| 1 | L1₹4.5 LAccepted-AOC 2 206 C PONNAGAR METTUR DAM 636 401 SALEM DISTRICT | SALEM | TAMIL NADU | 636401 | ₹4.5 L Quoted ₹4.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.0 LRejected-AOC 36 137 THANGAMAPURIPATTINAM METTUR DAM 636 402 | SALEM | TAMIL NADU | 636402 | ₹5.0 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SRI V M A ENTERPRISES L2 | SARVESWARASAMY AND CO L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for dismantling lifting and leading the Polishing unit from 4.5mtr. area to DM Plant for regeneration of the resin, Dismantling of outlet flanges, Cleaning of the mesh and reassembling with new gaskets, and back to its original position.(any one of unit ) | 2 | Nos | 7,000 ₹14,000 | 6,300 ₹12,600 Lowest |
| 2.00 | Charges for drying out the Stator winding by circulating Hot air and puffing work.( any one of unit ) | 2 | Nos | 9,000 ₹18,000 | 8,000 ₹16,000 Lowest |
| 3.00 | Charges for Purging of H2 gas in TG casing. (any one of unit ) | 4 | Nos | 4,000 ₹16,000 | 3,800 ₹15,200 Lowest |
| 4.00 | Charges for filling of H2 gas in TG casing.( any one of unit ) | 4 | Nos | 9,000 ₹36,000 | 8,000 ₹32,000 Lowest |
| 5.00 | Charges for conducting Air Tightness Test and attending minor leaks of H2 gas system. (any one of unit ) | 4 | Nos | 6,000 ₹24,000 | 5,700 ₹22,800 Lowest |
| 6.00 | Charges for removing the 15.75KV Bus links and connecting shorting bar across the bus for Generator SC test purpose and removing the shorting bar and normalizing the Bus. (any one of unit ) | 1 | Nos | 42,000 ₹42,000 | 39,500 ₹39,500 Lowest |
| 7.00 | Charges for laying / dismantling the HT 1CX500 Sq. mm. Armoured Aluminium Power cable including loading, transporting & unloading of cable from central stores to site and devoluting the remaining to the stores.(any one of unit ) | 200 | Mtrs | 150 ₹30,000 | 110 ₹22,000 Lowest |
| 8.00 | Charges for laying / dismantling the HT 3CX185 Sq mm Armoured Aluminium Power cable including loading,transporting & unloading of cable from central stores to site and devoluting the remaining to the stores. (any one of unit ) | 200 | Mtrs | 180 ₹36,000 | 160 ₹32,000 Lowest |
| 9.00 | Charges for dismantling and assembling of HT / LT terminal links of 31.5 MVA Station Transformer | 2 | Nos | 20,000 ₹40,000 | 18,000 ₹36,000 Lowest |
| 10.00 | Charges for Releasing and assembling of horizontal bus bar inter connectors in R, Y, B phases (2 Joint / Phase ( top & bottom) i.e, 6 Joint per location) (any one unit LT Bus) | 7 | Nos | 3,000 ₹21,000 | 2,680 ₹18,760 Lowest |
Tender Value
Refer Docs
EMD Value
₹4,200
Closing Date
16 Feb 2026, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPS-I ES Circle EM-I Breakdown maintenance of Turbo Generator and its auxiliaries HT cables Station Transformer and LT Bus fault attending works in Unit I to IV during emergency for a period of 12 months from the date of commencement of work.
2026_EB_654480_1
CE-MTPSI-SE-ES-EMI-OT135-25-26
Open Tender
Electrical Works
Works
365 days
MTPS-I/METTURDAM
As per tender specification
4 documents required · 4 mandatory
₹0
₹4,200
Yes
15 Jul 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
16 Feb 2026
10 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for dismantling lifting and leading the Polishing unit from 4.5mtr. area to DM Plant for regeneration of the resin, Dismantling of outlet flanges, Cleaning of the mesh and reassembling with new gaskets, and back to its original position.(any one of unit ) | 2 | Nos | - | - |
| 2 | Charges for drying out the Stator winding by circulating Hot air and puffing work.( any one of unit ) | 2 | Nos | - | - |
| 3 | Charges for Purging of H2 gas in TG casing. (any one of unit ) | 4 | Nos | - | - |
| 4 | Charges for filling of H2 gas in TG casing.( any one of unit ) | 4 | Nos | - | - |
| 5 | Charges for conducting Air Tightness Test and attending minor leaks of H2 gas system. (any one of unit ) | 4 | Nos | - | - |
| 6 | Charges for removing the 15.75KV Bus links and connecting shorting bar across the bus for Generator SC test purpose and removing the shorting bar and normalizing the Bus. (any one of unit ) | 1 | Nos | - | - |
| 7 | Charges for laying / dismantling the HT 1CX500 Sq. mm. Armoured Aluminium Power cable including loading, transporting & unloading of cable from central stores to site and devoluting the remaining to the stores.(any one of unit ) | 200 | Mtrs | - | - |
| 8 | Charges for laying / dismantling the HT 3CX185 Sq mm Armoured Aluminium Power cable including loading,transporting & unloading of cable from central stores to site and devoluting the remaining to the stores. (any one of unit ) | 200 | Mtrs | - | - |
| 9 | Charges for dismantling and assembling of HT / LT terminal links of 31.5 MVA Station Transformer | 2 | Nos | - | - |
| 10 | Charges for Releasing and assembling of horizontal bus bar inter connectors in R, Y, B phases (2 Joint / Phase ( top & bottom) i.e, 6 Joint per location) (any one unit LT Bus) | 7 | Nos | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_784792.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].