| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-AOC | ₹1.2 Cr | 1 | Accepted-AOC . |
| 2 | 2₹1.2 Cr+₹27,077 (0.23%)Rejected-AOC | ₹1.2 Cr+₹27,077 (0.23%) | 2 | Rejected-AOC . |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
26 Jul 2019, 3:00 pmClosed
Project Director
DRDA, 3rd floor, Collectorate, Theni
Construction of OHT,drainage 4 no.s ,Providing borewell ,motor with pipeline and strengthening of 3 roads inAndipattii Block under SCPAR 2018-19
2019_RDTN_131339_1
38/2019/D5 Dated 05.07.19
Open Tender
Civil Works
Item Rate
180 days
Theni
As per tender document
3 documents required · 3 mandatory
₹0
₹1.2 L
21 Jan 2021
8 Jul 2019
26 Jul 2019
8 Jul 2019
26 Jul 2019
8 Jul 2019
Amount
Construction of 30000 litre OHT at Palayakottai H/o: Palayakottai
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B
First depth of 2m
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers.
RCC 1:1.5:3 using 20mm HBG metal for following items
1.5m to 4.5m below GL
0m to 1.5m below GL
0m to 4.5m above GL
4.51m to 7.32 from GL
Above 7.32m & up to 10.98m from GL
Providing steels centering for the soffit of RCC slab using MS angle and sheets laid over country wood joists and strrutting with casuarina props
A. Plane surfaces
Below GL
GL to 3.30m height
4.31 to 5.30m height
5.31 to 6.30m height
B. Curved surface
0 to 3.30m height
C. Square column
Below GL
GL to 3.30m height
3.31 to 4.30m height
4.31 to 5.30m height
Painting two coats with approved emulsion paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by TWAD Board officers
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by TWAD Board officers.
Supply delivery and fixing of outside MS ladder of 45cm wide made up of 50 x 50 x 6mm MS angle welded with 16mm MS rod for step with 30cm center to center as per type design
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 as per type design
supplying and fixing AC cowl for ventilator
Supplying and fixing up manhole cover of size 60cm x 60cm in RCC 1:1.5:3 and 50x50x6mm MS angle at the edges
Pipe connection arrangements for inlet, outlet, overflow, scour arrangements including cost of pipes, valves, specials etc. complete
65mm GI pipes for inlet
65mm GI pipes for over flow and rain water collection
65mm GI pipes for outlet
50mm GI pipes for scour
75 mm pvc threaded coupler
63 mm pvc threaded coupler
65mm GI tee
65mm GI coupling
65mm GI flange set
50mm GI flange set
65mm GI coupling
65mm GI elbow
65mm GI bend
60x50mm GI reducer
90x75mm PVC reducer
65mm GM gave valve
50mm GI gate valve
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers.
Construction of Drainage in main road at Marikundu
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Centering and shuttering charges for rataining wall, bady wall, wing wall side work including cost and conveyance of all labour charges
Centering and shuttering charges for rataining wall, bady wall, wing wall side work including cost and conveyance of all labour charges deck slab
Cement concrete 1:3:6 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by officers.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Plastering with cement mortar 1:5 mix to 12 mm thick including of all other labour charges as per standard specification etc.
Construction of Drainage in Keelamanjinaikanpatti.H/o: Rajathani
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Cement concrete 1:2:4 mix using 20mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
collection supply of well gravel from approved quarry in fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
collection supply and filling of sand including cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Cement concrete 1:3:6 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Centering and shuttering charges for rataining wall, bady wall, wing wall side work including cost and conveyance of all labour charges
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by officers.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Plastering with cement mortar 1:5 mix to 12 mm thick including of all other labour charges as per standard specification etc.
Construction of Drainage at Kanniyappapillaipatti east street H/o: Kanniyappapillaipatti
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Centering and shuttering charges for rataining wall, bady wall, wing wall side work including cost and conveyance of all labour charges
Cement concrete 1:3:6 mix using 20mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Plastering with cement mortar 1:5 mix to 12 mm thick including of all other labour charges as per standard specification etc.
Construction of Drainage at Kothapatti- varatharajapuram main road. H/o: Kothapatti
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Centering and shuttering charges for rataining wall, bady wall, wing wall side work including cost and conveyance of all labour charges
Cement concrete 1:3:6 mix using 20mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Plastering with cement mortar 1:5 mix to 12 mm thick including of all other labour charges as per standard specification etc.
Strengthening of road from G.usilampatty to perumal patty 0/0-1/5
Clearing scrub jungle by uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidental charges etc. complete.Sl.No. 17(3)
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Picking old metalled / BT surface upto 10cm thick as directed by the departmental officers
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Providing and Laying Red Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Provision for KM stone
Provision for HM stone
Provision for name board
Strengthening of road from Melamanjinaickanpatty to ammapatty km 0/0-1/300
Clearing scrub jungle by uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidental charges etc. complete.Sl.No. 17(3)
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Picking old metalled / BT surface upto 10cm thick as directed by the departmental officers
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Providing and Laying Red Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Provision for KM stone
Provision for HM stone
Provision for name board
Strengthening of street road from T.meenachipuram to ponnammalpatty km 0/0-0/480
Clearing scrub jungle by uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidental charges etc. complete.Sl.No. 17(3)
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Supply and filling of US gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Picking old metalled / BT surface upto 10cm thick as directed by the departmental officers
Providing and laying Water Bound Macadam Grading - II(75mm to 22.40mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Provision for HM stone
Provision for name board
Construction of Drainage L/S CH 100-240M and R/S ch 200-300m
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Centering and shuttering charges for rataining wall, bady wall, wing wall side work including cost and conveyance of all labour charges
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by officers.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Cement concrete 1:3:6 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Plastering with cement mortar 1:5 mix to 12 mm thick including of all other labour charges as per standard specification etc.
Strengthening of road in JJ Nagar AD colony streets at Erathimakalpatty
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Supply and filling of US gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Construction of un-reinforced dowell jointed at expansion and construction joint only plain cement concrete pavement thickness as per design over prepared subbsase with 43grade cement as per clause 1501.2.2 M30
Providing bore well, motor and pipe line arrangements at Kathirnrasingapuram. H/O: Kathirnrasingapuram.
Towards Geological Survey charges (Minimum three locations) including transportation charges of material and all labour chages etc,. Complete
Drilling of 150 mm Dia Verticle Bore well in Hard rock area including charges for drilling and inserting of 180 mm casing pipe inside the bore including all labour charges etc,.
Over Burden soil
In Hard rock
Towards cost and delievery of 180 mm PVC Cashing pipe of 6 KSC including all charges etc., complete
G I Pipe & Specials
50 mm GI pipe
50 mm GI Coupling Heavy Type
50 mm GI Bend
50 mm GI Elbow
50 MM Non Return Volve
50 mm GI Union
50 mm MS Clamp set
50 mm GM Gate Volve
50 mm GI H nipple
32 mm GI Pipe
32 mm GI Coupling
4 Sqmm 3 Core flat Cable
Meter Box Cover
Service Connection Wire
24"x36" Meter Board
Supply and Delievery of 7.5 HP Three Phase Submersible Pumpset ( 75 x 225 ) lpm Suitable for 150 mm Dia Bore well with ISI Mark IS 8034/2002 Without Panel Board
Towards Cost and Supply of 7.5 HP Three Phase panel Board -Starter Delta With Two level Guard and Auto Start
Towards Fixing Labour charge of Three Phase Submersible Pumpset Suitable for 150 mm Dia Bore well with ISI Mark IS 8034 Without Panel Board
From OHT to Streets
90 mm PVC Pipe
90 mm PVC Bent
90 mm PVC FTA
50 mm GI Pipe
50 mm GI Coupling
50 mm Gi Elbow
50 mm GM Gate Volve
50 mm GI Union
50 mm GI Tee
50 mm X 20 mm Tee
20 mm GI Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Tap
Earth Work Excavation in all classes of soil including all material and all other material as per Specification S S 20 B
Towerds laying and Joining of 90 mm PVC Pipe
Towerds laying and Joining of 50 mm GI Pipe
Towerds laying and Joining of 32 mm GI Pipe
Towerds laying and Joining of 20 mm GI Pipe
Towerds CuttingCharges 50 mm GI Pipe
Towerds CuttingCharges 20 mm GI Pipe
Towerds Threading Charges for 50 mm GI Pipe
Towerds Threading Charges for 20 mm GI Pipe
Refilling with excavated soil with all labour cost complete complying
Construction of Brick Pedestal suitable for Service connection Meter Bx
Supply and fixing of MS Kioask Box including all cost
Providing bore well, motor and pipe line arrangements at Kolinjipatti. H/O: Ramakrishnapuram.
Towards Geological Survey charges (Minimum three locations) including transportation charges of material and all labour chages etc,. Complete
Drilling of 150 mm Dia Verticle Bore well in Hard rock area including charges for drilling and inserting of 180 mm casing pipe inside the bore including all labour charges etc,.
Over Burden soil
In Hard rock
Towards cost and delievery of 180 mm PVC Cashing pipe of 6 KSC including all charges etc., complete
G I Pipe & Specials
50 mm GI pipe
50 mm GI Coupling Heavy Type
50 mm GI Bend
50 mm GI Elbow
50 MM Non Return Volve
50 mm GI Union
50 mm MS Clamp set
50 mm GM Gate Volve
50 mm GI H nipple
32 mm GI Pipe
32 mm GI Coupling
4 Sqmm 3 Core flat Cable
Meter Box Cover
Service Connection Wire
24"x36" Meter Board
Supply and Delievery of 7.5 HP Three Phase Submersible Pumpset ( 75 x 225 ) lpm Suitable for 150 mm Dia Bore well with ISI Mark IS 8034/2002 Without Panel Board
Towards Cost and Supply of 7.5 HP Three Phase panel Board -Starter Delta With Two level Guard and Auto Start
Towards Fixing Labour charge of Three Phase Submersible Pumpset Suitable for 150 mm Dia Bore well with ISI Mark IS 8034 Without Panel Board
From OHT to Streets
90 mm PVC Pipe
90 mm PVC Bent
90 mm PVC FTA
50 mm GI Pipe
50 mm GI Coupling
50 mm Gi Elbow
50 mm GM Gate Volve
50 mm GI Union
50 mm GI Tee
50 mm X 20 mm Tee
20 mm GI Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Tap
Earth Work Excavation in all classes of soil including all material and all other material as per Specification S S 20 B
Towerds laying and Joining of 90 mm PVC Pipe
Towerds laying and Joining of 50 mm GI Pipe
Towerds laying and Joining of 32 mm GI Pipe
Towerds laying and Joining of 20 mm GI Pipe
Towerds CuttingCharges 50 mm GI Pipe
Towerds CuttingCharges 20 mm GI Pipe
Towerds Threading Charges for 50 mm GI Pipe
Towerds Threading Charges for 20 mm GI Pipe
Refilling with excavated soil with all labour cost complete complying
Construction of Brick Pedestal suitable for Service connection Meter Bx
Supply and fixing of MS Kioask Box including all cost
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R P S SANKARAPANDY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .