Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹6,700
Closing Date
26 Oct 2026, 2:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CE/NCTPS-III
NCTPS III CHENNAI 600120
NCTPS III Mechanical I Circle Common Auxiliaries Division RODM Plant Dismantling and Erection of MSRL Supports including cost of materials in the SWRO dosing tank agitator area and acid tank area during annual overhaul for the year 2026 27
2026_EB_712523_1
CE/NCTPS III/SE/M-I/OT-16/26-27
Open Tender
Maintenance Works
Item Rate
60 days
NCTPS III CHENNAI
REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹0
₹6,700
Yes
9 Oct 2026
9 Oct 2026
27 Oct 2026
9 Oct 2026
26 Oct 2026
9 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Material Supply Portion: | |||||
| 1.01 | Supply of 16 mm thick plate | 0.52 | MT | 102 | ₹52.84 |
| 1.02 | Supply of ISMC 125 | 2.93 | MT | 102 | ₹298.86 |
| 2Labour Charges: | |||||
| 2.01 | Charges for Erection of necessary scaffolding arrangements in SWRO agitator and its dozing area including T & P's and consumables etc., and dismantling the scaffolding arrangement after completing the work. | 120 | SQ.MTR | 102 | ₹12,240 |
| 2.02 | Charges for removal of Agitator in SWRO chemical dosing tank Agitator by Decoupling the motor and gearbox, gearbox shaft coupling and removal from tank, after completion of structure work refixing gearbox with shaft coupling and coupling the motor and gearbox including consumables and hire charges for T&P,s. | 6 | NOS | 102 | ₹612 |
| 2.03 | Charges for fabrication and erection of MSRL supporting structure in SWRO agitator and its dozing area, including transportation, hire charges for T&P and cost of consumables. | 3.45 | MT | 102 | ₹351.9 |
| 2.04 | Charges for providing and placing RCC 1:1 1/2:3 using 20 MM HBG metal including cost of all materials, lead, lift labour, LWF, vibrating charges and mixing charges excluding the cost of reinforcement etc., complete, including consumable and T&P’s. | 0.45 | M3 | 102 | ₹45.9 |
| 2.05 | Charges for rubber lining, Sand blasting, Coating of adhesive compound providing 8 hours gap between each coating before patching of natural rubber, rubber lining (Vulcanizing) by hot banding process of the acid line, ejector pipe and lye line pipe inclusive of T & Ps and consumables. | 87.92 | SQ.MTR | 102 | ₹8,967.84 |
| 2.06 | Paving the floor with acid alkali resistance tiles/bricks with standard specification and using acid alkali resistance tiles/bricks | 5.76 | SQ.MTR | 100 | ₹576 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_855891.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .