| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-Finance | ₹1.5 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹1.6 Cr+₹7.3 L (4.83%)Rejected-Finance | ₹1.6 Cr+₹7.3 L (4.83%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | SAS BUILDERS L1 | JEEN BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00Strengthening of Alencode Kollai Road (R38) km 0/0-2/930 in Thickanamcode village Panchayat . | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 1,370.4 | Sq.m | 5 ₹6,852 Lowest | 6.2 ₹8,496.48 |
| 3.00Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20A | |||||
| 4.00 | Km 0/0- 1/0 | 125.1 | Cum | 130 ₹16,263 Lowest | 137.19 ₹17,162.47 |
| 5.00 | Km1/0-2/0 | 109.35 | Cum | 130 ₹14,215.5 Lowest | 137.19 ₹15,001.73 |
| 6.00 | Km 2/0-2/930 | 108.15 | Cum | 130 ₹14,059.5 Lowest | 137.19 ₹14,837.1 |
| 7.00collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc. | |||||
| 8.00 | Km 0/0- 1/0 | 110.1 | Cum | 100 ₹11,010 Lowest | 105 ₹11,560.5 |
| 9.00 | Km1/0-2/0 | 109.35 | Cum | 100 ₹10,935 Lowest | 105 ₹11,481.75 |
| 10.00 | Km 2/0-2/930 | 108.15 | Cum | 100 ₹10,815 Lowest | 105 ₹11,355.75 |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
16 May 2025, 3:00 pmClosed
Project Director DRDA
DRDA Collectorate Kanniyakumari
Strengthening of 2 Road works in Package No 5 in Thuckalay Block under Mudhalvarin Grama Salaigal Membattu Thittam (MGSMT) 2025-26
2025_RDTN_552768_1
A4/887/2025(5) dated 25.04.2025
Open Tender
Civil Works - Roads
Item Wise
180 days
Thuckalay Block Area
As per Technical Bid
3 documents required · 3 mandatory
₹0
₹1.6 L
DRDA Collectorate Kanniyakumari
21 Aug 2025
30 Apr 2025
16 May 2025
30 Apr 2025
16 May 2025
30 Apr 2025
30 Apr 2025
Amount
Strengthening of Alencode Kollai Road (R38) km 0/0-2/930 in Thickanamcode village Panchayat .
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20A
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Picking the Existing metalled surface 5cm to 10cm thick and carefully stacking materials useful for refuse including hire charge for tools laying spreading, new metal, hand packing to camber, gravel blinding, watering with all leads of good water, rolling and compacting by power roller and finishing to the total thickness with lines grades and cross section as specified in the departmental specification including all charges for all T&P employed and cost of free and other running charges and all other incidental charges etc. complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and applying Prime Coat (WMM) with bitumen emulsion(SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at therate of 0.70-1.0kg/sqm using mechanical means as per Technical Specification Clause 502.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all etc
Providing and laying 50 mm consolidated thick Bituminious mecadam using 0.24cum of 26.50-13.20mm. graded metal and 0.25cum of 13.20-2.36 mm. graded meta and0.23 cum of 2.36 mm below with 53.20kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Supply and fixing of KILOMETER STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Sub Estimate for Hard bed
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20A
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical type as per Clause 1501.
Strengthening of Kattyetti to Chadayankal road in Maruthoorkurichi village panchayat of thuckalay block (km 0/0-1/440) in Kanniyakumari District R-Code-R-181
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking the Existing metalled surface 5cm to 10cm thick and carefully stacking materials useful for refuse including hire charge for tools laying spreading, new metal, hand packing to camber, gravel blinding, watering with all leads of good water, rolling and compacting by power roller and finishing to the total thickness with lines grades and cross section as specified in the departmental specification including all charges for all T&P employed and cost of free and other running charges and all other incidental charges etc. complete
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Supplying and erecting for sides and soffits including supports and strutting for plane surfaces in all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffered welded with mild angles of size 25x25x3mm for boarding laid over silver oak joists of size 10cmx65cm dia spaced at 75cm centre to centre etc, complete complying with standard specification and as directed for the following items, R.C.C. floor slab, bench slab all RCC works.
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 20mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical type as per Clause 1501.
Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Supply and fixing of KILOMETER STONE (three faces two lines dressed) of size from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
JEEN BUILDERS (BID ID -1341793)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .