Tender Value
₹1.4 Cr
EMD Value
₹8.8 L
Closing Date
22 Sept 2026, 12:00 pmClosed
Om Prakash Verma
SE Sultanpur-Amethi Circle PWD Sultanpur
Construction of Gothwa to Basayakpur link road
2026_CEUFZ_1183201_2
3005/1com-Sul.A.Cir./2026-27 Dt 25.08.2026
Open Tender
Civil Works - Roads
Fixed-rate
180 days
Amethi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹8.8 L
Yes
SE Sultanpur-Amethi Circle PWD Sultanpur
22 Sept 2026
7 Sept 2026
22 Sept 2026
7 Sept 2026
22 Sept 2026
7 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits not exceeding 1/2 metre in depth and earthwork in embankment to be in 20cm. layers including ramming and dressing the surface to required levels and slopes and also including 1.5 metre lift and 30m. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with in 30m. distance as directed by the engineer in charge. | 3,500 | Cum | 88 | ₹3,08,000 |
| 2 | Construction of Granular sub base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and complacting with smooth wheel roller to achieved the desired density. complete as per clause 401 | 380 | Cum | 3,250 | ₹12,35,000 |
| 3 | Earthwork in cutting or in embankment in ordinary soil excavation to be in the from of regular pits not exceeding 1/2 metre c 20'' in depth and earthwork in embankment to be in 20 cm(8) Layers including ramming and derssing the surface to required levels. in Patri | 1,050 | Cum | 88 | ₹92,400 |
| 4 | Providing laying spreading and compacting stone aggregates of specific sizes to water bound macadam (G-3) specification including spreading in uniform thickness, hand packing rolling with 3-wheeled steel/vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density. | 281.25 | Cum | 4,100 | ₹11,53,125 |
| 5 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, | 562.5 | Cum | 8,700 | ₹48,93,750 |
| 6 | Excavation in foundation in ordinary soil, loame, clay or sand including lift upto 1.50 in & lead upto 30 m Including filling watering & ramming of excavated earth into the trenches or upto the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30 m from the foundation trenches. S.I. 2.6.1( For Drain) | - | Cum | 120 | - |
| 7 | Cement concrete with 2 cm gauge stone gritt. Approved coarse sand and cement in the proportion of 6:3:1 insluding supply of all materials labour and T&P etc. required for poper completion of the work. S.I. 4.1.8 ( For Drain) | - | Cum | 5,800 | - |
| 8 | Providing plain/ Reinforced Cement Concrete in U-Tpye Drain as per Drawing and Technical Specifications ( For Drain) | - | Cum | 7,560 | - |
| 9 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 ( For Drain) | - | MT | 81,000 | - |
| 10 | Construction of H.P. culverts 350 mm and 600 mm dia NP3 H.P.
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth up to 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge 2.1.1 all kind soil. 0.30 m & Above DAR no. 2.6.1 | - | Cum | 120 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BOQ_2225160.xls
BOQ • 0.27 MB
Coorigendum05RoadSE.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .