Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
20 Aug 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PIPELINES, HQO
Digitally signed and encrypted bids under two bid systems are invited for carrying out ILI services for
2500022151-HD-09025
5100022151
Open Tender
Two Bid
Beed, Maharashtra
₹0
Exempted
20 Aug 2025
31 Jul 2025
20 Aug 2025
20 Aug 2025
31 Jul 2025 - 6 Aug 2025
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | MAG CLEANING AWA- | MAG CLEANING AWA- — MAG CLEANING AWA-SALAWAS (10"). GAUGE, CLEANING, MAGNETIC CLEANING RUNS RUNNING ADEQUATE NUMBER OF GAUGE, CLEANING, MAGNETIC CLEANING PIGS AT THE FLOW RATES MENTIONED IN THE BID DOCUMENT INCLUSIVE OF PIG TRACKING OF THESE PIGS AT 10-15 KM INTERVALS INCLUDING SUPPLY OF ALL SUCH PERSONNEL, PIGS, TOOLS, TACKLES, EQUIPMENTS, CONSUMABLES, SPARES, ACCESSORIES, PIG TRACKING DEVICE AND PERSONNEL, TRANSPORTATION REQUIRED TO COMPLETE TOTAL SCOPE OF WORK BY CONTRACTOR AT WORK SITE, SITE REPORT PREPARATION OF GAUGE, CLEANING, MAGNETIC CLEANING PIG RUNS REQUIRED FOR SATISFACTORY COMPLETION OF WORKS FOR THE SECTION IN ALL RESPECT AS PER SPECIFICATIONS AND PROVISIONS OF THE BID DOCUMENT. | - | Each |
| 2 | MFL AXIAL AWA-SALAWAS (10" 1031-MDPL - AWA IP STATION | MFL AXIAL AWA-SALAWAS (10" 1031-MDPL - AWA IP STATION — "MFL-AXIAL RUNS FOR CARRYING OUT IN-LINE INSPECTION OF 10" " ASPL DIAMETER PIPELINES FOR DETECTION OF AXIALLY CIRCUMFERENTIALLY ORIENTED CRACK LIKE FEATURES AND DETECTION OF CORROSION USING HIGH-RESOLUTION MFL TECHNIQUE, ALONG WITH CONCURRENT XYZ MAPPING AT THE FLOW RATES MENTIONED IN THE BID DOCUMENT TO GENERATE VALID, INTERPRETABLE AND PHYSICALLY VERIFIABLE DATA INCLUSIVE OF PIG TRACKING OF THESE PIGS AT 10-15 KM INTERVAL, INCLUDING SUPPLY OF PERSONNEL, PIGS, TOOLS, TACKLES, EQUIPMENT'S, CONSUMABLES, SPARES, ACCESSORIES, PERMANENT MAGNET MARKERS, PIG TRACKING DEVICE ANDPERSONNEL, TRANSPORTATION BY CONTRACTOR AT WORK SITE, SITE REPORT PREPARATION OF CORROSION DETECTION PIG RUNS, DATAANALYSIS, PREPARATION OF PRELIMINARY REPORT FOR DIG VERIFICATION, ASSISTANCE DURING DIG SITE VERIFICATION, REQUIRED FOR SATISFACTORY COMPLETION OF WORKS FOR THE SECTION OF PIPELINE IN ALL RESPECT AS PER SPECIFICATIONS ANDPROVISIONS OF THE BID DOCUMENT." | - | Each |
| 3 | REPORT AWA-SALAWAS (10" ) 1031-MDPL - AWA IP STATION | REPORT AWA-SALAWAS (10" ) 1031-MDPL - AWA IP STATION — FINAL REPORTING SUBMISSION OF FINAL REPORT AS PER SPECIFICATIONS IN 4 HARDCOPIES AND 4 SOFTCOPIES, ALONG WITH COMPATIBLE SOFTWARE FOR DATA VIEWING, ANALYSIS, INTERPRETATION AND PIPELINE INTEGRITY ANALYSIS SOFTWARE FOR FEATURE ANALYSIS AND CORROSION GROWTH RATE ANALYSIS, SHALL BE PROVIDED. SUPPLIED SOFTWARE SHALL BE AS A MINIMUM FOR 15 PCS (WINDOWS 10 OS and higher) LICENSES & 1 NETWORK LICENSE WITH ONE CONCURRENT USER AT ANY TIME. | - | Each |
| 4 | EGP AWA-SALAWAS (10" ) | EGP AWA-SALAWAS (10" ) — EGP AWA-SALAWAS (10" ). THE ELECTRONIC GEOMETRY (CALIPER) PIG SHOULD BE CAPABLE OF RECORDING THE ENTIRE LENGTH OF EACH SEGMENT OF THE PIPELINE I.E. FROM LAUNCHER TO RECEIVER IN ONE SINGLE RUN AND THEREFORE ITS ELECTRONIC RECORDER SYSTEM SHOULD HAVE REQUISITE DATA STORAGE CAPACITY. BATTERY LIFE THEREFORE SHOULD BE ADEQUATE TO COMMENSURATE WITH THE RUN TIME REQUIRED TO TRAVEL THE PIPE LENGTH OF EACH SEGMENT AND THE DRIVE CUPS SHOULD HAVE REQUISITE RESISTANCE TO WEAR AND TEAR TO MAINTAIN EFFECTIVE SEAL THROUGHOUT THE ENTIRE RUN TIME. PRECISION BENCH MARKING HAVING GPS CAPABILITY ARE EXPECTED TO BE DEPLOYED AT AROUND 10 KMS INTERVAL OR APPROPRIATE, FOR EGP SURVEY THE MEASUREMENT SHALL COVER THE ENTIRE 360° OF INTERNAL PIPE WALL CIRCUMFERENCE USING PROPERLY ORIENTED AND SUFFICIENT QUANTITY OF SENSORS. THE TOOL SHOULD BE CAPABLE TO IDENTIFY AND LOCATE THE FOLLOWING FEATURES AS A MINIMUM. • INDIVIDUAL GIRTH WELD• DENT, OVALITY, BUCKLES, OR ANY OTHER OUT OF ROUNDNESS, CHANGE IN PIPELINE I.D. AND DIFFERENCE OF THICKNESS. • BEND WITH BEND RADIUS AND DEGREE OF BEND.• VALVES OR ANY PARTIALLY CLOSED VALVES." Note:- EGP Run will be optionable, will only be carried if required. Final decision will be taken by EIC. No payment will be made if EGP is not carried out. Schedule 2 Manadatory: No | - | Each |
| 1 | MAG CLEANING PALANPUR- | MAG CLEANING PALANPUR- — MAG CLEANING PALANPUR-IPS1 (18"). GAUGE, CLEANING, MAGNETIC CLEANING RUNS RUNNING ADEQUATE NUMBER OF GAUGE, CLEANING, MAGNETIC CLEANING PIGS AT THE FLOW RATES MENTIONED IN THE BID DOCUMENT INCLUSIVE OF PIG TRACKING OF THESE PIGS AT 10-15 KM INTERVALS INCLUDING SUPPLY OF ALL SUCH PERSONNEL, PIGS, TOOLS, TACKLES, EQUIPMENTS, CONSUMABLES, SPARES, ACCESSORIES, PIG TRACKING DEVICE AND PERSONNEL, TRANSPORTATION REQUIRED TO COMPLETE TOTAL SCOPE OF WORK BY CONTRACTOR AT WORK SITE, SITE REPORT PREPARATION OF GAUGE, CLEANING, MAGNETIC CLEANING PIG RUNS REQUIRED FOR SATISFACTORY COMPLETION OF WORKS FOR THE SECTION IN ALL RESPECT AS PER SPECIFICATIONS AND PROVISIONS OF THE BID DOCUMENT. | - | Each |
| 2 | MAG CLEANING IPS1- | MAG CLEANING IPS1- — MAG CLEANING IPS1-Vadodara (18" ). GAUGE, CLEANING, MAGNETIC CLEANING RUNS RUNNING ADEQUATE NUMBER OF GAUGE, CLEANING, MAGNETIC CLEANING PIGS AT THE FLOW RATES MENTIONED IN THE BID DOCUMENT INCLUSIVE OF PIG TRACKING OF THESE PIGS AT 10-15 KM INTERVALS INCLUDING SUPPLY OF ALL SUCH PERSONNEL, PIGS, TOOLS, TACKLES, EQUIPMENTS, CONSUMABLES, SPARES, ACCESSORIES, PIG TRACKING DEVICE AND PERSONNEL, TRANSPORTATION REQUIRED TO COMPLETE TOTAL SCOPE OF WORK BY CONTRACTOR AT WORK SITE, SITE REPORT PREPARATION OF GAUGE, CLEANING, MAGNETIC CLEANING PIG RUNS REQUIRED FOR SATISFACTORY COMPLETION OF WORKS FOR THE SECTION IN ALL RESPECT AS PER SPECIFICATIONS AND PROVISIONS OF THE BID DOCUMENT. | - | Each |
| 3 | MFL AXIAL PALANPUR-IPS1 | MFL AXIAL PALANPUR-IPS1 — PALANPUR-IPS1 SECTION 18 INCH-MFL RUN: "MFL-AXIAL RUNS FOR CARRYING OUT IN-LINE INSPECTION OF 18""PVPL DIAMETER PIPELINES FOR DETECTION OF AXIALLY CIRCUMFERENTIALLY ORIENTED CRACK LIKE FEATURES AND DETECTION OF CORROSION USING HIGH- RESOLUTION MFL TECHNIQUE, ALONG WITH CONCURRENT XYZ MAPPING AT THE FLOW RATES MENTIONED IN THE BID DOCUMENT TO GENERATE VALID, INTERPRETABLE AND PHYSICALLY VERIFIABLE DATA INCLUSIVE OF PIG TRACKING OF THESE PIGS AT 10-15 KM INTERVAL, INCLUDING SUPPLY OF PERSONNEL, PIGS, TOOLS, TACKLES, EQUIPMENT'S, CONSUMABLES, SPARES, ACCESSORIES, PERMANENT MAGNET MARKERS, PIG TRACKING DEVICE AND PERSONNEL, TRANSPORTATION BY CONTRACTOR AT WORK SITE, SITE REPORT PREPARATION OF CORROSION DETECTION PIG RUNS, DATA ANALYSIS, PREPARATION OF PRELIMINARY REPORT FOR DIG VERIFICATION, ASSISTANCE DURING DIG SITE VERIFICATION, REQUIRED FOR SATISFACTORY COMPLETION OF WORKS FOR THE SECTION OF PIPELINE IN ALL RESPECT AS PER SPECIFICATIONS ANDPROVISIONS OF THE BID DOCUMENT." | - | Each |
| 4 | MFL AXIAL IPS1-VADODARA | MFL AXIAL IPS1-VADODARA — IPS1-VADODARA SECTION 18 INCH MFL RUN: "MFL-AXIAL RUNS FOR CARRYING OUT IN-LINE INSPECTION OF 18""PVPL DIAMETER PIPELINES FOR DETECTION OF AXIALLY CIRCUMFERENTIALLY ORIENTED CRACK LIKE FEATURES AND DETECTION OF CORROSION USING HIGH- RESOLUTION MFL TECHNIQUE, ALONG WITH CONCURRENT XYZ MAPPING AT THE FLOW RATES MENTIONED IN THE BID DOCUMENT TO GENERATE VALID, INTERPRETABLE AND PHYSICALLY VERIFIABLE DATA INCLUSIVE OF PIG TRACKING OF THESE PIGS AT 10-15 KM INTERVAL, INCLUDING SUPPLY OF PERSONNEL, PIGS, TOOLS, TACKLES, EQUIPMENT'S, CONSUMABLES, SPARES, ACCESSORIES, PERMANENT MAGNET MARKERS, PIG TRACKING DEVICE AND PERSONNEL, TRANSPORTATION BY CONTRACTOR AT WORK SITE, SITE REPORT PREPARATION OF CORROSION DETECTION PIG RUNS, DATA ANALYSIS, PREPARATION OF PRELIMINARY REPORT FOR DIG VERIFICATION, ASSISTANCE DURING DIG SITE VERIFICATION, REQUIRED FOR SATISFACTORY COMPLETION OF WORKS FOR THE SECTION OF PIPELINE IN ALL RESPECT AS PER SPECIFICATIONS ANDPROVISIONS OF THE BID DOCUMENT." | - | Each |
| 5 | REPORT PALANPUR-IPS1 (18" | REPORT PALANPUR-IPS1 (18" — FINAL REPORTING SUBMISSION OF FINAL REPORT AS PER SPECIFICATIONS IN 4 HARDCOPIES AND 4 SOFTCOPIES, ALONG WITH COMPATIBLE SOFTWARE FOR DATA VIEWING, ANALYSIS, INTERPRETATION AND PIPELINE INTEGRITY ANALYSIS SOFTWARE FOR FEATURE ANALYSIS AND CORROSION GROWTH RATE ANALYSIS, SHALL BE PROVIDED. SUPPLIED SOFTWARE SHALL BE AS A MINIMUM FOR 15 PCS (WINDOWS 10 OS and higher) LICENSES & 1 NETWORK LICENSE WITH ONE CONCURRENT USER AT ANY TIME. | - | Each |
| 6 | REPORT IPS1-VADODARA (18" 1556-PVPL VADODARA | REPORT IPS1-VADODARA (18" 1556-PVPL VADODARA — FINAL REPORTING SUBMISSION OF FINAL REPORT AS PER SPECIFICATIONS IN 4 HARDCOPIES AND 4 SOFTCOPIES, ALONG WITH COMPATIBLE SOFTWARE FOR DATA VIEWING, ANALYSIS, INTERPRETATION AND PIPELINE INTEGRITY ANALYSIS SOFTWARE FOR FEATURE ANALYSIS AND CORROSION GROWTH RATE ANALYSIS, SHALL BE PROVIDED. SUPPLIED SOFTWARE SHALL BE AS A MINIMUM FOR 15 PCS (WINDOWS 10 OS and higher) LICENSES & 1 NETWORK LICENSE WITH ONE CONCURRENT USER AT ANY TIME. | - | Each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2500022151-HD-09025.pdf
TENDER_DOCUMENT • 21.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .