| 1 | L1₹12.8 LAccepted-AOC 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 UDYAM WB 23 0013338 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | ₹12.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹12.9 LRejected-Finance 6 KRIPANATH DUTTA ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | ₹12.9 L | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹12.9 LRejected-Finance 5 3 1 GAGAN SARKAR ROAD KOLKATA 700 010 | KOLKATA | KOLKATA | WEST BENGAL | 700010 | ₹12.9 L | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | INDRANI ENTERPRISE H1 | DEY ENTERPRISE H3 | B T PROJECTS PRIVATE LIMITED H2 |
|---|---|---|---|---|---|---|
| 1.00N.B:-All Quoted Rates are inclusive of GST @ 18% + CESS @ 1% | ||||||
| 2.00 | Technician Charges for fitting-fixing of geared operated motors (dept.) at the basement support of the lighting towers including all electrical connection complete as per direction of EIC ( 2 nos motors in each 10 units and 3 nos motors each of 2 units) | 12 | Units | 732 ₹8,784 | 725.2 ₹8,702.40 | 729 ₹8,748 |
| 3.00 | Carrying and positioning of Telescopic tilting type lighting tower including control panel, cable, luminaries etc. to site i.e. different zone at Mela ground by hiring of car and all other necessary arrangement as per requirement including and unloading complete | 12 | Units | 7,070 ₹84,840 | 7,001.49 ₹84,017.88 | 7,036 ₹84,432 |
| 4.00 | Fitting fixing of the luminaries (8 Nos.) on the lighting tower and laying of the 10 Sq. mm. PVC insulated Aluminium Armoured cable with all interconnection complete with testing of the same as per direction of the EIC. [cable will be supplied by the department] | 12 | Units | 14,125 ₹1.7 L | 13,987.16 ₹1.7 L | 14,056 ₹1.7 L |
| 5.00 | Carrying back the Telescopic tilting type lighting tower including control panel, cable, luminaries etc. to PHE store after dismantling the luminaries, accessories, cable etc. at Sagar by hiring of car and all other necessary arrangement after completion of Mela including and unloading complete | 12 | Units | 7,070 ₹84,840 | 7,001.49 ₹84,017.88 | 7,036 ₹84,432 |
| 6.00 | Guarding arrangement of the whole installation round the clock as per direction of the EIC [10 days] | 12 | Days | 1,664 ₹19,968 | 1,648.19 ₹19,778.28 | 1,656 ₹19,872 |
| 7.00 | Technician Charges for dismentling of geared operated motors (dept.) at the basement support of the lighting towers including all electrical disconnection complete and returned to site store as per direction of EIC ( 2 nos motors in each 10 units and 3 nos motors each of 2 units) | 12 | Units | 732 ₹8,784 | 725.2 ₹8,702.40 | 729 ₹8,748 |
| 8.00 | Carrying the 15 nos defective submersible pump motor set from Ganga Sagar store to Kolkata work shop by hired vehicle including loading unloading and rivercrossing complete as per direction. | 1 | Trip | 18,324 ₹18,324 | 18,145.16 ₹18,145.16 | 18,235 ₹18,235 |
| 9.00 | Dismantling the submersible pump motor set parts by parts for repairing purpose as directed. | 15 | Sets | 260 ₹3,900 | 257.67 ₹3,865.05 | 259 ₹3,885 |
| 10.00Supply the following spares for pump:- | ||||||
Tender Value
Refer Docs
EMD Value
₹24,500
Closing Date
17 Nov 2025, 10:00 amClosed
Executive Engineer ,SMD , PHED
Chetla ,Kolkata-700027
As per NIeT Documents in connection with ganga Sagar Mela 2026
2025_PHED_926253_8
WBPHE/EE/SMD/NIeT-42 of 2025-26
Open Tender
MISC ELECTRICAL WORKS
60 days
Sagar Island, South 24 Pgs
Please refer Tender documents.
7 documents required · 7 mandatory
₹24,500
8 Apr 2026
29 Oct 2025
19 Nov 2025
29 Oct 2025
17 Nov 2025
29 Oct 2025
Amount
Technician Charges for fitting-fixing of geared operated motors (dept.) at the basement support of the lighting towers including all electrical connection complete as per direction of EIC ( 2 nos motors in each 10 units and 3 nos motors each of 2 units)
Carrying and positioning of Telescopic tilting type lighting tower including control panel, cable, luminaries etc. to site i.e. different zone at Mela ground by hiring of car and all other necessary arrangement as per requirement including and unloading complete
Fitting fixing of the luminaries (8 Nos.) on the lighting tower and laying of the 10 Sq. mm. PVC insulated Aluminium Armoured cable with all interconnection complete with testing of the same as per direction of the EIC. [cable will be supplied by the department]
Carrying back the Telescopic tilting type lighting tower including control panel, cable, luminaries etc. to PHE store after dismantling the luminaries, accessories, cable etc. at Sagar by hiring of car and all other necessary arrangement after completion of Mela including and unloading complete
Guarding arrangement of the whole installation round the clock as per direction of the EIC [10 days]
Technician Charges for dismentling of geared operated motors (dept.) at the basement support of the lighting towers including all electrical disconnection complete and returned to site store as per direction of EIC ( 2 nos motors in each 10 units and 3 nos motors each of 2 units)
Carrying the 15 nos defective submersible pump motor set from Ganga Sagar store to Kolkata work shop by hired vehicle including loading unloading and rivercrossing complete as per direction.
Dismantling the submersible pump motor set parts by parts for repairing purpose as directed.
Supply the following spares for pump:-
a) Neck Ring
b) Shaft sleeve bush
c) G.M coupling Bush
Supply the following spares for motor:-
a) Rotor Bush
b) Oil Seal
c) Thrust bearing with SS thrust plate
Repairing the pump set by the above supplied materials & replacing the fast moving spares . E.g Impeller, diffuser ring, coupling, bush whichever in necessary to complete the job as directed.
Rewinding of the 7.5 HP motor with suitable size copper wire and all other necessary materials to complete the work as per direction.
Rewinding of the 5 HP motor with suitable size copper wire and all other necessary materials to complete the work as per direction.
Rewinding of the 10 HP motor with suitable size copper wire and all other necessary materials to complete the work as per direction.
Reassembling the pump set parts by parts which has been incorporated in item no. 4-11 as directed.
Carrying back the repaired 15 nos submersible pump motor set from Kolkata work shop to Ganga Sagar store by hired vehicle including loading unloading and rivercrossing complete as per direction.
Supply on hire basis of 9 mtr. Long MS pole and erection and fitting fixing the same at different places as per direction of EIC for the period from 06-01-2026 to 16-01-2026
Providing on hire basis including supplying, laying of 4 sq.mm 1.1 kv single core PVC instated and sheathed stranded aluminium cable. and transportation charges for the following cables including dismantling the same after completion of the mela
Drawing of 150 watt LED street light fixture in different place of road,on hire basis from 06-01-2026 to 16-01-2026 (11 days x 80 fittings per day)
Providing on hire basis and laying of 1100 V grade 3 ½ core 25 sq. mm. PVC Al. Ar. Cable and dismantling the same after mela.
Supply on hire basis Installation of power distrubution panel boards for power draw & supply from WBSEDCL in different substation ( 2 No Substation) including electrical inter connectionfrom departmental panel bioard to WBSEDCL panel board for LT distribution line before 05.01.2026 including proper earthing arrangement complete as per direction of EIC.
Making Earthing arrangement on hire basis supply 5/8'' dia earth spike of 2 mtr. Long with galvanized bolts nuts sand washer etc. including supply and fixing 8 SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of PCC pole.
Cutting the all road side trees and trimming for proper illumination of road (aprox 2km).
Constraction of 12ft x 14ft hogla shed by supplying bamboo, polythine sheet, hogla, nall etc as per direction of EIC only for personnel (not for DG set) only for gurding personals.
Guarding arrangement of the whole installation for the entire period.from 06-01-2026 to 16-01-2026 [ 1 person /shift x 3 shifts x 11 days] [ Rate will be as per Labour commission ,WB ; minimum wages ]
Transportation charges of 100Ltr Frp based propellor incorporated chlorination system from Ganga Sagar PHE Bunglow site store to work site including loading-unloading at both ends including transportation charge all complete
Installation of the above supplied arrangement & synchronising with the existing chlorination system all complete as per direction of EIC
Dismantling the arrangment & returned back to Ganga Sagar PHE Bunglow site store including loading-unloading at both ends including transportation charge all complete
B T PROJECTS PRIVATE LIMITED (BID ID -7307045)
DEY ENTERPRISE (BID ID -7326803)
stage.html
html • 0.05 MB
technical_2192166.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 1.00 MB
Tendernotice_3.pdf
PDF • 0.13 MB
Tendernotice_4.pdf
PDF • 1.14 MB
BOQ_2192166.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid