Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.1 LAccepted-AOC DHARMAPURI | DHARMAPURI | DHARMAPURI | TAMIL NADU | ₹19.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹21.6 LRejected-AOC | ₹21.6 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SIVA KUMAR L2 | VELLINGIRI & CO L1 |
|---|---|---|---|---|---|
| 1.00Strengthening to the Road From Vaguthupatti BC Burial Ground Road (Road Code:R 415) KM 0/0-0/540 H/O Vaguthupatti. | |||||
| 2.00 | Clearing Scrub Jungle including removing from the site,disposal by burying or burning etc., complete as directed by the departmental officers. KM 0/0-0/540 | 648 | Sqm | 10 ₹6,480 | 6.36 ₹4,121.28 |
| 3.00 | Picking the Existing BT Surface wornout Surface including all labour charges etc KM 0/0-0/540 | 540 | Sqm | 30 ₹16,200 | 21.84 ₹11,793.60 |
| 4.00 | Earthwork excavation and depositing on bank with initial lead of 10Metre lift of 2.00Metres in hard gravel soil including cost and conveyance of all and labour charges ete., complete as per SS 20A KM 0/0-0/540 | 218.7 | Cum | 200 ₹43,740 | 140.45 ₹30,716.42 |
| 5.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction KM 0/0-0/540 | 72.9 | Cum | 650 ₹47,385 | 475.76 ₹34,682.90 |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 243 | Cum | 3,500 ₹8.5 L | 2,780.66 ₹6.8 L |
| 7.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 1,620 | Sqm | 84.48 ₹1.4 L | 84.48 ₹1.4 L |
| 8.00 | Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 1,620 | Sqm | 19.46 ₹31,525.20 | 19.46 ₹31,525.20 |
| 9.00 | Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects | 48.6 | Cum | 11,459.2 ₹5.6 L | 11,459.2 ₹5.6 L |
| 10.00 | Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface | 108 | Sqm | 890 ₹96,120 | 890 ₹96,120 |
Tender Value
₹19.4 L
EMD Value
₹19,400
Closing Date
12 Mar 2026, 3:00 pmClosed
Block Development Officer(VP), Kadathur
Block Development Officer(VP), Kadathur
Strengthening to the Road From Vaguthupatti BC Burial Ground Road Road Code R 415 KM 0/0-0/540 H/O Vaguthupatti.
2026_RDTN_673435_1
Roc.No.537/2022/E2 P03-Mines and minerals-2023-24
Open Tender
Civil Works
90 days
Block Development Office, Kadathur
Can be seen in the Tender Documents
3 documents required · 3 mandatory
₹0
₹19,400
17 Mar 2026
11 Mar 2026
12 Mar 2026
11 Mar 2026
12 Mar 2026
11 Mar 2026
Strengthening to the Road From Vaguthupatti BC Burial Ground Road (Road Code:R 415) KM 0/0-0/540 H/O Vaguthupatti.
Clearing Scrub Jungle including removing from the site,disposal by burying or burning etc., complete as directed by the departmental officers. KM 0/0-0/540
Picking the Existing BT Surface wornout Surface including all labour charges etc KM 0/0-0/540
Earthwork excavation and depositing on bank with initial lead of 10Metre lift of 2.00Metres in hard gravel soil including cost and conveyance of all and labour charges ete., complete as per SS 20A KM 0/0-0/540
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction KM 0/0-0/540
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Provision for Road Stud
Provision for KM stones
Provision for HM stones
Provision for Name Board
Provision for Sign Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Pricebid3.pdf
Tender Documents • 0.42 MB
BOQ_809415.xls
BOQ • 0.32 MB
Techbid3.pdf
Additional Documents • 0.70 MB
Download all tender documents and submit your bid