Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Finance | -3.03% | ₹4.6 L | L1 | Admitted-Finance |
| 2 | L2₹5.0 L+₹43,801.83 (9.62%)Admitted-Finance | +6.30% | ₹5.0 L+₹43,801.83 (9.62%) | L2 | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
12 May 2026, 6:00 pmClosed
Commissioner
Municipal Council Balotra
Construction of Public Reading room at Balaji mandir ward no 31near Master Calendar
2026_DLB_555653_3
02/2026-27
Open Tender
Civil Works
Percentage
Balotra
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
as per nit
₹10,000
Yes
27 May 2026
2 May 2026
13 May 2026
2 May 2026
12 May 2026
2 May 2026
2 May 2026 - 12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt,
clay, black cotton soil, kankar, etc.Depth upto 1.5 m | 17.5 | cum | 229.5 | ₹4,016.25 |
| 2 | Filling with locally available river sand at all levels including watering
ramming consolidating and dressing complete including cost of
sand. | 4 | cum | 1,013 | ₹4,052 |
| 3 | Providing and laying in position cement concrete of specified grade
excludin1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone gregate 40 mm nominal size) | 9 | cum | 4,575 | ₹41,175 |
| 4 | Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand) | 15 | cum | 4,860 | ₹72,900 |
| 5 | Supplying and stacking good earth at site of work.Note: 1) Loading, unloading and carriage to be paid extra as per actual lead. 2) Earth measured in stacks will be reduced by 20% foe payment | 30 | cum | 324.5 | ₹9,735 |
| 6 | Earth filling with available surplus soil excavated from foundations and taken only from outside of building plinth in layers not exceeding 20cm in depth, consolidating each deposited layer including ramming and watering and consolidation with lead up to 50 m and lift upto 1.5 m. | 30 | cum | 159 | ₹4,770 |
| 7 | Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand)Extra for random rubble masonry with hard stone in superstructure above plinth level and upto two stories. | 17.5 | cum | 970 | ₹16,975 |
| 8 | Extra for coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto two stories. | 5 | cum | 977 | ₹4,885 |
| 9 | Extra for coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto two stories. | 2 | cum | 725 | ₹1,450 |
| 10 | Stone work in plain ashlar in super structure upto floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) including pointing with cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade :White sand stone | 0.6 | cum | 46,900 | ₹28,140 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
Tendernotice_2.pdf
PDF • 0.37 MB
BOQ_989482.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .