Tender Value
₹7.2 L
EMD Value
₹21,486
Closing Date
1 Aug 2026, 3:00 pm6d left
CE
Ghaziabad Nagar Nigam
Ward 50 saraswati vihar m S.K. engineer se shri bake bihari packging tak nali, interlocking tiles ka karye
2026_DOLBU_1170833_8
128/Nirman/2026-27 Date 17-07-2026
Open Tender
Civil Works
Percentage
Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,416
Yes
₹21,486
Yes
21 Jul 2026
21 Jul 2026
1 Aug 2026
21 Jul 2026
1 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in- charge within a distance of 60 metre (200 feet). PWD SOR 2022 17.3 | 1.89 | M3 | 1,340 | ₹2,532.6 |
| - | Earth Work in Embankment (lead upto 8 km) in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m in depth earth work in embenkment to in 20 cm layers including remming and dressing the surface to required levels and slops also including 1.50 m lift and 30 m lead. The earth form cutting to be used in making in embekment or to be disposited and spoil banks with in 30 .(AS PER PWD SOR 2022/231( a)+253 (a) S I NO-4.03. | 84 | M3 | 295.1 | ₹24,788.4 |
| - | S/L P:C:C (1:6:12) with 40 mm gauge brick ballast ,fine sand of 1.25 f.m and cement in foundation and under floor including all materials, labour, tools, & plant etc all completed as per the direction of engineer - in - charge.{ AS PER PWD SOR 2022 PAGE NO 18 SI NO 5.01 ITEM NO 273 } | 6.3 | M3 | 4,000 | ₹25,200 |
| 4 | First class Brick Work in (1:4) cement & four coarse sand 2.20 F.M. morter in foundation and plinth and T&P etc all completed as per the direction of engineer - in - charge. (AS PER PWD SOR 2022 PAGE NO 20 SI NO 6.05 ITEM NO 305 (a) | 19.69 | M3 | 5,170 | ₹1,01,823.15 |
| - | 12 mm thick plaster with cement and coarse sand of1.25 fineness modules in (1:4) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, tools & plant etc required for proper completion of the work. (AS PER PWD SOR 2022 PAGE NO 36 SI NO 13.11 NEW ITEM ) | 123.36 | M2 | 200 | ₹24,672 |
| - | S/S of 22.4 to 53mm gauge stone ballast with stacking for measurment etc. all complete as per the direction of Engineer in charge (AS PER PWD SOR 2020 RMR) | 22.93 | M3 | 2,151.2 | ₹49,331.32 |
| - | Supply of screening material with stacking for measurment etc all complete as per the direction of engineer in-charge .AS PER PWD SOR 2020 RMR | 4.13 | M3 | 2,050.2 | ₹8,462.73 |
| - | Consolidation of stone aggregates of 45-63 mm/22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2/3 as per Technical Specification Clause 405. AS PER PWD SOR 2022 20.2.1 | 22.93 | M3 | 690 | ₹15,823.08 |
| - | Supply & laying 80 mm thick Precase cement concrete i-shape interlocking paver block (Grey color) with top layer of having plan dimension 200X(160+120mm) of O.P cement smoothing gloss finish, skid resistant manufacturered from rubber moulds through vibro-compression mechanism. the compressive strength of concrete paver block shall not be less than 30 mpa (M-30) and weight 5kg .per no. confirming to 15:15658-2006 including cost of material, labour,t&p etc. required for proper completion of the work as directed by Engineer -in-charge | 336 | M2 | 930 | ₹3,12,480 |
| - | R.C.C work with cement ,approved coarse sand & 2cm gauge approved stone grit in proportions of 1:1.5:3 in lintels of doors &windows excluding supply of reinforcement and its bending ,but including its fixing and binding wire including necessary cantering and shuttering etc .and supply of all materials,labour,tools& plants etc. required for proper completion of the work including cost of binding wire. the rate excludes making of drip course which shall be paid extra etc all complete as per direction of engineer in charge.(AS PER PWD SOR 2020/283 a .) | 1.93 | M3 | 8,640 | ₹16,692.48 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_2198539.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].