Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.8 LAccepted-AOC | ₹40.8 L | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹42.1 L+₹1.4 L (3.37%)Rejected-AOC | ₹42.1 L+₹1.4 L (3.37%) | L2 | Rejected-AOC NOT LOWEST BIDDER |
| 3 | L3₹42.4 L+₹1.6 L (3.99%)Rejected-AOC 240 1 A RAI COLONY CIVIL LINES JHANSI 284001 | JHANSI | JHANSI | UTTAR PRADESH | 284001 | ₹42.4 L+₹1.6 L (3.99%) | L3 | Rejected-AOC NOT LOWEST BIDDER |
| 4 | L4₹43.2 L+₹2.4 L (5.95%)Rejected-AOC | ₹43.2 L+₹2.4 L (5.95%) | L4 | Rejected-AOC NOT LOWEST BIDDER |
| 5 | L5₹43.8 L+₹3.1 L (7.55%)Rejected-AOC 1442 1 NANADANPURA BABINA CANTT TEHSIL DISTT JHANSI UP | BABINA | JHANSI | UP | ₹43.8 L+₹3.1 L (7.55%) | L5 | Rejected-AOC NOT LOWEST BIDDER |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
22 Aug 2026, 6:00 pmClosed
BRIJ BIHARI, AE (CIVIL), AGE (I) TALBEHAT
AGE (I) TALBEHAT, LAKEVIEW CAMP MIL STN TALBEHAT 284125
TERM CONTRACT FOR ARTIFICER WORKS IN AREA-I AT MIL STATION TALBEHAT
2026_MES_782240_1
AGE(I)/TBT/TOK-13/2026-27
Open Tender
Civil Works
Percentage
365 days
LAKEVIEW CAMP MIL STN TALBEHAT 284125
7 documents required · 7 mandatory
₹500
AGE (I) TALBEHAT
₹1 L
Yes
9 Sept 2026
1 Aug 2026
24 Aug 2026
8 Aug 2026
22 Aug 2026
15 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Term contract work complete items of work all sections included in the MES standard schedule of rates 2009 Part-I (Specifications) and SSR-2020 Part-II (Rates) hereafter referred to be the MES Schedule including errata/amendment as applicable and as specified in the tender documents. The estimated amount shown in this Schedule shall be exclusive of (+)/(-) percentage quoted by contractor herein above the amount shall be amended as per percentage quoted by the contractor. Quoted percentage shall prevail. The contractor shall be allowed to insert the percentage only upto two decimal places. | 1 | As per SSR Part-II (2020) | 0.68 | ₹0.68 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_876346.xls
BOQ • 0.28 MB
TENDER.pdf
Tender Documents • 0.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .