Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-Finance | ₹3.0 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹3.0 CrAccepted-Finance | ₹3.0 Cr | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | M/s Dt Enterprises L2 | MS Gesum Enterprises L1 |
|---|---|---|---|---|---|
| 1.00Sub Head -I Retaining Wall 77.90 Mtr 10 Nos | |||||
| 1.01 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Ordinary soil
Manual Means
upto 3 mtr | 1,157.7 | cum | 252 ₹2.9 L | 250 ₹2.9 L |
| 1.02 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 8.33 | cum | 8,731 ₹72,729.23 | 8,731 ₹72,729.23 |
| 1.03 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
RCC Grade M20 | 1,113.22 | cum | 11,324 ₹1.3 Cr | 11,324 ₹1.3 Cr |
| 1.04 | Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications | 61.52 | mtr | 1,20,909 ₹74.4 L | 1,20,909 ₹74.4 L |
| 1.05 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications | 409 | Nos | 242 ₹98,978 | 242 ₹98,978 |
| 1.06 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification | 2,272.8 | cum | 2,020 ₹45.9 L | 2,020 ₹45.9 L |
| 2.00Sub Head -II RCC Culvert 6 Mtr 1 No | |||||
| 2.01 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material
Manual Means
Depth upto 3m | 166.95 | cum | 252 ₹42,071.40 | 250 ₹41,737.50 |
| 2.02 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 27.73 | cum | 8,731 ₹2.4 L | 8,731 ₹2.4 L |
Tender Value
₹3.0 Cr
EMD Value
₹3.0 L
Closing Date
6 Jan 2026, 10:30 amClosed
Executive Engineer, PWD, Gensi Division
O/o Executive Engineer, Gensi PWD Division, Gensi
construction of bridge and culvert
2025_PWDAP_2881_1
GD/S-08/2025-26/01
Open Tender
Civil Works – Roads
Siji
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
EE PHED Roing
₹3.0 L
Yes
Likabali
6 Jan 2026
30 Dec 2025
6 Jan 2026
30 Dec 2025
6 Jan 2026
30 Dec 2025
2 Jan 2026
Amount
Sub Head -I Retaining Wall 77.90 Mtr 10 Nos
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil Manual Means upto 3 mtr
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications RCC Grade M20
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
Sub Head -II RCC Culvert 6 Mtr 1 No
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material Manual Means Depth upto 3m
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification A RCC Grade M20 Case I Using Concrete Mixer (i) For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m
Supplying, fitting and placing HSD bar reinforcement in Superstructure complete as per drawing and technical specification
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
M/s Dt Enterprises (BID ID -8310)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_3078.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
technicaldocuments.pdf
Tender Documents • 1.46 MB
BOQ_3078.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid