Loading…
Loading…
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
15 Jul 2026, 4:00 pm5d left
Executive Engineer Left River Works Division
Office of Executive Engineer LRWD, SMC at Old Funds office Building Karan Nagar near National School Municipal Park
Construction Of Lane/Drain Near The House Of Mohammad Sidiq Malik At Nawab Bazaar
2026_HAUDD_314492_2
NIET 14 e-tendering /2026-27 LRWD
Open Tender
Civil Works
12 days
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
Municipal Account 0216010200000007
₹6,000
Yes
3 Jul 2026
3 Jul 2026
16 Jul 2026
3 Jul 2026
15 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Engagement of labourers for clearance of site etc. | |||||
| 2Dismantling damged tile work in floors including stacking material within 50 meters lead.including disposal of unservicable material within 50m lead as per directions of engineer incharge. | |||||
| 3Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in- charge:1:3:6 or richer mix (i/c equivalent design mix) | |||||
| 4 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: (1 meter from cutting edge ) All kinds of soil | 1 | CUM | - | - |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1 | CUM | 1 | ₹1 |
| 6 | Form work centering / shuttering including Strutting, Propping etc and removal of form work for:
(a) Foudation, footings, basis, coloums etc | 1 | SQM | - | - |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 1 | CUM | - | - |
| 8 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. | - | SQM | 1 | - |
| 912mm thick cement plaster 1:4 mix (1 Cement :4 sand ) | |||||
| 10 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete job including all carriages complete job.
(a) (Welded.) | 1 | KG | 1 | ₹1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_1018232.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid