| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹65.8 LAccepted-AOC SANDHOLI LANGA PATTI ALIPURA KALAN VPO THANESAR KURUKSHETRA HARYANA 136119 | THANESAR | KURUKSHETRA | HARYANA | 136119 | 1 | Accepted-AOC ok |
Tender Value
₹58.7 L
EMD Value
₹1.2 L
Closing Date
22 Apr 2021, 12:00 pmClosed
Executive Engineer Karnal WS Division Karnal
Executive Engineer Karnal WS Division The Mall Road Karnal
Reconstruction of V.R. Bridge at RD 50000 Nai Nallah Drain
2021_HRY_168834_10
No.2863-78/53-M dated 07/04/2021
Open Tender
Civil Works
Item-rate/Agreement basic
360 days
Karnal
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹1.2 L
Yes
2 Jul 2021
15 Apr 2021
22 Apr 2021
15 Apr 2021
22 Apr 2021
15 Apr 2021
Amount
Works Details
Dismantling CC 1:2:4 complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No. 8.6 (d ).
Dismantling Brick work, Tile masonry or tile lining and tile terracing; arch work in cement or lime complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR Item No.8.5 (c)
Removing RCC Hume pipes 900 mm dia including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. HSR item No.8.35 (c)
Earthwork excavation in ordinary soil exclusive of compensation of earth with all lead, lifts & other aloowances (if any) including breaking of clods (in filling for Diversions, X-bundh etc.) duly dressed including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.6.2 (b)
Earth work in excavation in foundations, trenches etc. in all kinds of soils, not exceeding 2 metres depth including dressing & bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation & subsequent filling around masonary, in 15cm layers with compaction, including disposal of all surplus soil, as directed by Engineer incharge withing a lead of 30 meters etc. including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.6.6
Extra for compaction of earth as per specification including watering earth laid in 25 cm layers including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.6.2 (g), I ,ii & (v)
Rehandling of earth work for removing of X-Bund U/S & D/S and diversion to traffic etc including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.6.2(b)
Preparing, watering and ramming surface for laying concrete including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No. 10.122 (b,i)
Shuttering for faces of concrete foundation and foundation beams including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications (HSR item No. 9.13).
Centring and shuttering for faces of walls including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.9.5
Centring and shuttering for main slab including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.9.18 (b)
PCC providing & Laying in position machine batched and Machine mixed desgin mix M-15 Grade cement concrete for reinforced cement concrete work, using cement content as per approved desgin mix i/c pumping of concrete to site of laying but excluding the cost of centering shutteing finishing, and reinforcement including admixture in recommended proportion as per IS 9103 to Accelrate, retard setting of concrete, imporive work ability without impreaing strength & durability as per direction Engineer-in-Charge in F&P. cement content 240 kg Per cum including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.(10.64-10.79+10.41)
RCC providing & Laying in position machine batched and Machine mixed desgin mix M-25 Grade cement concrete for reinforced cement concrete work, using cement content as per approved desgin mix i/c pumping of concrete to site of laying but excluding the cost of centering shutteing finishing, and reinforcement including admixture in recommended proportion as per IS 9103 to Accelrate, retard setting of concrete, imporive work ability without impreaing strength & durability as per direction Engineer-in-Charge in F&P minimum cement content 330 kg including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No. 10.66
RCC providing & Laying in position machine batched and Machine mixed desgin mix M-25 Grade cement concrete for reinforced cement concrete work, using cement content as per approved desgin mix i/c pumping of concrete to site of laying but excluding the cost of centering shutteing finishing, and reinforcement including admixture in recommended proportion as per IS 9103 to Accelrate, retard setting of concrete, imporive work ability without impreaing strength & durability as per direction Engineer-in-Charge in in first storey 4 mtr,above plinth minimum cement content 330 kg as per HSR item No. 10.73
PCC providing & Laying in position machine batched and Machine mixed desgin mix M-25 Grade cement concrete for reinforced cement concrete work, using cement content as per approved desgin mix i/c pumping of concrete to site of laying but excluding the cost of centering shutteing finishing, and reinforcement including admixture in recommended proportion as per IS 9103 to Accelrate, retard setting of concrete, imporive work ability without impreaing strength & durability as per direction Engineer-in-Charge in F&P minimum cement content 330 kg including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.(10.66-10.79+10.41)
1st class brick work laid in cement mortar 1:3 in foundation & plinth including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No. 11.5
Striking joints in lime or cement on Brick or tile including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.15.69
Providing and fixing premoulded bituminous joint filler, for expansion joints, including the cost of sealing compound and primer coat- including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.24.35 (b)
Providing & fixing PVC Rain Water Pipe 6 Kg. Pressure of ISI Mark in Cement Mortar during Masonry Work including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.13.89 (a)
Fe-500 EQ TMT steel bars RCC work where not included in the complete rate of RCC including bending, binding and placing in position including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. (HSR item No. 18.22)
Laying dry brick bats including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No. 10.116
Preparation of plastered or concrete surfaces for painting, including sand papering the surface, applying one coat of linseed oil and filling with approved quality filler, consisting of white lead, linseed oil, varnish and chalk mitti including finishing surface to the required finish, complete including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.16.24
Applying priming coat with cement primer in all shades on newly plastered or concrete exterior surfaces including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.16.25
Painting two coats with ready-mixed exterior paint in all shades on newly plastered or concrete surface of walls including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.16.26
D/d Credit:- a). Bricks removed after dismantling
D/d Credit:- b). Hume Pipe
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .