Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-Finance | ₹4.1 L | L1 | Accepted-Finance Lowest rate quated |
| 2 | L2₹4.1 L+₹688.11 (0.17%)Rejected-Finance | ₹4.1 L+₹688.11 (0.17%) | L2 | Rejected-Finance Highest rate quated |
| 3 | L3₹4.2 L+₹11,004.12 (2.67%)Rejected-Finance | ₹4.2 L+₹11,004.12 (2.67%) | L3 | Rejected-Finance Highest rate quated |
| 4 | L4₹4.5 L+₹40,914.65 (9.93%)Rejected-Finance | ₹4.5 L+₹40,914.65 (9.93%) | L4 | Rejected-Finance Highest rate quated |
| 5 | L5₹4.6 L+₹45,409.73 (11.0%)Rejected-Finance | ₹4.6 L+₹45,409.73 (11.0%) | L5 | Rejected-Finance Highest rate quated |
| Sl No | Description | Qty | Unit | Jaganraj Rajendiran contractor L4 | Pozilan L5 | Manimaran Devarajan L2 | Pazhanivel.S L3 | K Selvakumar L1 |
|---|---|---|---|---|---|---|---|---|
| 1.01 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation. | 5.58 | cum | 246.52 ₹1,375.58 | 242.65 ₹1,353.99 | 166 ₹926.28 Lowest | 250 ₹1,395 | 210 ₹1,171.8 |
| 1.02 | Filling with river M-Sand including cost and coveyance of all materials to work site and all labour charges etc. | 2.83 | cum | 2,173.14 ₹6,149.99 | 1,500 ₹4,245 | 955 ₹2,702.65 Lowest | 2,129 ₹6,025.07 | 1,600 ₹4,528 |
| 1.03 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 2.84 | cum | 5,957.5 ₹16,919.3 | 5,900 ₹16,756 | 2,500 ₹7,100 | 2,130 ₹6,049.2 Lowest | 5,500 ₹15,620 |
| 1.04 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Below Basement. | 15.05 | sqm | 547.5 ₹8,239.88 | 480 ₹7,224 Lowest | 1,110 ₹16,705.5 | 1,500 ₹22,575 | 2,500 ₹37,625 |
| 1.05 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Above Basement. | 34.8 | sqm | 547.4 ₹19,049.52 Lowest | 800 ₹27,840 | 655 ₹22,794 | 1,220 ₹42,456 | 1,000 ₹34,800 |
| 1.06 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete Upto basement | 3.76 | cum | 626.14 ₹2,354.29 Lowest | 6,100 ₹22,936 | 3,560 ₹13,385.6 | 4,080 ₹15,340.8 | 5,500 ₹20,680 |
| 1.07 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete Above basement | 9.07 | cum | 626 ₹5,677.82 Lowest | 6,200 ₹56,234 | 2,540 ₹23,037.8 | 4,180 ₹37,912.6 | 3,500 ₹31,745 |
| 1.08 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.Upto Basement | 2.27 | cum | 625.14 ₹1,419.07 Lowest | 8,800 ₹19,976 | 2,540 ₹5,765.8 | 4,200 ₹9,534 | 1,900 ₹4,313 |
| 1.09 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.Above Basement | 3.21 | cum | 971.14 ₹3,117.36 Lowest | 9,000 ₹28,890 | 1,500 ₹4,815 | 1,700 ₹5,457 | 2,000 ₹6,420 |
| 1.10 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.55 | ton | 90,047 ₹49,525.85 | 85,000 ₹46,750 | 48,000 ₹26,400 | 3,500 ₹1,925 Lowest | 45,000 ₹24,750 |
Tender Value
₹5.9 L
EMD Value
₹5,920
Closing Date
21 Jul 2026, 3:00 pmClosed
Block Development Officer BP, Kammapuram
Panchayat Union Office, Kammapuram
Construction of Mini CSC near PUPS Type I Common at Mudhanai Panchayat
2026_RDTN_684382_2
C4/015/2026
Open Tender
Civil Works - Buildings
Item Rate
90 days
Panchayat Union Office, Kammapuram
As per tender
8 documents required · 8 mandatory
₹0
₹5,920
Panchayat Union Office, Kammapuram
27 Aug 2026
7 Jul 2026
21 Jul 2026
7 Jul 2026
21 Jul 2026
7 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation. | 5.58 | cum | 246.52 | ₹1,375.58 |
| 1.02 | Filling with river M-Sand including cost and coveyance of all materials to work site and all labour charges etc. | 2.83 | cum | 1,897.8 | ₹5,370.77 |
| 1.03 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 2.84 | cum | 1,897.8 | ₹5,389.75 |
| 1.04 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Below Basement. | 15.05 | sqm | 1,897.8 | ₹28,561.89 |
| 1.05 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Above Basement. | 34.8 | sqm | 1,897.8 | ₹66,043.44 |
| 1.06 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete Upto basement | 3.76 | cum | 1,897.8 | ₹7,135.73 |
| 1.07 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete Above basement | 9.07 | cum | 1,897.8 | ₹17,213.05 |
| 1.08 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.Upto Basement | 2.27 | cum | 1,897.8 | ₹4,308.01 |
| 1.09 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.Above Basement | 3.21 | cum | 1,897.8 | ₹6,091.94 |
| 1.1 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.55 | ton | 1,897.8 | ₹1,043.79 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
Technicalbid.pdf
Tender Documents • 1.10 MB
Pricebid.pdf
Additional Documents • 0.68 MB
BOQ_822691.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .