| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹37.7 L+₹2.5 L (7.10%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹38.9 L+₹3.7 L (10.4%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹40.6 L+₹5.4 L (15.3%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹41.9 L+₹6.7 L (18.9%)Admitted-Finance CHALIHA GAON PO CHALIHA DISTT JORHAT ASSAM PIN 785004 | JORHAT | ASSAM | 785004 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s T D Sen and Co L2 | RAJIB GOSWAMI ENTERPRISE L5 | BCL L3 | TANKESWAR BORA L4 | MD ABIDUR ALI L1 |
|---|---|---|---|---|---|---|---|---|
| 0.00NOTE:- (i) The bidders/contractors are advised to read tender document & all corrigendum / amendments and General conditions of contracts before entrying/quoting the rates. (ii) It is highlighted that the certain condition of General Condition of Contracts (IAFW-2249) has been modified as per direction of MoD i.e. inclusssion of Performance Security, deletion of Risk & Cost Provisions and increase in defect liability period all as per tender documents. The tenderers should keep in mind while quoting their offer. (iii) (Applicable for all items/parts):- The bidders/contractors are advised to refer Notes on BOQ/SCH'A' before entry/quoting the rates. | ||||||||
| 1.00 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quions, arches, pillers etc complete all as specified and as directed. | 10 | Cum | 250 ₹2,500 Lowest | 300 ₹3,000 | 250 ₹2,500 Lowest | 250 ₹2,500 Lowest | 390 ₹3,900 |
| 2.00 | Dismantling plain or corrugated steel sheeting, any gauge, thickness including Nainital or similar pattern roof covering complete all as specified and as directed. | 858 | Sqm | 15 ₹12,870 Lowest | 50 ₹42,900 | 20 ₹17,160 | 25 ₹21,450 | 80 ₹68,640 |
| 3.00 | Dismantling Wall and ceiling boards (fibre,pulp, insulation, etc.) or insulation boards/slabs/blankets, any thickness, including cover fillets complete all as specified and as directed. | 60 | Sqm | 15 ₹900 Lowest | 50 ₹3,000 | 25 ₹1,500 | 15 ₹900 Lowest | 75 ₹4,500 |
| 4.00 | Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for Key, scrubbing down with water etc. complete all as specified and as directed. | 608 | Sqm | 15 ₹9,120 Lowest | 50 ₹30,400 | 30 ₹18,240 | 30 ₹18,240 | 18 ₹10,944 |
| 5.00 | Demolition of reinforced cement concrete in roofs, floors (other than ground floors), beams staircases, landing, chajjas and similar suspended work (reinforcement to be cut as required to facilitate demolition) complete all as specified and as directed. | 4 | Cum | 250 ₹1,000 Lowest | 400 ₹1,600 | 300 ₹1,200 | 250 ₹1,000 Lowest | 400 ₹1,600 |
| 6.00 | Demolition of cement concrete of (unreinforced) any description and any position not otherwise specifically provided for and removal of rubbish from the site complete all as specified and as directed. | 21.8 | Cum | 250 ₹5,450 Lowest | 400 ₹8,720 | 315 ₹6,867 | 350 ₹7,630 | 400 ₹8,720 |
| 7.00 | Demolition of cement concrete (unreinforced) in ground floors and paving not exceeding 15cm thick (below or above ground level) and removal of rubbish from the site complete all as specified and as directed. | 19.22 | Cum | 250 ₹4,805 Lowest | 400 ₹7,688 | 350 ₹6,727 | 250 ₹4,805 Lowest | 400 ₹7,688 |
| 8.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for and segregating serviceable materials and keeping for reuse at site and removing unserviceable materials from site of work complete all as specified and as directed. | 9 | Qtl | 300 ₹2,700 Lowest | 500 ₹4,500 | 410 ₹3,690 | 300 ₹2,700 Lowest | 400 ₹3,600 |
| 9.00 | Material and labour for hardcore of gauge not exceeding 63mm, deposited, spread and levelled in layers not exceeding 15cm thick, watered and rammed to a true surface complete all as specified and as directed. | 9 | Cum | 2,600 ₹23,400 Lowest | 3,000 ₹27,000 | 2,700 ₹24,300 | 4,000 ₹36,000 | 3,300 ₹29,700 |
Tender Value
₹36.5 L
EMD Value
₹73,000
Closing Date
31 Aug 2026, 6:00 pmClosed
GARRISON ENGINEER JORHAT
GARRISON ENGINEER JORHAT
SPECIAL REPAIR TO BLDG NO P30 LPG SHED AT BHALUKMARA UNDER GE JORHAT
2026_MES_782189_1
8336/GE/E8
Open Tender
Civil Works
Item Rate
180 days
GE JORHAT
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GARRISON ENGINEER JORHAT
₹73,000
Yes
25 Sept 2026
3 Aug 2026
1 Sept 2026
3 Aug 2026
31 Aug 2026
17 Aug 2026
3 Aug 2026 - 10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quions, arches, pillers etc complete all as specified and as directed. | 10 | Cum | - | - |
| 2 | Dismantling plain or corrugated steel sheeting, any gauge, thickness including Nainital or similar pattern roof covering complete all as specified and as directed. | 858 | Sqm | - | - |
| 3 | Dismantling Wall and ceiling boards (fibre,pulp, insulation, etc.) or insulation boards/slabs/blankets, any thickness, including cover fillets complete all as specified and as directed. | 60 | Sqm | - | - |
| 4 | Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for Key, scrubbing down with water etc. complete all as specified and as directed. | 608 | Sqm | - | - |
| 5 | Demolition of reinforced cement concrete in roofs, floors (other than ground floors), beams staircases, landing, chajjas and similar suspended work (reinforcement to be cut as required to facilitate demolition) complete all as specified and as directed. | 4 | Cum | - | - |
| 6 | Demolition of cement concrete of (unreinforced) any description and any position not otherwise specifically provided for and removal of rubbish from the site complete all as specified and as directed. | 21.8 | Cum | - | - |
| 7 | Demolition of cement concrete (unreinforced) in ground floors and paving not exceeding 15cm thick (below or above ground level) and removal of rubbish from the site complete all as specified and as directed. | - | Cum | - | - |
| 8 | Dismantling wrought iron or mild steel work of any description not otherwise provided for and segregating serviceable materials and keeping for reuse at site and removing unserviceable materials from site of work complete all as specified and as directed. | 9 | Qtl | - | - |
| 9 | Material and labour for hardcore of gauge not exceeding 63mm, deposited, spread and levelled in layers not exceeding 15cm thick, watered and rammed to a true surface complete all as specified and as directed. | 9 | Cum | - | - |
| 10 | Material and labour for PCC (1:3:6) type C2 (using 40mm graded stone aggregate) as in surface channel, drains and like etc. complete all as specified and as directed. | 21.8 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
1_CONTENT_TO_NOTE_8336.pdf
Tender Documents • 0.71 MB
2_General_Condition_8336.pdf
Tender Documents • 0.78 MB
3_Spl_Con_8336.pdf
Tender Documents • 0.38 MB
4_PS_8336.pdf
Tender Documents • 1.67 MB
BOQ_876282.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .