 102.57 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
01.pdf
Tender Documents • 1.26 MB
BOQ_846597.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .